29
CP Implementation Samantha Kumarasena Deputy Director National Cleaner Production Centre, Sri Lanka

Cp gp day03 session 11 - implementation of cp solutions - copy

Embed Size (px)

Citation preview

Page 1: Cp gp day03 session 11 - implementation of cp solutions - copy

CP ImplementationSamantha KumarasenaDeputy DirectorNational Cleaner Production Centre, Sri Lanka

Page 2: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 2

Cleaner Production OptionsLow hanging fruits - No cost options

- Low cost, short termInvestment oriented

- Medium cost, medium term- High cost, long term

Page 3: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 3

When is implementation started?

From Day 1!

No cost options are implementedin no time!

Page 4: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 4

When is implementation started? Medium and high cost options that needs a feasibility evaluation most of the time, are normally implemented after the CP assessment completed

Page 5: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 5

What are the essential details when implementing medium and high cost options?

Page 6: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 6

Essential details Detailed technical specification Detailed construction planComparative evaluation &

selection of supplierUtility supply and infrastructureAlternative arrangements for

meeting production & minimizing down time

Commissioning and training

Page 7: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 7

PlanPlan should includeMachinery & equipment

requirementsAll Material RequirementsUtilities requirementsMan Power RequirementsSpace requirementsContractual requirements

including transport/material handling

Resource and task management Plan

Page 8: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 8

Machinery & EquipmentDetailed SpecificationsPotential SuppliersComparative QuotationsAuxiliary Equipment

Page 9: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 9

Material requirementConstruction materialsDown stream equipment

◦Piping, valves◦Wires, cables and electrical fittings

Operational materials◦Chemicals◦Cleaning materials

Page 10: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 10

UtilitiesDoes the new system require

◦Water◦Compressed air◦Steam◦Chilled water◦Safety equipment

Page 11: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 11

Space and layoutDoes the new system needs

extra space and is it availableWill the installation disturb the

current operationWill it cause extra safety risks to

the movement of employees

Page 12: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 12

Man power and trainingDo we have staff for the extra

work?Are they skilled, competent and

trained?Are they experienced?Continuous training of Human

Recourses is an investment

Page 13: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 13

Resource and task management planScheduling of tasksMaterial requirement planning?Storing of materials?Availability and safekeeping of

hand tools

Page 14: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 14

InitiateHave you established your

baseline data?Have you established your

desired output from the project?Have you developed the

performance monitoring indicators?

Can you identify some indicators?

Page 15: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 15

Activity Oct Nov Dec Jan Feb March

Conducting a big cleaning daySorting out all items & labeling Preparing suitableinfrastructure Placing all items in right orderTraining the employeesProgress evaluationRe-implementing with changes

Implementation plan

Page 16: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 16

Execute CP implementation

Supervise construction and installation:◦control progress of work;◦control equipment & installation specification.

Prepare for start up:◦purchase start up chemicals, spare parts etc.;

◦prepare preventive maintenance schedule;◦train operators, supervisors and technicians.

Page 17: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 17

Measure progress

Track waste generation, materials usage, and cost savings

Take into account variation in production level

Document your results and your cost savings

Celebrate your successes

Page 18: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 18

Monitor & evaluate results Evaluate progress!1. Compare measured benefits with

expected benefits;2. Identify ways to further improve the

benefits of the technical installations;3. Verify installation and operation

according to specifications.

Page 19: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena19

Technology Types

Appropriate Technology

Good Housekeeping

Innovation Clean Technology

Technological Complexity

Primacy of Environmental Motivation

low

low

high

high

Page 20: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena20

Good HousekeepingImprovement of operating and

maintenance practices and management

Repair and clean up Eliminate leaks, spills, etc.

Standardise and train Operating practices and skills

Invest in basic process controls Water meters, thermometers, timers, etc

◦ low or no investment, apart from staff time and management focus

innovation clean technology

appropriate technology

good housekeeping

Page 21: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena

21

Appropriate TechnologyUse the right technology

from cost, productivity, quality and environmental perspectives◦ Eg. Rotary Screen printing

in Textile printing industry◦ Medium to high cost investments with multiple benefits

innovation clean technology

appropriate technology

good housekeeping

Page 22: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena

22

Clean TechnologyUse advanced

technology primarily for an environmental outcome◦ Eg. Reverse Osmosis

for water recovery ◦ Medium to high cost

investments with primarily environmental (and/or community) benefits

innovation clean technology

appropriate technology

good housekeeping

Page 23: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena

23

InnovationDevelop and apply new

processes and products that are ‘better and greener’

Limited experience within the NCPC network

Opportunity for greater collaboration with R&TD sector

◦ High cost investments with element of risk and prospect of significant benefits including environmental and resource productivity

innovation clean technology

appropriate technology

good housekeeping

Biomimicry

Green Chemistry

Green Engineering

Factor X

Design forSustainability

Page 24: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 24

Case 1 – Old fabric and towel dyeing FactorySteam supply by old steam boiler unitDyeing with jigger and yarn dyeing

machinePlace is thoroughly disorganizedDemoralized workforceNo waste management facilities and

systemsUn insulated steam pipes, steam and

water leaks

Page 25: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 25

Case 2 – Knitted fabric dyeing facilityOld furnace oil boilerOverflow dyeing machinesHigh liquor ratio Jet machinesManual color machineWorkplace organized; 5S

implementedNo quantification of waterOld dye mixing unitPoor layout - Stores kept far away

Page 26: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 26

Case 3 – Apparel washing plantFurnace oil boilerManually operated washing machinesRenewed and expanded several timesState of the Art waste water treatment

facilitySolid Waste Management systemAll resource supplies are quantifiedWon 5S and Productivity AwardsISO 14001 EMS Certified

Page 27: Cp gp day03 session 11 - implementation of cp solutions - copy

05/01/2023 Samantha Kumarasena 27

Case 4 – Knitted fabric processing millNewly established in a IPZ; layout

optimized Fully automated dyes and

chemicals supply systemProgrammable dyeing machinesMachines in the complete range

of sizesRecognized as the best in the

country

Page 28: Cp gp day03 session 11 - implementation of cp solutions - copy

Your Questions

05/01/2023 Samantha Kumarasena 28

?

Page 29: Cp gp day03 session 11 - implementation of cp solutions - copy

Thank you!

05/01/2023 Samantha Kumarasena 29