Złota 44, Warsaw
PROJECT REFERENCESWSP IN POLAND
TABLE OF CONTENTSWE ARE WSP IN POLAND .................................... 03
OUR TEAM ........................................................................ 04
CLIENT LIST ......................................................................... 05
PROJECT EXPERIENCE ............................................. 06
Environment ........................................................... 08
Structural engineering ...................................... 14
Mechanical and Electrical engineering .............................................................. 16
Sustainability and energy ............................... 22
SOLUTION-DRIVEN DESIGN ............................ 26
CONTACT DETAILS ..................................................... 27
Apartments “NA POWIŚLU”, Warsaw
WE AREWSP IN POLANDWe deliver integrated solutions for building, industrial, environmental and sustainability projects.
In Poland, 80 engineers and consultants provide integrated design and consulting services in three key market segments:
Buildings (Structural engineering, Mechanical engineering, Electrical engineering), Environment, Sustainability.
05WSP in Poland Reference List
CLIENT LIST
• Apsys Polska S.A.• Atrium Poland Real Estate
Management Sp. z o.o.• Azora Europa• BUMA Investor Sp. z o.o.• Capital Park S.A.• Echo Investment S.A.• Gleeds Polska Sp. z o.o.• Globe Trade Centre S.A.• Hines Polska Sp. z o.o.• Hochtief Polska S.A.• Inter IKEA Centre Polska S.A.• Jones Lang LaSalle• Klépierre Management Polska Sp. z o.o.• Liebrecht & wooD Poland Sp. z o.o.• Linc Energy (Poland) Sp. z o.o.• OKRE Development Sp. z o.o.• ORCO Property Group S.A.• Panattoni Europe Sp. z o.o.• Penta Investments Sp. z o.o.• Powiśle Park Sp. z o.o.• Turret Development Sp. z o.o.• UNIBEP S.A.• WARBUD S.A.• Waryński S.A.• Yareal Polska Sp. z o.o.
The following is a list of some of our Clients:
• AHR Architects Sp. z o.o.
• APA Wojciechowski Sp. z o.o.
• Biuro Projektów Kazimierski i Ryba Sp. j.
• DDJM Biuro Architektoniczne Sp. z o.o.
• Estudio Lamela Polska Sp. z o.o.
• Gowin/Siuta architektura.urbanistyka
• Grupa 5 Architekci Sp. z o.o.
• HRA Architekci Sp. z o.o.
• JEMS Architekci Sp. z o.o.
• Kuryłowicz & Associates Sp. z o.o.
• Marek Budzyński-Architekt Sp. z o.o.
• MWH-architekci A. Wyszyński
• PRC Architekci Sp. z o.o.
• Projekt PBPA Sp. z o.o.
• Studio Quadra Sp. z o.o.
• SUD Architekt Polska Sp. z o.o.
OUR TEAM
WSP in Poland Reference List 04
Asbestos audit of a building, Warsaw ............... 11
Asbestos audit, eastern Poland ............................. 12
Brownfield site, Ożarów Mazowiecki ................ 10
Commercial center site, Wrocław ....................... 09
Existing CHP site, Silesia .......................................... 09
Former warehouse site with rail sidings, eastern Poland ............................................................... 09
Rubber insulation production facility, central Poland ................................................................. 12
Site in Bielany Wrocławskie, Kobierzyce municipality ..................................................................... 11
Site in Malbork ................................................................ 13
Site in Ruda Śląska, Silesia ......................................... 13
Site in Sady, Tarnowo Podgórne municipality ... 10
Site in Warsaw ................................................................. 11
Site in Warsaw ................................................................. 12
Two locations for AMAZON warehouses, Poland ..................................................................................... 10
Warehouse in Chmielów ........................................... 13
55-61 Knightsbridge and 1-7 William Street, London ............................................................................... 15
Principal Place, London ............................................. 15
South Bank Shell Centre, London ....................... 15
PROJECT EXPERIENCE
ENVIRONMENT
STRUCTURALENGINEERING
MECHANICALAND ELECTRICAL ENGINEERING
Apartments „NA POWIŚLU”, Warsaw ............ 20
Art Norblin, Warsaw .................................................... 17
Fine Arts Academy, Warsaw .................................. 20
GreenWings Offices, Warsaw ............................... 19
IKEA stores in Wrocław and Lublin .................... 18
National Forum of Music, Wrocław .................... 17
Neptun Office Centre, Gdańsk ............................ 19
Oxygen Park, Warsaw ................................................ 20
Platinum Towers, Warsaw ......................................... 21
Podlasie Opera and Philharmonic, Białystok .. 21
Renaissance Hotel, Warsaw ..................................... 19
Sterlinga Business Center, Łódź ............................ 21
