Canary Islands 100% RES Experiences:

El Hierro, La Graciosa, …

Canary Islands Institute of Technology (ITC)

Gonzalo Piernavieja

R&D Director

Brussels, 20 March 2014

Page 2: Canary Islands and El Hierro

European Outermost Regions (ORs)

ORs are NATURAL LABORATORIES for developing, testing and

demonstrating new technologies which will be implemented in

continental regions (Europe and ROW), in insular regions worldwide, as

well as in developing countries

ORs are the IDEAL PLATFORMS to showcase and transfer adapted

technologies to regions of developing and emerging countries

worldwide (and particularly of European neighbour regions)

VISION

Page 3: Canary Islands and El Hierro

The Canary Islands: Ideal Test Bench ORs: Natural Laboratories

Every island configurates one or several real laboratories for testing and

demonstrating new technologies, especially emerging ones.

Europe needs test platforms for renewable energies, sustainable water

technologies, marine technologies, etc. ORs can host outstanding experimental

platforms in different areas and become perfect sites for R&D&D activities

worldwide

Page 4: Canary Islands and El Hierro

SUSTAINABILITY

The Canary Islands are fully committed to the development and implementation

of innovative energy, water and environmental protection technologies and

policies, providing sound proof of concepts for the whole Europe and RoW

ORs: Natural Laboratories

Page 5: Canary Islands and El Hierro

Strategic Areas (III)

SCIENCE & TECHNOLOGY FOR INTERNATIONAL COOPERATION

ORs: STRATEGIC ELEMENTS FOR R&D AND TECHNOLOGY

COOPERATION WITH DEVELOPING COUNTRIES

The Canary Islands have been carrying out succesful international cooperation

projects (especially with West Africa and South America) for many years,

developing and transferring adapted technology, for example in the energy, water,

agriculture, fishing and public health sectors

RENEWABLE ENERGIES AND WATER TECHNOLOGIES

The Canary Islands Government is deploying

technology parks specialized in adapting technologies

for the developing world.

Page 6: Canary Islands and El Hierro

The Canary Islands (Spain)

2 mill. inhabitants, 12 mill. tourists/year

Total energy dependence on external resources

Electricity generation from fossil fuels (oil); low heat demand

Isolated (insular) electrical systems

Importance of water-energy binomial (desalination)

Energy Framework

Page 7: Canary Islands and El Hierro

Energy Framework The Canary Islands

> 2.5 GW installed power, approx. 9000 GWh total el. consumption

15% of electricity consumed in water cycle

Abundant Renewable Energy Resources:

wind: ~ 4000 h.eq./y; sun: ~ 2000 kWh/m2/y

Electricity generation

55,6% Road Transport29,9%

Other (Industrial,

Residential...)12,1%

Combined water-electricity

production 2,4%

Seawater desalination plants

Structure of internal fossil

fuels market

Page 8: Canary Islands and El Hierro

INRES - 229947

Surplus of Energy Supply: Potential on RES development

RES in Canary Islands are already cheaper than conventional sources for electricity.

8

13,992 13,550

7,170

c

14,033 13,550

7,170

18,510

13,550

7,170

21,500

13,550

7,170

23,500

13,550

7,170

24,210

13,550

7,170

Fuente: IUDR – FEDEA, extraído del Análisis de los sobrecostes de la Energía

del Sistema Energético de Canarias de RICAM. Elaboración propia.

Coste de la Energía Eléctrica en Canarias (c€/kWh)

Page 9: Canary Islands and El Hierro

MAXIMIZING PENETRATION OF RENEWABLE ENERGIES (RES)

Barriers to RES penetration in the Canary Islands

Electrical System Land Planning Economic-Administrative

issues

Forecasting of wind and

solar resources

Energy storage

Grid stability studies

Strategy for maximizing RES penetration in the Canary Islands

Page 10: Canary Islands and El Hierro

Obstacles for the Sustainable Energy Development in Islands

Weak, isolated grids

Fragile ecosystems (rich biodiversity, etc.)

