ENVIRONMENTAL COMPLIANCE FOR MINING PROJECTS Presented To Kay-Jet Geoconsult Ltd Ilorin Kwara State. FOR THE PROPOSED MARBLE EXPLORATION AND MINE SITE BELONGING TO AWULESORO MINERAL INVESTMENT LIMITED, AT OWA KAJOLA IN IFELODUN L.G.A, KWARA STATE by Mrs. Comfort Asokoro-Ogaji Managing Consultant, Richflood International Limited (Environmental Consultancy) +234 8034517767 [email protected] 7/5/15 Environmental Consultants; +234 8034517767 [email protected] 1

Presentation to Richflood Client on EIA Requirements

Embed Size (px)

Citation preview

ENVIRONMENTAL COMPLIANCE FOR MINING

PROJECTS Presented

To

Kay-Jet Geoconsult Ltd

Ilorin

Kwara State.

FOR THE PROPOSED MARBLE EXPLORATION AND MINE SITE BELONGING TO AWULESORO MINERAL

INVESTMENT LIMITED, AT OWA KAJOLA IN IFELODUN L.G.A, KWARA STATE

by

Mrs. Comfort Asokoro-Ogaji Managing Consultant, Richflood International Limited

(Environmental Consultancy) +234 8034517767

[email protected]

7/5/15 E

nviron

men

tal Con

sultan

ts; +234 8034517767

comfort@

richflood.com

1

OUTLINE

¢  Introduction

¢ Environmental requirements for mining projects

¢  Procedures for compliance

¢ Recommendations

¢ Conclusion

¢  Proposal to Kay-Jet Geoconsult Ltd

7/5/15 E

nviron

men

tal Con

sultan

ts; +234

8034517767 comfort@

richflood.com

2

WELCOME AND INTRODUCTION

¢ Who Richflood International Ltd is;

(Environmental Consultants and

Laboratory Services e.t.c)

7/5/15 E

nviron

men

tal Con

sultan

ts; +234

8034517767 comfort@

richflood.com

3

ISSUES IN NIGERIA

¢ Loss of Biodiversity, endangered species, loss of freshness in the air we breadth

¢ Deaths e.g in Zamfara Pb Poisoning, Ebonyi Mine water poisoning/ Mining Pit (20m more)

¢ Drinking Water Poisoning e.g in Ibadan ¢ Please name others………………….

7/5/15 E

nviron

men

tal Con

sultan

ts; +234

8034517767 comfort@

richflood.com

4

PICTORIAL DESCRIPTIONS 7/5/15

En

vironm

ental C

onsu

ltants; +

234 8034517767 com

fort@rich

flood.com

5

DESERTIFICATION EROSION

6  

7/5/15 E

nviron

men

tal Con

sultan

ts; +234

8034517767 comfort@

richflood.com

7/5/15 E

nviron

men

tal Con

sultan

ts; +234

8034517767 comfort@

richflood.com

7

Endangered Species Protection

Elephant tusks (ivory)

Gorilla

Croccodile (live & Skin)

Python (live and skin)

African Gray Parrot

Orchids as ornamentals

8  

7/5/15 E

nviron

men

tal Con

sultan

ts; +234

8034517767 comfort@

richflood.com

INTRODUCTION

Nigerian Minerals and Mining R e g u l a t i o n s , P o l i c i e s a n d guidelines (Discussion)

7/5/15 E

nviron

men

tal Con

sultan

ts; +234

8034517767 comfort@

richflood.com

9

INTRODUCTION

1.  Environmental Impact Assessment (EIA)

2.  Environmental Auditing

3.  E n v i r o n m e n t a l P r o t e c t i o n a n d Rehabilitation Programme (EPRP)

4.  Community Development Agreement (CDA)

7/5/15 E

nviron

men

tal Con

sultan

ts; +234

8034517767 comfort@

richflood.com

10

By Dec. 1992 the EIA Decree, now the Environmental Impact Assessment Act (Cap E12) LFN 2004 (EIA Act), was enacted; The enactment of the Environmental Impact Assessment (EIA) Act No. 86 of 1992 is a clear demonstration of the Federal Government's commitment to environmental sustainability. An Environmental Impact Assessment (EIA) is an assessment of the potential impacts whether positive or negative, of a proposed project on the natural environment. Transformation of the EIA Act, into implementation stage resulted in the formulation of the EIA procedural guidlines of 1995 and the EIA process. The EIA procedure was developed as a step by step guide for the prediction of environmental impacts of any development activity and to provide an opportunity to mitigate against negative impacts and enhance positive impacts. Thus, EIA has three main functions:

v To predict problems, v To find ways to avoid them, and v To enhance positive effects.