University Campus in Białystok ............................. 18
Warsaw University, Physics and Biochemistry Faculties’ Buildings ........................................................ 18
Złota 44, Warsaw .......................................................... 17
SUSTAINABILITY
Business Garden Warsaw, Wrocław and Poznań .... 24
Centrum Handlowe Ogrody, Elbląg .................. 25
FASHION HOUSE Outlet Centre Moscowand St Petersburg ......................................................... 24
Park Rozwoju, Stage I and II, Warsaw ................. 23
Plac Unii, Warsaw ......................................................... 25
PointPark Poznań Building 5 and 6, logistics hall Robakowo-Gądki ....................................................... 25
Quattro Business Park, Cracow ............................. 23
Sadyba Best Mall Warsaw, Lublin Plaza, PoznańPlaza ....................................................................................... 24
Sterlinga Business Center, Łódź ............................ 23
09WSP in Poland Reference List
ENVIRONMENTSELECTED PROJECTS
Former warehouse site with rail sidings, eastern PolandServices: Phase I Environmental Due Diligence Assessment, Phase II Geo-Environmental Intrusive Assessment, Detailed description of remediation works
Project stage: Completed in 2014
Commercial center site, WrocławServices: Phase I Environmental Due Diligence Assessment
Project stage: Completed in 2014
Existing CHP site in SilesiaServices: Phase I Environmental Due Diligence Assessment
Project stage: Completed in 2014
11WSP in Poland Reference List WSP in Poland Reference List 10
Two locations for AMAZON warehouses, PolandServices: Environmental due diligences (before and post construction)
Project stage: Completed in 2014
Site in Sady, Tarnowo Podgórne municipalityServices: Remediation and report on preventive measures undertaken
Project stage: Completed in 2014
Brownfield site, Ożarów MazowieckiServices: Phase I Environmental Assessment, Phase II and IIl Intrusive Assessment with detailed description of remediation works, remediation project and remediation
Project stage: Completed in 2014
Site in Bielany Wrocławskie, Kobierzyce municipalityServices: Phase II Geo-Environmental Intrusive Assessment
Project stage: Completed in 2013
Site in WarsawServices: Remediation project, Application for reconciliation of remedial measures’ conditions, remediation works and report on remedial measures undertaken
Project stage: Completed in 2013
Asbestos audit of a building, WarsawServices: Asbestos report and report on safe building use
Project stage: Completed in 2014
13WSP in Poland Reference List WSP in Poland Reference List 12
Asbestos audit, eastern PolandServices: Part 1 - inventory of materials containing asbestos, Part 2 - safe usage and decomissioning of materials containing asbestos
Project stage: Completed in 2013
Site in WarsawServices: Remediation project
Project stage: Completed in 2013
Rubber insulation production facility, central PolandServices: Phase I Environmental Due Diligence Assessment, Phase II Geo-Environmental Intrusive Assessment
Project stage: Completed in 2013
Warehouse in ChmielówServices: Geo-engineering documentation containing description of the state of ground-water environment of the site, remediation project and remediation supervision
Project stage: Completed in 2011
Site in Ruda Śląska, SilesiaServices: Phase I Environmental Due Diligence Assessment, Phase II Geo-Environmental Intrusive Assessment, supervision of Phase III Geo-Environmental Intrusive Assessment, geotechnical works’ supervision
Project stage: Completed in 2011
Site in MalborkServices: Remediation project, Application for reconciliation of remediation conditions, remediation works and report on remedial measures undertaken
Project stage: Completed in 2012
15WSP in Poland Reference List
55-91 Knightsbridge and 1-7 William Street, London
STRUCTURAL ENGINEERINGSELECTED PROJECTS
55-91 Knightsbridge and 1-7 William Street, LondonClient: Cheval Property Management LtdArchitect: Dixon Jones Ltd
Area: 14,000 sqm
Services: Structural engineering, façade engineering
Project stage: Design phase
South Bank Shell Centre, LondonInvestor: Braeburn Estates Limited PartnershipArchitect: Adamson Associates
Area: 80,000 sqm
Services: Structural engineering
Project stage: Design phase
Principal Place, LondonInvestor: Principal Place Residential LimitedArchitect: Foster + Partners
Area: 36,000 sqm (Building 2)
Services: Structural engineering
Project stage: Design phase
17WSP in Poland Reference List
Mechanical engineering model provided by WSP Polska in office building designed by JEMS Architekci
MECHANICAL AND ELECTRICAL ENGINEERINGSELECTED PROJECTS
National Forum of Music, WrocławInvestor: Inwestycje Wrocławskie Sp. z o.o.Architect: Kuryłowicz & Associates Sp. z o.o.