Lack of space for energy infrastructure placement

Difficulties for the massive deployment of Renewable Energies

….

Page 11: Canary Islands and El Hierro

Technical Solutions (I) HV/MV: Pumped Hydro (where possible)

Lower

Reservoir

Upper Reservoir

Control

Desalination Plant

Pumping Station

Wind Farm

Hydro Power Station

Page 12: Canary Islands and El Hierro

Technical Solutions (II)

HV/MV:

Subsea electrical interconnections

Pajara

Be tan curia

Tu ine je

Ant igua

L a Oliv a

Pue rto de l Rosa rio

T eg uise

T ias

Yaiza

T inajo

Arre cife

San Ba rt olomé

Haria

La G rac iosa

LANZAROTE

Matas Blancas

Gran Tarajal

Las Salinas

Corralejo

Macher

Pla ya Blanca

Punta Grande

Cable Submarino

FUERTEVENTURA

66 kV

San Bartolomé

Enlace submarino Gran Canaria y Fuerteventura :

Refuerzo del enlace submarino entre Lanzarote y Fuerteventura

Page 13: Canary Islands and El Hierro

Technical Solutions (III)

MV/LV:

Distributed Generation, esp.:

Mini- & Microgrids with high renewable energy penetration, incl.

energy storage, management of critical loads (e.g. seawater

desalination) and electrical mobility

Page 14: Canary Islands and El Hierro

ITC is a technology center specialized in:

Energy Saving/Efficiency, Renewable Energies

Water Technologies

Other emerging technological sectors

International Cooperation

(energy and water supply to peri-urban and

remote areas)

Page 15: Canary Islands and El Hierro

Activity lines The ITC

Contribution to maximization of RES penetration:

Characterization of RE resources (mapping and prediction)

Test platforms for RES systems and components (solar labs, distributed

generation lab, etc.)

Development of RES systems (with energy storage): hybrid systems,

mini- microgrids, insular 100% RES models, etc., electricity & water

supply to remote African villages

Grid stability studies

Energy storage: wind-pumped hydro, RE-HYDROGEN, etc.

Page 16: Canary Islands and El Hierro

Pozo Izquierdo Facilities (Gran Canaria)

Page 17: Canary Islands and El Hierro

Distributed Generation and Microgrids Test facilities. Overview

• PV: 27 kWp • Wind turbines: 7,5 kW • Resistive and reactive loads • Storage (300 kWh) • Electrolyzer 70 kW • Fuel Cells 6 x 5 kW • Grid simulator 125 kVA • Measurement equipment

Page 18: Canary Islands and El Hierro

Distributed Generation and Microgrids Test facilities. Equipment

PV plants: 27 kWp

Small windturbines: 34,9 kWp Main switch board (for test configuration)

Page 19: Canary Islands and El Hierro

Distributed Generation and Microgrids Test facilities. Equipment

Hydrogen system:

6 Fuel Cells (PEM). 5 kW each.

6 SMA SI inverters

1 Electrolyzer: 60 kW

H2 Storage: 500 Nm3 (25 bar)

Desalination Plant: 25 kW

Wind Turbine Vestas : 225 kVA

Load simulators:

• Load Bank 1 :150 kW (continuos by

PE)+ 100 kVAr (1 kVAr step)

• Load Bank 2: 40 kW (1 kW step) + 30

kVAr (0.75 kVAr step)

Page 20: Canary Islands and El Hierro

Power Electronics Lab for DG and Microgrids

Power Electronics laboratory overview

SuperCapacitors Storage System for Diesel

Dominated microgrids stabilitation

and high PV penetration

Page 21: Canary Islands and El Hierro

Solar Energy forecasting

SOLAR GENERATION PREDICTION

NWP (Numerical Weather Prediction): M5/WRF models with statistics post-processing

