3
Product Work Log Name_____________________________________________________ Date ________________ Product ________________________________________________________________________ Date/Time: March 13, 2012/4:00- 4:30 March 15, 2012/ 3:00- 4:00 March 16,2012- March 22, 2012/ 4:30- 5:00 Activity: Contacted the American Red Cross Commentary: I spoke to someone with the Red Cross about hosting a blood drive. I had to give them all of my information so it could be sent to the representative for my area. Activity: Communicated with Sandy Buffington about booking a blood drive. Commentary: Sandy and I had to discuss possible dates, times, and locations and make decisions in order to get the blood drive booked. Activity: Throughout these days I was communicating with donors and setting up appointments. Commentary: I spent about 30 minutes each day contacting people, communicating available time slots, and scheduling the donors. Comment/Suggestions:

Rebecca McGehee product work log

Embed Size (px)

Citation preview

Page 1: Rebecca McGehee product work log

Product Work Log

Name_____________________________________________________ Date ________________

Product ________________________________________________________________________

Date/Time:

March 13, 2012/4:00-

4:30

March 15, 2012/ 3:00-

4:00

March 16,2012-

March 22, 2012/ 4:30-

5:00

Activity:

Contacted the American Red Cross

Commentary:

I spoke to someone with the Red Cross

about hosting a blood drive. I had to

give them all of my information so it

could be sent to the representative for

my area.

Activity:

Communicated with Sandy Buffington

about booking a blood drive.

Commentary:

Sandy and I had to discuss possible

dates, times, and locations and make

decisions in order to get the blood

drive booked.

Activity:

Throughout these days I was

communicating with donors and

setting up appointments.

Commentary:

I spent about 30 minutes each day

contacting people, communicating

available time slots, and scheduling the

donors.

Comment/Suggestions:

Page 2: Rebecca McGehee product work log

March 25, 2012/ 1:30-

2:00

March 27, 2012/ 7:00-

7:30

March 31,2012/ 8:30-

5:30

Activity:

Site inspection

Commentary:

My dad, Sandy, and I met at the church

so Sandy could confirm that the church

had enough room to host the drive

there.

Activity:

Chick-fil-A donation request

Commentary:

I went to Chick-fil-A to ask for coupons

to hand out to the donors on the day of

the drive. I had to fill out a request

form and contact the lady in charge. I

ended up getting coupons for a free

milkshake.

Activity:

Blood drive

Commentary:

The blood drive was scheduled for

10:00am-3:00pm. Before the drive we

had to move stuff around the church

and set up the Red Cross equipment.

The blood drive ended running past

3:00. Afterwards, we had to take down

the equipment, load it up, move the

church’s stuff back, and clean up.

Page 3: Rebecca McGehee product work log

April 2, 2012/ 2:00-

3:00

April 4, 2012/ 1:30-

2:30

Activity:

Putting scrapbook together, working

on final presentation

Commentary:

I began getting all of my pictures

together and starting on the scrapbook.

I also started working on my slideshow

presentation.

Activity:

Putting scrapbook together, final

presentation

Commentary:

I completed my scrapbook and added

final touches to my presentation.