17
Dr Akinwale Aboyade Energy Specialist: University of Johannesburg Technical Director: Protergia Nigeria Limited Azuka Ogundeji Legal Director: Protergia Nigeria Limited Mollagee Mansoor Director: University of Johannesburg Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy GeneraJon

Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

Embed Size (px)

DESCRIPTION

Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

Citation preview

Page 1: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

Dr  Akinwale  Aboyade

 

Energy  Specialist:  Uni

versity  of  Johannesbu

rg  

Technical  Director:  Pro

tergia  Nigeria  Limited  

!Azuka  Ogu

ndeji  

Legal  Director:  Proter

gia  Nigeria  Limited  

!Mollagee  Mansoor  

Director:  University  o

f  Johannesburg

Assessing  Nigeria’s  Pre

paredness  for  

Large  Scale  Deployment  of  

Embedded  Renewable  E

nergy  

GeneraJon

Page 2: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

Outline

•Background  •What  is  embedded  generaJon  (EG)?  • Issues  in  EG  •Requirements  for  successful  EG  regime  •Renewable  Energy  as  EG  opJon  for  Nigeria  •RecommendaJons  going  forward

Page 3: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

Background: Conventional grid system

Source: en.wikipedia.org

Page 4: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

What is EG• EG is generation embedded

within a distribution network

• EG also called:

Distributed generation

Decentralised generation

• EG is not a new phenomenon. It preceded centralised systems

Transmission grid

Distribution grid

Utility scale generators

EG (consumers)

EG (dedicated)

Page 5: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

Why EG?• Reduced need for large-scale generators

• EGs not necessarily more expensive (scale economy, less permits required)

• EGs are quicker to deploy

• Reduced need for transmission infrastructure

• Reduced transmission losses

• Increased system reliability/resilience

• Supply and demand matching

• Reduced need for peaking plants

• Customisable and more efficient

• Increased local economic development (SME involvement)

Page 6: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

Options for EGIncludes many of same technology options for utility scale

• Conventional technologies • Primary fossils (Gas/Oil/Coal) • Diesel • Hydro

• New Alternatives • Solar • Wind • Biomass • CHP • Co-generation • Tri-generation

Source: cleanenergytransmission.org

Page 7: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

More about RE…

• RE is better suited to EG for some key reasons:

• scalability

• location flexibility

• environmentally sustainable

• RE technologies are now established and reliable

Source: www.fermeng.ie

Page 8: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

EG Status: Global

Source: www.energymanagertoday.com

Page 9: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

Components of successful EG regime

EG success

InfrastructureGenerator type

Market/pricingStandards/codes

IncentivesNet metering

Smart grids

Page 10: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

Case for EG in Nigeria• Reduced need for large-scale generators

• Reduced need for transmission infrastructure

• Reduced transmission losses

• Increased system reliability/resilience

• Supply and demand matching

• Reduced need for peaking plants

• Customisable and more efficient

• Increased local economic development (SME involvement)

Page 11: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

EG Status: Nigeria

• 20 GW from private generators of back-up power, most not grid tied

• EG not a success by any means

• It is however now receiving attention under the new power sector reforms

Page 12: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

EG regulations in Nigeria• Regulations for Embedded

Generation 2012

• Regulations for Captive generations 2012

• New regulations for procurement of generation capacity 2014 (exemptions for <10MW)

• Distribution Code v01

Page 13: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

RE Development in Nigeria

• Implementation status

• Market interest

• Regulations

• Policy support

Targets (MW)

Short Term (2005-2007)

Medium Term (2008-2015)

Long Term (2016-2025)

Hydro (large) 1930 5930 48,000Hydro (small) 100 734 19,000

Solar PV 5 120 500Solar Thermal 1 5

Biomass 100 800Wind 1 20 40

All 2,036 6,905 68,345

Page 14: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

RE Potential: Solar

Page 15: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

Main challenges

• Targeted policy support

• To RE industry

• To market structure

• Infrastructure

Page 16: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation

Way forward• Stakeholder consultation

• Resource assessment

• Grid capacity assessment

• Market studies

• Awareness raising

• Skills transfer

Page 17: Assessing Nigeria’s Preparedness for Large Scale Deployment of Embedded Renewable Energy Generation