Page 22: Canary Islands and El Hierro

CANARY ISLANDS INSTITUTE OF TECHNOLOGY (ITC)

We have accumulated 15 years of experience in the development of solutions for the ENERGY and WATER supply to peri-urban/rural/remote areas

We have carried out consulting and electrification/water desalination projects using RENEWABLE ENERGIES, as well as training and awareness activities in:

• Mauritania (since 1996)

• Morocco (since 1998)

• Tunisia

• Cape Verde

• Senegal

• ECOWAS

Page 23: Canary Islands and El Hierro

ITC Experience Technology transfer examples (I)

Electrification of isolated communities with wind/solar energy

Development and installation of small autonomous desalination

plants, powered by renewable energies

Page 24: Canary Islands and El Hierro

4 seawater desalination plants, National Park Banc d’Arguin,

Mauritania

4 brackish water desalination plants, powered by solar energy,

Morocco

Brackish water desalination plant powered by solar energy,

Tunisia

ITC Experience Technology transfer examples (II)

Page 25: Canary Islands and El Hierro

Cabo Verde and ECOWAS (ECREEE)

ITC currently advices the Government of Cape Verde in its Renewable Energy Policy

ITC is technological

consultant of ECREEE

(ECOWAS)

Page 26: Canary Islands and El Hierro

The ISLE-PACT Project (I)

GOALS: Achieve an overall objective of more than 20%

CO2 emissions reduction by 2020

Demonstrate islands’ political commitment to EU

sustainable energy objectives by signing a

BINDING DECLARATION, THE PACT OF

ISLANDS

Develop Island Sustainable Energy Action Plans

(ISEAPs) as the means by which they will achieve

the overall target of the project

Develop methodologies and tools to monitor

progress of implementation of ISEAPs as well as

track progress in reducing CO2 emissions

Assess environmental and socio-economic

factors

Produce a pipeline of priority bankable projects

Propose a number of financing tools and

mechanisms that will provide the financial

resources needed by investors

Launch a strong information dissemination

campaign

Participating Regions (12):

– Azores , Madeira

– Islas Canarias, Baleares

– Creta

– Malta

– Chipre

– Cerdeña

– Gotland+ B7 Islands

– Samso

– Outer Hebrides of Scotland

Page 27: Canary Islands and El Hierro

The ISLE-PACT Project (II)

Projects for maximizing penetration of RES

RES Systems

Sustainable Transport

Energy Storage

Energy Efficiency

• Restriction in transport

infrastructures

• Reduction in losses

• Excess RES production

• Mobility (H2 – EPV)

• Grid stability

• Technologies

• Land availability

• Resources (wind-sun-etc)

Distributed Generation

• Rational use of energy

www.isle-pact.eu

Page 28: Canary Islands and El Hierro

EUROPEAN COMMISSION

Take a week to change tomorrow

Projects that will contribute to increase RES penetration in European

Islands in all the energy value chain

Generation

Energy Storage

Energy Efficiency

Manageable loads: e.g. electric

vehicles, Water desalination

Reversible pump-hydro

Batteries

Hydrogen

Wind, solar, Wave, Geothermal,

Biomass, hybrid (wind-diesel)

Final consumption

Microgrids, district heating and

cooling, etc.

IDENTIFYING POTENTIAL BANKABLE PROJECTS

Distribution

Primary sectors

Industry

Services

Residential

Page 29: Canary Islands and El Hierro

The ISLE-PACT Project (III)

Criteria for prioritizing projects ● Compatibility with current framework and existing schemes for promoting RES

● Contribution to global strategy for maximizing RES penetration in the island

● Impact on the reduction in energy demand

● Performance on standard financial parameters (PAYBACK, IRR, NPV)

