Page 2: Introduction to Stormwater BMP's in North Carolina

Building and Facility Owners

Facility Managers Elected Officials Environmentalists Saltwater Fishermen Freshwater Fishermen Hoteliers Hospitality Workers Tax Payers

Parents Grandparents Surfers Water-skiers Boaters Farmers Drinking well users Scientists Healthcare providers Trout fishermen Water drinkers!

Page 3: Introduction to Stormwater BMP's in North Carolina

Stormwater BMP Maintenance & Inspection

Second largest estuary in the U.S.

The Outer Banks barrier islands restrict outflow of run-off

Runoff gets trapped and pollutants cause problems like Red Tide

Page 4: Introduction to Stormwater BMP's in North Carolina
Page 5: Introduction to Stormwater BMP's in North Carolina
Page 6: Introduction to Stormwater BMP's in North Carolina
Page 7: Introduction to Stormwater BMP's in North Carolina
Page 8: Introduction to Stormwater BMP's in North Carolina
Page 9: Introduction to Stormwater BMP's in North Carolina
Page 10: Introduction to Stormwater BMP's in North Carolina
Page 11: Introduction to Stormwater BMP's in North Carolina
Page 12: Introduction to Stormwater BMP's in North Carolina
Page 13: Introduction to Stormwater BMP's in North Carolina
Page 14: Introduction to Stormwater BMP's in North Carolina
Page 15: Introduction to Stormwater BMP's in North Carolina
Page 16: Introduction to Stormwater BMP's in North Carolina
Page 17: Introduction to Stormwater BMP's in North Carolina
Page 18: Introduction to Stormwater BMP's in North Carolina
Page 19: Introduction to Stormwater BMP's in North Carolina
Page 20: Introduction to Stormwater BMP's in North Carolina
Page 21: Introduction to Stormwater BMP's in North Carolina
Page 22: Introduction to Stormwater BMP's in North Carolina
Page 23: Introduction to Stormwater BMP's in North Carolina
Page 24: Introduction to Stormwater BMP's in North Carolina
Page 25: Introduction to Stormwater BMP's in North Carolina
Page 26: Introduction to Stormwater BMP's in North Carolina
Page 27: Introduction to Stormwater BMP's in North Carolina
Page 28: Introduction to Stormwater BMP's in North Carolina
Page 29: Introduction to Stormwater BMP's in North Carolina
Page 30: Introduction to Stormwater BMP's in North Carolina
Page 31: Introduction to Stormwater BMP's in North Carolina
Page 32: Introduction to Stormwater BMP's in North Carolina
Page 33: Introduction to Stormwater BMP's in North Carolina
Page 34: Introduction to Stormwater BMP's in North Carolina

Here in the Triad, we sit at the edge of one of the most precious resources in

the country. Our actions do matter!

Page 35: Introduction to Stormwater BMP's in North Carolina

They prevent this type of “stream” from carrying pollutants into our drinking water supply and our marine estuaries.

Page 36: Introduction to Stormwater BMP's in North Carolina
Page 37: Introduction to Stormwater BMP's in North Carolina
Page 38: Introduction to Stormwater BMP's in North Carolina
Page 39: Introduction to Stormwater BMP's in North Carolina

Trout require:◦ High oxygen levels◦ Clean water◦ Cool water

Stormwater runoff:◦ Contains sediment that kills forage and clogs their

gills◦ Is proven to have a higher temperature than trout

adapt to◦ Contains high nutrient loads that disrupt

ecosystem functions and reduce water quality

Page 40: Introduction to Stormwater BMP's in North Carolina

This is a NASA image of Hurricane Floyd, taken September 15th, 1999.

Page 41: Introduction to Stormwater BMP's in North Carolina
Page 42: Introduction to Stormwater BMP's in North Carolina

Where did they go?

Page 43: Introduction to Stormwater BMP's in North Carolina
Page 44: Introduction to Stormwater BMP's in North Carolina

The left is the Neuse River, the Right is the Trent River. Both areas were flooded, but one has a highly developed watershed and the other has a more

natural watershed.