Area: 48,500 sqm
Services: Mechanical engineering
Project stage: Under construction
Złota 44, WarsawInvestor: ORCO Property Group S.A.Architect: Studio Daniel Libeskind
Area: 71,500 sqm
Services: Mechanical and electrical engineering
Project stage: Under construction
Art Norblin, WarsawInvestor: Art Norblin Sp. z o.o. (Grupa Capital Park)Architect: PRC Architekci Sp. z o.o.
Area: 64,000 sqm
Services: Mechanical and electrical engineering
Project stage: Under construction
19WSP in Poland Reference List 18 WSP in Poland Reference List
University Campus in BiałystokInvestor: Białystok UniversityArchitect: Marek Budzyński-Architekt Sp. z o.o.
Area: 28,000 sqm
Services: Infrastructure design, Mechanical engineering
Project stage: Under construction
Warsaw University, Physics and Biochemistry Faculties’ BuildingsArchitect: Kuryłowicz & Associates Sp. z o.o.
Area: 40,000 sqm
Services: Sanitary, low voltage services and infrastructure design
Project stage: Phase I completed, Phase II under construction
IKEA Stores in Wrocław and LublinInvestor: IKEA Property Poland Sp. z o.o.Architect: ARCHMO Sp. z o.o.
Area: Wrocław: 42,000 sqm, Lublin: 39,600 sqm
Services: Mechanical and electrical engineering
Project stage: Store in Wrocław completed, Store in Lublin under construction
Neptun Office Centre, GdańskInvestor: Hines Polska Sp. z o.o.Architect: AHR Architects Sp. z o.o.
Area: 16,000 sqm
Services: Mechanical and electrical engineering
Project stage: Completed in 2014
GreenWings Offices, WarsawInvestor: OKRE Development Sp. z o.o.Architect: JEMS Architekci Sp. z o.o.
Area: 10,850 sqm
Services: Mechanical and electrical engineering
Project stage: Completed in 2014
Renaissance Hotel, WarsawInvestor: P.P. „Porty Lotnicze”Architect: JEMS Architekci Sp. z o.o.
Area: 16,500 sqm
Services: Infrastructure design, Mechanical engineering and BMS
Project stage: Under construction
WSP in Poland Reference List 21WSP in Poland Reference List 20
Oxygen Park, WarsawInvestor: Yareal Polska Sp. z o.o.Architect: JEMS Architekci Sp. z o.o.
Area: 18,300 sqm
Services: Mechanical and electrical engineering
Project stage: Completed in 2013
Fine Arts Academy, WarsawArchitect: JEMS Architekci Sp. z o.o.
Area: 16,000 sqm
Services: Mechanical engineering
Project stage: Completed in 2014
Apartments „NA POWIŚLU”, Warsaw Investor: Powiśle Park Sp. z o.o.Architect: Kuryłowicz & Associates Sp. z o.o.
Area: 33,000 sqm
Services: Infrastructure design, Mechanical and electrical engineering
Project stage: Completed in 2014
Platinum Towers, WarsawInvestor: Atlas Management CompanyArchitect: Piotr Majewski MWH Architekci
Area: 45,000 sqm
Services: Mechanical and electrical engineering
Project stage: Completed in 2009
Sterlinga Business Center, ŁódźInvestor: Hines Polska Sp. z o.o.Architect: AHR Architects Sp. z o.o.