● Maximization of Green House Emissions reduction to necessary investment cost

● Capacity for local employment creation of the investment project

● Innovative aspect of the project

● Maximization of energy production per unit of occupied land

A list of aprox. 25 bankable projects will be compiled for

the 12 participating European island regions

Page 30: Canary Islands and El Hierro

SMILEGOV

Enhancing effective implementation of sustainable energy action plans in European islands through reinforcement of smart multilevel governance

2nd Consortium meeting

Visby, Gotland, Sweden

24th and 25th September 2013

AAAA

www.sustainableislands.eu

Page 31: Canary Islands and El Hierro

La Graciosa 100% RES

La Graciosa:

650 inhabitants

0.7 MW peak

2 GWh/y demand

Smart Microgrid with high RES penetration, energy storage (incl.

desalination) and electric vehicles fleet

On-going

Page 32: Canary Islands and El Hierro
Page 33: Canary Islands and El Hierro

SMART METERS (already installed) + electric vehicles (planning phase)

Page 34: Canary Islands and El Hierro

Multimegawatt Wind Test Platform at Arinaga Port (Gran Canaria)

Page 35: Canary Islands and El Hierro

24/9/2013, Visby 2nd Consortium meeting

First spanish off-shore wind turbine (GAMESA)

Page 36: Canary Islands and El Hierro

El Hierro: 100% RES Island

278 km2

10.500 inhabitants

7 MW peak

40 GWh/y demand

(Diesel)

Construction finished;

Commissioning in 2014

Page 37: Canary Islands and El Hierro

100% renewable energy supply

• Design and construction of a Wind- Hydro Power Station

• Installation of solar collectors & PV systems

• Evaluation of biomass exploitation possibilities

• Transport. Sustainable Mobility • Environmental Education

Page 38: Canary Islands and El Hierro

Wind-Hydro Power Station

Page 39: Canary Islands and El Hierro

Construction finished El Hierro: 100% RES Island

Wind – Pumped Hydro Power Station

Page 40: Canary Islands and El Hierro

Wind – Pumped Hydro Power Station

Wind Farm 11,5 MW

Hydroelectric Substation 11,3 MW

Pumping Station 6 MW

Upper Reservoir 400.000 m3

Lower Reservoir 150.000 m3

Page 41: Canary Islands and El Hierro

Upper Reservoir

Page 42: Canary Islands and El Hierro
Page 43: Canary Islands and El Hierro
Page 44: Canary Islands and El Hierro
Page 45: Canary Islands and El Hierro
Page 46: Canary Islands and El Hierro
Page 47: Canary Islands and El Hierro
Page 48: Canary Islands and El Hierro
Page 49: Canary Islands and El Hierro

Conductions

Page 50: Canary Islands and El Hierro
Page 51: Canary Islands and El Hierro
Page 52: Canary Islands and El Hierro
Page 53: Canary Islands and El Hierro

Lower Reservoir

Page 54: Canary Islands and El Hierro
Page 55: Canary Islands and El Hierro
Page 56: Canary Islands and El Hierro
Page 57: Canary Islands and El Hierro
Page 58: Canary Islands and El Hierro

Hydro-Station

Page 59: Canary Islands and El Hierro
Page 60: Canary Islands and El Hierro
Page 61: Canary Islands and El Hierro
Page 62: Canary Islands and El Hierro

Pumping-Station

Page 63: Canary Islands and El Hierro
Page 64: Canary Islands and El Hierro
Page 65: Canary Islands and El Hierro
Page 66: Canary Islands and El Hierro
Page 67: Canary Islands and El Hierro
Page 68: Canary Islands and El Hierro
Page 69: Canary Islands and El Hierro

Wind Farm

Page 70: Canary Islands and El Hierro
Page 71: Canary Islands and El Hierro
Page 72: Canary Islands and El Hierro
Page 73: Canary Islands and El Hierro
Page 74: Canary Islands and El Hierro
Page 75: Canary Islands and El Hierro
Page 76: Canary Islands and El Hierro

Thank you! [email protected]