45 kV Line – Replace ACSR with ACCC Increased line capacity by 75% with 625 amp emergency reserve Reduced line losses by 30% Line loss reduction saves 141,580 MWh / year (=$7.1M @ $50/MWh) Emission reductions saves 83,316 Metric Tons CO2 / year This equates to removing over 17,500 cars from the road Line loss reduction also frees up over 17 MW of generation ($17 M+) es: ouble bundled Drake conductor. Load factor Assumption = 34% exas State Average CO2 = 1.297# / kWh. (1 car = 4.75 MT CO2 / year) ost of wire ~ $15.4M ssuming installation cost of $18.6 M – total project cost $34 Million quals ~$285,000 per circuit mile (WECC Estimate basis) 0 Circuit Mile AEP Project Example

How AEP leveraged CTC Global ACCC Conductor to improve transmission line efficiency, capacity and reliability

Embed Size (px)

Citation preview

Page 1: How AEP leveraged CTC Global ACCC Conductor to improve transmission line efficiency, capacity and reliability

345 kV Line – Replace ACSR with ACCC

• Increased line capacity by 75% with 625 amp emergency reserve• Reduced line losses by 30%• Line loss reduction saves 141,580 MWh / year (=$7.1M @ $50/MWh)• Emission reductions saves 83,316 Metric Tons CO2 / year• This equates to removing over 17,500 cars from the road• Line loss reduction also frees up over 17 MW of generation ($17 M+)

Notes: Double bundled Drake conductor. Load factor Assumption = 34% Texas State Average CO2 = 1.297# / kWh. (1 car = 4.75 MT CO2 / year) Cost of wire ~ $15.4M Assuming installation cost of $18.6 M – total project cost $34 Million Equals ~$285,000 per circuit mile (WECC Estimate basis)

120 Circuit Mile AEP Project Example