Area: 13,400 sqm
Services: Mechanical and electrical engineering
Project stage: Completed in 2010
Podlasie Opera and Philharmonic – European Art Centre, BiałystokInvestor: Podlaskie Voivodeship Marshall’s OfficeArchitect: Marek Budzyński-Architekt Sp. z o.o.
Area: 16,000 sqm
Services: Mechanical and electrical engineering
Project stage: Completed in 2012
23WSP in Poland Reference List
SUSTAINABILITY AND ENERGYSELECTED PROJECTS
Park Rozwoju, Phase I and II, WarsawClient: Echo Investment S.A.
Area: 32,000 sqm
Services: Certification BREEAM International 2009 Office (Interim certificate; Stage I with Very good rating, Stage II with Excellent rating)
Timeframe: Stage I 2010 – 2012, Stage II 2012 – 2014
Quattro Business Park, CracowClient: BUMA Investor Sp. z o.o.
Area: 12,200 sqm (Building C)
Services: Certification BREEAM International 2009 Office (Interim & Final certificate with Very good rating)
Timeframe: 2011 – 2014
Sterlinga Business Center, ŁódźClient: Hines Polska Sp. z o.o.
Area: 13,400 sqm
Services: Certification BREEAM In-Use (with Excellent rating in categories Asset and Building Management)
Timeframe: 2014
WSP in Poland Reference List 25WSP in Poland Reference List 24
FASHION HOUSE Outlet Centre Moscow and St PetersburgClient: FASHION HOUSE Group
Area: Moscow: 28,000 sqm, St Petersburg: 20,000 sqm
Services: Certification BREEAM International 2009 Retail, Additional studies
Timeframe: Building in Moscow 2010-2013, Building in St Petersburg – currently assessed
Sadyba Best Mall Warsaw, Lublin Plaza, Poznań PlazaClient: Klépierre Management Polska Sp. z o.o.
Area: Warsaw – 50,000 sqm, Lublin - 68,000 sqm, Poznań – 64,000 sqm
Services: Certification BREEAM In-Use
Timeframe: Since 2014
DOR Plaza, WarsawClient: DOR Group
Area: 14,000 sqm
Services: Certification BREEAM International 2009 Office (Interim certificate with Very good rating)
Timeframe: Completed in 2013
PointPark Poznań Buildings 5 and 6, logistics hall in Robakowo-GądkiClient: PointPark Properties Sp. z o.o.
Area: Building 5: 21,875 sqm, Building 6: 21,875 sqm
Services: Certification BREEAM International 2009 Industrial (Interim certificate with Very good rating)
Timeframe: 2011 - 2012
Centrum Handlowe Ogrody, ElblągClient: Centrum Ogrody Sp. z o.o.
Area: 40,000 sqm
Services: Certification BREEAM International 2009 Retail (Interim certificate with Very good rating)
Timeframe: 2011-2013
Plac Unii, WarsawClient: Liebrecht & wooD Poland Sp. z o.o. and BBI Development S.A.
Area: 41,000 sqm
Services: Certification BREEAM International 2008 Office and Retail (Final design certificate with Very good rating)
Timeframe: 2009 – 2012
CONTACT DETAILS
Hugues MilletManaging [email protected]
Marek Dą[email protected]
Artur JackowskiChief [email protected]
Sylwester HofmanChief [email protected]
Łukasz WarzecChief [email protected]
Ewa Kowalska-OcneanuChief [email protected]
SOLUTION-DRIVEN DESIGNWe take a leading and proactive role in the delivery of integrated multi-disciplinary engineering solutions. In the delivery of technical solutions, we work closely with the Client and all members of the project team to ensure that the solutions are realistic and consider all projects’ constraints and limitations. Therefore our priority is to understand our Client’s brief. Based on that insight, we are able to solve technical issues and propose alternative, optimised and suitable solutions. As consultants, we believe communication is the key to successful project delivery. Therefore our project leaders, apart from being technical experts, are Client’s main contact point and coordinate all aspects related to our scope within the design team. All in-house engineering expertise enables us to deliver solutions, which contribute to the creation of world class, efficient and optimised buildings.