ENVIRONMENTAL MANAGEMENT TOOLS- EIA 7/5/15

En

vironm

ental C

onsu

ltants; +

234 8034517767 com

fort@rich

flood.com

11

Benefits of carrying out EIA of planned projects are: 1.  improved project design/siting; 2.  promotes informed decision-making; 3.  promotes environmentally sensitive decisions; 4.  increased accountability and transparency during the

development process; 5.  improved integration of projects into their environmental and

social setting; 6.  reduced environmental damage; 7.  improved corporate image of the developer; 8.  a positive contribution towards achieving sustainability. 9.  EIA ensures that the potential problems are foreseen and

addressed at an early stage in the project planning and design. 10.  Avoidance or minimization of adverse environmental effects; 11.  Increased protection of human health; 12.  Reduced project costs and delays; 13.  Reduced risks of environmental harm or disasters; 14.  Increased government accountability and harmonization; 15.  Lessened probability of trans-boundary environmental effects; 16.  Informed decisions that contribute to responsible development

of natural resources.

ENVIRONMENTAL MANAGEMENT TOOLS- EIA 7/5/15

En

vironm

ental C

onsu

ltants; +

234 8034517767 com

fort@rich

flood.com

12

General Objectives of EIA The objectives of any environmental Impact assessment are: To ensure that environmental considerations are explicitly addressed and incorporated into the development decision making process; To anticipate and avoid, minimize or offset the adverse significant biophysical, social and other relevant effects of development proposals; To protect the productivity and capacity of natural systems and the ecological processes which maintain their functions; and To promote development that is sustainable and optimizes resource use and management opportunities. The benefits of EIA are widely recognized, yet the approach has palpable limitations: •  Time consuming and costly •  Partial implementation of the EIA process •  Non-availability of reliable data

ENVIRONMENTAL MANAGEMENT TOOLS- EIA 7/5/15

En

vironm

ental C

onsu

ltants; +

234 8034517767 com

fort@rich

flood.com

13

EIA PROCESS FLOW CHART

7/5/15 E

nviron

men

tal Con

sultan

ts; +234

8034517767 comfort@

richflood.com

14

Nigeria EIA Project Categories 7/5/15

En

vironm

ental C

onsu

ltants; +

234 8034517767 com

fort@rich

flood.com

15

EIA  PROJECT  CATEGORIES  (SIMPLIFIED)  

• Category 3 Projects

If they impact physically on the

environment

• Category 2 Projects

When in sensitive areas

• Category 1 Projects

Mandatory Full Scale Impact

Studies

7/5/15 E

nviron

men

tal Con

sultan

ts; +234

8034517767 comfort@

richflood.com

16

ADMINISTRATIVE PROCEDURES ¢  Register the Project ¢  Develop the EIA Terms of Reference (TOR) ¢  Site Veri!cation Exercise ¢  TOR Approval ¢  First Season Data Gathering ¢  Interim Report Production ¢  Second Season Data Gathering ¢  Draft EIA Report Production ¢  Public Display ¢  Panel Review Exercise ¢  Production of Final Draft EIA ¢  Regulatory Monitoring Exercise ¢  Interim Approval ¢  EIS issuance

THE SCOPE OF THE EIA PROCESS 7/5/15

En

vironm

ental C

onsu

ltants; +

234 8034517767 com

fort@rich

flood.com

17

Environmental Audit is designed to protect the environment with the aim of: •  Assessing performance against a set of requirements or targets, related

to specific issues; •  Evaluating compliance with environmental legislation and corporate

policies; •  Measuring performance against the requirements of an environmental

management system standards; and •  Exploring the potential economic, social and environmental benefits

that an improved performance can achieve. Audit procedures and process

q  Pre-audit information gathering q  Pre-audit interview with management q  Records review q  Facility inspection q  Post-audit interview with management q  Preparation of report q  Implementation of the audit findings

