SUNSET COVE | Budget
Budget
Phase 1 NFWF/Mitigation Funded: $6.5M• Contaminated fill removal: $2.9M• Clean sand placement and grading: $2M• Wetland and maritime forest/shrubland restoration: $1.3M• Trail and overlooks: $300K
Phase 2 NY Rising Funded: $500K• Oyster habitat and boardwalk construction
Cost estimates are preliminary and based on costs at similar sites. Costs associated with environmentalmitigation may change depending on types and levels of contaminants found.
SUNSET COVE | Conceptual Plan
LOW MARSH
HIGH MARSH
UPLAND
GRASSLAND
NPS PROPERTY LINEPROJECT LIMITSUPLAND BERM
EXISTING BULKHEAD
PROPOSED BOARDWALKPROPOSED OVERLOOK
PATHWAY
PROPOSED TIDAL CHANNEL
SUNSET COVE | Conceptual Plan
SUNSET COVE | Location Map
Tidal Channel and Bulkhead
PRIMARY TIDAL CHANNEL
SECONDARY CHANNEL
NPS BULKHEAD
SUNSET COVE | Conceptual Plan
Park Entrance
PARK ENTRANCE
UPLAND
HIGH MARSH
NPS PROPERTY LINE
BERM AND PATHWAY