Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

Embed Size (px)

Citation preview

Page 1: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

SUBMITTED BY: T VIJAY KUMAR AND U V KOKILA

Page 2: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

IDENTIFICATION OF PROPONENT:Lion Petroleum Corp is company registered as an oil exploration company in Kenya and dully licensed by the government of Kenya to prospect for oil and gas in Block 2B, Wajir Kenya.

Page 3: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 4: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

Location of the Project

Page 5: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

Drilling oil and gas

exploratory well

Project Description

Exploratory drilling(60-90 days)

Establishing a base camp Site preparation Setting up

well foundationDrilling and

restoration of the well site

Short duration activities

Page 6: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

Oil and Gas exploration to production life cycle

Page 7: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

Scoping

Using Checklist

Identification of potential negative impacts of the environment

Air quality and noiseSoil erosionRoad traffic and safetyChanged land useLoss of vegetationLoss of biodiversityPublic healthCommunity issues

Page 8: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

SCOPE OF EIA STUDY

Under the scope of EIA it is envisaged:

•To assess existing status of air, noise, water, land, biological and socioeconomic components of environment•To identify and quantify significant impacts of the campsite and the proposed drilling operations on various environmental components•To evaluate proposed pollution prevention and control measures•To prepare a pragmatic environmental and social management plan (ESMP) outlining control technologies and or practices to be adopted for avoiding and mitigating adverse impacts•To delineate post-project environmental quality monitoring programme to be implemented

Page 9: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

METHODOLOGY FOR EIA

Keeping in view the nature of activities envisaged and environmental impacts assessment guidelines and regulations of 2003, the area around proposed exploration well site was studied for the purpose of environmental impact assessment studies. The work to be carried out for each of the environmental components is briefly reported below and described in details for the purpose ofshowing the extent the study report will cover.

Air Environment•Collection of surface meteorological data like wind speed, wind direction, relative humidity, rainfall, ambient temperature etc.•Collection of ambient air quality data

Noise EnvironmentEstablishing existing status of noise levels in residential, commercial, industrial areas and silence zones within the block area.

Land EnvironmentCollection and assessment of representative soil samples within the study AreaAssessment of productivity and fertility of soil found within the study area.

Page 10: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

Water EnvironmentCollection of surface and ground water resources for determining quality of water in the study Area

Biological Environment•Collection of data on flora and fauna including rare and endangered species within the block area•Collection of information on wildlife sanctuaries / reserve forest if any in the vicinity of the project area•Assessment of species diversity, density, abundance etc., in the study region.

Socio-economic EnvironmentCollection of baseline data including demographic details, such as households, population, literacy, employment pattern, general health, tribal, transport, communication & welfare facilities such as hospitals, educational institutions, project awareness amongst the public, infrastructure facilities, economic resources, cultural and aesthetic attributes etc. as per the requirements under.

Page 11: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

Mitigation MeasuresIt is recommended that all equipment are operated within specified design parameters during the preparation, construction, drilling and decommissioning phases both for the camp and the drilling activities.

Environmental and Social Management PlanEnvironmental and Social Management Plan (ESMP) will be drawn after identifying, predicting and evaluating the significant impacts on each component of the environment with a view to maximizing the benefits from proposed project.

Anticipated Environmental Impacts•Identification of Environmental Impacts associated with exploratory drilling•Prediction of adverse impacts due to activities related to proposed exploratory drilling.

Page 12: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

Baseline social and economic conditions

Project sites Administrative UnitsBaseline Social ConditionsSettlement PatternsPopulation Distribution in the project areaLand- useReligion and CultureGender and Children AffairsYouth EmploymentLevels of PovertyHousingHealth

Baseline Economic ConditionsTrade, Tourism IndustryPhysical Infrastructure

Page 13: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

Consultation Method

The method of consultation used included:

•Public meetings where representatives of the local community aired their views for and against the proposed project. •Focused groups discussions with the chiefs and sub- chiefs from the area•One to one interviews•Information gathering through questionnaires.•The report of the analyzed questionnaire is included in session.

Page 14: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

Legend of negative impact categorization

Page 15: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

Impact Valuation Matrix

Comment:With an impact valuation of 2.17 the overall impacts of the project are withinacceptable ranges

Page 16: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

Linkages and Concerns

Page 17: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 18: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

. POTENTIAL IMPACTS AND PROPOSED ENVIRONMENTAL MITIGATION MEASURESTable showing Anticipated impacts at different phases of the development

Page 19: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

A) Levels of potential negative impactsTable showing Analysis of environmental issues and their potential impacts

Page 20: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

Table showing Impacts on Geological Resources

Page 21: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 22: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

Table showing Impact on Water Resource

Page 23: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

Table showing Impacts on humans and socio-economics

Page 24: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

POLICY, LEGAL AND ADMINISTRATIVE/INSTITUTIONAL FRAMEWORK

•The Environmental Management and Coordination Act, 1999•Environmental Management and Coordination Act•Environmental Impact Assessment Regulations•Environmental Management and Coordination Act (Environmental•Management Regulations)•Waste Management Regulations, 2006 (Legal Notice No. 121)•Water Resources Management Rules (2007)•The Public Health Act (Cap. 242)•Land Acquisition Act (Cap. 295)•Public Roads and Roads of Access Act (Cap. 399)•The Wildlife Conservation and Management Act (Cap 376)•Factories Act•The Mining Act (Cap. 306)•Transport Licensing Act•Physical Planning Act (Cap286)•The Land Planning Act (Cap. 303)•Agricultural Act (Cap 218)

The Legal Statute

Page 25: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

•National Environmental Action Plan (NEAP)•Environment and Development (Sessional Paper No. 6 of 1999)•The Wildlife Policy (Sessional Paper No. 3 of 1975)•The National Biodiversity Strategy•The National Poverty Eradication Plan (NPEP) and the Poverty Reduction Strategies Paper(PRSP)•Vision 2030•Relevant International Agreements•Convention of Biological Diversity (CBD)

Selected Policies

Page 26: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

The Environment and Social Management Plan (ESMP): Design and Construction Phase

Page 27: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 28: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 29: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

ESMP: Operation Phase

Page 30: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 31: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 32: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 33: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 34: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 35: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 36: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 37: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 38: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 39: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 40: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

ESMP: Decommissioning Phase

Page 41: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 42: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya
Page 43: Analysis: EIA report on Oil Exploratory block in Block 2B Wajir, Kenya

THANK YOU!!!!