ENVIRONMENTAL MANAGEMENT TOOLS- AUDIT (EA) 7/5/15

En

vironm

ental C

onsu

ltants; +

234 8034517767 com

fort@rich

flood.com

18

7/5/15 E

nviron

men

tal Con

sultan

ts; +234

8034517767 comfort@

richflood.com

19

S/N   SHORT TITLE  1   National Environmental(SANITATION AND WASTES CONTROL )REGULATIONS,2009  2   National Environmental(NOISE STANDARDS AND CONTROL )REGULATIONS, 2009  3   National Environmental (SURFACE AND GROUNDWATER QUALITY

CONTROL)REGULATIONS,2011  4   National Environmental(CONSTRUCTION SECTOR)REGULATIONS,2011  5   National Environmental (PULP AND PAPER, WOOD AND WOOD PRODUCTS SECTOR)

REGULATIONS,2013  6   National Environmental(CONTROL OF ALIEN AND INVASIVE SPECIES)REGULATIONS,

2013  7   National Environmental(ELECTRICAL/ELECTRONIC SECTOR)REGULATIONS,2011  8   National Environmental ( NON-METALLIC MANUFACTURING INDUSTRIES

SECTOR)REGULATIONS,2011  9   National Environmental(ACCESS TO GENETIC RESOURCES AND BENEFIT

SHARING)REGULATIONS,2009  10   National Environmental(OZONE LAYER PROTECTION)REGULATIONS,2009  11   National Environmental(PROTECTION OF ENDANGERED SPECIES IN INTERNATIONAL

TRADE)REGULATIONS,,2011  12   National Environmental(FOOD,BEVERAGES AND TOBACCO SECTOR)REGULATIONS,2009  13   National Environmental(DOMESTIC AND INDUSTRIAL PLASTIC, RUBBER AND FOAM

SECTOR)REGULATIONS 2011  14   National Environmental(CONTROL OF VEHICULAR EMISSIONS FROM PETROL AND

DIESEL ENGINES)REGULATIONS,2011  

LIST OF CURRENT ENVIRONMENTAL REGULATIONS

7/5/15 E

nviron

men

tal Con

sultan

ts; +234

8034517767 comfort@

richflood.com

20

15   National Environmental(CONTROL OF BUSH, FOREST FIRE AND OPEN BURNING)REGULATIONS,2011  

16   National Environmental(MOTOR VEHICLE AND MISCELLANEOUS ASSEMBLY SECTOR)REGULATIONS,2013  

17   National Environmental(WET LANDS, RIVER BANKS AND LAKE SHORES)REGULATIONS,2009  

18   National Environmental(DESERTIFICATION CONTROL AND DROUGHT MITIGATION)REGULATION,2011  

19   National Environmental(PERMITTING AND LICENSING SYSTEM)REGULATIONS,2009  

20   National Environmental(CHEMICAL, PHARMACEUTICAL, SOAP AND DETERGENT MANUFACTURING INDUSTRIES) REGULATIONS,2009  

21   National Environmental(STANDARDS FOR TELECOMMUNICATIONS AND BROADCAST FACILITIES)REGULATIONS,2011  

22   National Environmental(COASTAL AND MARINE AREA PROTECTION)REGULATIONS,2011  

23   National Environmental (SOIL EROSION AND FLOOD CONTROL)REGULATIONS,2011  

24   National Environmental(TEXTILE, WEARING, APPAREL, LEATHER AND FOOT WEAR INDUSTRIAL) Regulations, 2009  

25   National Environmental(WATERSHED, MOUNTAINOUS, HILLY AND CATCHMENT AREAS)REGULATIONS,2009  

S/N   SHORT TITLE  

LIST OF NESREA’s REGULATIONS 7/5/15

En

vironm

ental C

onsu

ltants; +

234 8034517767 com

fort@rich

flood.com

21

Ø Cost of EIA Execution Ø Public Participation Ø Delay in EIA Process Ø Inadequate Screening and Scooping Ø Limited Scope of EIA Review Ø Lack of Awareness Ø Deliberate resistance to compliance with

the Law of the land Ø Weak Enforcement of the EIA Act

CHALLENGES IN THE IMPLEMENTATION OF EIA IN NIGERIA 7/5/15

En

vironm

ental C

onsu

ltants; +

234 8034517767 com

fort@rich

flood.com

22

YOU ONLY NEED TO CONSULT A RELIABLE ENVIRONMENTAL CONSULTANT TO TAKE

YOUR PROJECT THROUGH THE COMPLIANCE PROCESS 7/5/15

En

vironm

ental C

onsu

ltants; +

234 8034517767 com

fort@rich

flood.com

23

TAKE QUESTIONS AND

REACTIONS