Page 45: Introduction to Stormwater BMP's in North Carolina

The convergence of the Pamlico Sound with the Atlantic Ocean. Remember, the Pamlico is one of the most sensitive estuaries in the United States. Our sounds are second only to the Chesapeake in size and importance. The fish

that breed here are consumed by humans and are forage for key species such as Blue Fin Tuna, Tarpon, and Humpback Whales to name a few.

Page 46: Introduction to Stormwater BMP's in North Carolina

By treating stormwater on site, we lessen the effect of flash and we retain more of the pollutants?

Would they have contained twelve inches of rain?◦ No, not all of it, but when managing floods, the

amount of impervious surface in a watershed is an important factor.

◦ As our state population grows, and more of our forested lands are disturbed, we lose natural ecosystem benefits and have to recreate them.

Page 47: Introduction to Stormwater BMP's in North Carolina
Page 48: Introduction to Stormwater BMP's in North Carolina

GREEN (ALIVE) GRAY (DEAD)

Grassy swales that cleanse run-off and absorb nutrients.

LID Curbless streets to promote sheet-flow.

Constructed Wetlands that mimic nature.

Rain Gardens/ Bioretetnion Cells that soak up run-off.

Rainwater Harvesting to use for irrigation.

Riparian Buffers to slow the flow.

On-site treatment of quality and quantity.

Rip-rap swales. Curb and Gutter

funneling. Reinforced Concrete Pipe

to move water quickly. Culverts to ditches or

streams that accelerate flash flooding.

Massive regional infrastructure that make private issues public.

Page 49: Introduction to Stormwater BMP's in North Carolina
Page 50: Introduction to Stormwater BMP's in North Carolina

Hydrology Botany Biology Horticulture Wetland Ecology Soil Science Plumbing Grading

Design Vegetation

Management Pest Management Labor Management Equipment

Resources Trained and

Certified Personnel

Page 51: Introduction to Stormwater BMP's in North Carolina

Specialized landscape and site features designed to manage stormwater quantity and quality.

Structural, vegetative or management practices used to protect and improve our surface and groundwater.

Landscape system that treats, stores and reduces stormwater runoff.

These systems treat the stormwater run-off problem at the source and reduce the propensity of streams and rivers to “flash”.

Page 52: Introduction to Stormwater BMP's in North Carolina

Wet ponds Stormwater

wetlands Bioretention cell

or raingarden Level Spreader Permeable

pavement Green roofs Rainwater

Cisterns

Dry detention basins

Grassy swales Sand filters Riparian buffers Infiltration

devices Cartridge filters

Page 53: Introduction to Stormwater BMP's in North Carolina
Page 54: Introduction to Stormwater BMP's in North Carolina
Page 55: Introduction to Stormwater BMP's in North Carolina
Page 56: Introduction to Stormwater BMP's in North Carolina
Page 57: Introduction to Stormwater BMP's in North Carolina
Page 58: Introduction to Stormwater BMP's in North Carolina
Page 59: Introduction to Stormwater BMP's in North Carolina
Page 60: Introduction to Stormwater BMP's in North Carolina
Page 61: Introduction to Stormwater BMP's in North Carolina

Clean Water Act of 1972 (Enabling legislation) Phase I began in 1990 for 6 communities in

NC with +100k persons Phase II began in 1999 for all MS4

communities but was stalled until 2006 with passage of Session Law 2006-246 (MS4 = Municipal Separate Storm Sewer Systems)

NC DENR, DWQ rules◦ http://h2o.enr.state.nc.us/su/

NPDES_Phase_II_Stormwater_Program.htm Local Municipalities interpret and

enforce the legislation. This is where it gets confusing!

Page 63: Introduction to Stormwater BMP's in North Carolina

EPA Storm Water Penalty Authority◦ EPA may seek up to $32,500 per day per violation◦ Current maximum for an Administrative Penalty

Complaint is $152,500◦ Penalties above $152,500 are sought through a

judicial referral to the Department of Justice◦ Historically applied to construction sites, but has

also been used in MS4 violations. (MS4 = Municipal Separate Storm Sewer Systems)

Page 64: Introduction to Stormwater BMP's in North Carolina

EPA, the U.S. Attorney’s Office for the District of Delaware, and the States of Utah and Tennessee entered into a consent decree in September 2005 with Wal-Mart to resolve storm water violations at its store construction sites across the country.

