Our Mission
Presentation for GCF 2
We are responsible for:
• The generation, transmission, distribution and sale of electrical energy
• The treatment of raw water and supply of potable water
• The treatment and safe disposal of waste water into the environment
At a glance
• Parastatal company created in 1986.
• Headquarters in Roche Caiman, Mahe, Seychelles.
• 1,040 employees
Presentation for GCF 3
At a glance
• 35,000 electricity, 29,000 water and 4,500 sewage customers
• 378 GWh produced (2015)• 6.8 GWh from wind
• 1.3 GWh from distributed rooftop solar
• 8.5 million m3 of water distributed (2015)
• Turnover SCR 1.4 billion
Presentation for GCF 4
Key Assets• La Gogue Dam
• Storage capacity – 970,000 m3
• Rochon Dam• Storage capacity – 50,000 m3
• Desalination plants• Total production capacity
24,000 m3/day
Presentation for GCF 5
Key Assets
• Victoria Power Station B• 11.5 MW capacity
• Victoria Power Station C• 74 MW capacity
• Praslin Power Station• 16.3 MW capacity
• 6 MW Port Victoria Windfarm
• 1,500km low voltage distribution lines
• 185 km 11kV overhead, 70 km 11kV underground
Presentation for GCF 6
Renewable Energy Integration
• Grid Studies Conducted (Energynauticsand Okinawa Enetech)• Grid impact assessment – how the
introduction of RE sources will affect the grid performance
• Dynamic Stability• RE sources are intermittent power sources
• It is important to ensure that alternative dispatchable power sources are available to meet the Load Demand at all times
Presentation for GCF 7
Dump load test – Okinawa Enetech
• 4MW load on a generator.
• Disconnect the generator.
• How does the system react?
Presentation for GCF 8
Renewable Energy Integration - Generation
• Immediate - ensure sufficient Spinning Reserve is available by increasing generator capacity if necessary
• Short-term – possible introduction of adequate Battery Storage within 3 years
Presentation for GCF 9
Transmission and Distribution
• Voltage Profile should be maintained within acceptable limits
Presentation for GCF 10
• 33 kV South Mahe network extension
• Will also have 2 routes to the AnseBoileau Substation.
Presentation for GCF 11
Transmission and Distribution
Major Future Projects
• Raise La Gogue Dam to increase storage capacity by 60%.
• Replacement of 20km of water pipes (transmission and distribution).
• New La Digue sewage treatment plant.
• Construct 5 MW solar park on Ile de Romainville.
Presentation for GCF 13
Ile de Romainville Solar Park
• 5 MWp
• 7 GWh per year, or 2% of total energy demand.
• 5,000 tonnes of CO2 avoided, 1.6 million litres of HFO saved every year.
• US$ 11.2 million.
• Loan from IRENA-ADFD.
• Construction to start in 2017.
Presentation for GCF 14
Ile de Romainville Solar Park
Presentation for GCF 15
Ile de Romainville
New Port
St Anne Jetty
Jetty
400 m