Under the terms of the consent decree, Wal-Mart will be required to use qualified personnel to oversee construction, conduct training and frequent inspections, report to EPA and take quick corrective actions. Wal-Mart will also pay a $3.1 million civil penalty to the United States, Tennessee and Utah, and spend $250,000 on an environmental project to protect sensitive wetlands or waterways in one of nine affected states.

Page 65: Introduction to Stormwater BMP's in North Carolina

Doesn’t hold water for proper draw down time (24 – 72 hours)

No machinery access to slopes Slopes were sloughing off, causing

more erosion Spotty coverage of green plant

material Cost $11,000 to fix

Page 66: Introduction to Stormwater BMP's in North Carolina
Page 67: Introduction to Stormwater BMP's in North Carolina
Page 68: Introduction to Stormwater BMP's in North Carolina
Page 69: Introduction to Stormwater BMP's in North Carolina
Page 70: Introduction to Stormwater BMP's in North Carolina
Page 71: Introduction to Stormwater BMP's in North Carolina

Good access Items found included diapers, a CD

case, yard clippings from the neighbor and a TV remote control

Page 72: Introduction to Stormwater BMP's in North Carolina
Page 73: Introduction to Stormwater BMP's in North Carolina
Page 74: Introduction to Stormwater BMP's in North Carolina
Page 75: Introduction to Stormwater BMP's in North Carolina
Page 76: Introduction to Stormwater BMP's in North Carolina

Nearly impossible access Dead plants Too many of the wrong plants Too overgrown – tree growing in inlet

area Not enough grass on slopes

Page 77: Introduction to Stormwater BMP's in North Carolina
Page 78: Introduction to Stormwater BMP's in North Carolina
Page 79: Introduction to Stormwater BMP's in North Carolina
Page 80: Introduction to Stormwater BMP's in North Carolina
Page 81: Introduction to Stormwater BMP's in North Carolina
Page 82: Introduction to Stormwater BMP's in North Carolina
Page 83: Introduction to Stormwater BMP's in North Carolina
Page 84: Introduction to Stormwater BMP's in North Carolina
Page 85: Introduction to Stormwater BMP's in North Carolina

Plants require special care and selective removal◦ no trees on pond dams, ◦ no cattails, ◦ right plant-right place◦ high marsh versus low marsh

Goose control – limit open water and line of site. Geese fear predators on the bank.

Sunshine is needed to break down pollutants.

Entry and exit points need to be kept clean – water needs to flow as it was intended to.

Page 86: Introduction to Stormwater BMP's in North Carolina

Builds in fore-bay Clogs draw down

orifice Suffocates wetland

plant crowns Redirects sheet

flow into channeled flow

Clogs rip rap dissipators

Page 87: Introduction to Stormwater BMP's in North Carolina

Sediment ponds are not the same as SWBMPs

Sediment from adjacent parcels can ruin SWBMPs

Page 88: Introduction to Stormwater BMP's in North Carolina

The standard is to capture “First Flush” which is, in most areas, 1” of rain.

Other than wet detention basins, a properly working SWBMP should take 24 – 72 hours to drain. (Mosquitoes take about 72 hours to reproduce.)

If the SWBMP is on co-owned property and it fails, the members can be jointly responsible.◦ Financially◦ Legally

Failure can be expensive:◦ Damage to adjoining properties◦ Cost to re-construct◦ Legal expenses◦ Permitting fees

Page 89: Introduction to Stormwater BMP's in North Carolina

SWBMP’s should have clear & separate maintenance agreements for liability reasons. Don’t assume the landscaper is handling it! (They may not be certified.)

Frequent review of site conditions by trained professionals is both valuable and inexpensive.

Removal of Stormwater BMP material currently does NOT have to go to hazardous material waste site, but that may change.

Page 90: Introduction to Stormwater BMP's in North Carolina

Was it installed correctly? Is there deferred maintenance? How much $$$ is in the budget for SWBMP

maintenance and repair? Maintenance and upkeep is the number one

measure to avoid staggering repair bills, but nothing can entirely eliminate the risk of failure.

Page 91: Introduction to Stormwater BMP's in North Carolina

Thank you for your attention and your time today!

Kurt BlandBland Landscaping Company

[email protected]