15
Złota 44, Warsaw PROJECT REFERENCES WSP IN POLAND

WSP - Poland

Embed Size (px)

Citation preview

Page 1: WSP - Poland

Złota 44, Warsaw

PROJECT REFERENCESWSP IN POLAND

Page 2: WSP - Poland

TABLE OF CONTENTSWE ARE WSP IN POLAND .................................... 03

OUR TEAM ........................................................................ 04

CLIENT LIST ......................................................................... 05

PROJECT EXPERIENCE ............................................. 06

Environment ........................................................... 08

Structural engineering ...................................... 14

Mechanical and Electrical engineering .............................................................. 16

Sustainability and energy ............................... 22

SOLUTION-DRIVEN DESIGN ............................ 26

CONTACT DETAILS ..................................................... 27

Apartments “NA POWIŚLU”, Warsaw

WE AREWSP IN POLANDWe deliver integrated solutions for building, industrial, environmental and sustainability projects.

In Poland, 80 engineers and consultants provide integrated design and consulting services in three key market segments:

Buildings (Structural engineering, Mechanical engineering, Electrical engineering), Environment, Sustainability.

Page 3: WSP - Poland

05WSP in Poland Reference List

CLIENT LIST

• Apsys Polska S.A.• Atrium Poland Real Estate

Management Sp. z o.o.• Azora Europa• BUMA Investor Sp. z o.o.• Capital Park S.A.• Echo Investment S.A.• Gleeds Polska Sp. z o.o.• Globe Trade Centre S.A.• Hines Polska Sp. z o.o.• Hochtief Polska S.A.• Inter IKEA Centre Polska S.A.• Jones Lang LaSalle• Klépierre Management Polska Sp. z o.o.• Liebrecht & wooD Poland Sp. z o.o.• Linc Energy (Poland) Sp. z o.o.• OKRE Development Sp. z o.o.• ORCO Property Group S.A.• Panattoni Europe Sp. z o.o.• Penta Investments Sp. z o.o.• Powiśle Park Sp. z o.o.• Turret Development Sp. z o.o.• UNIBEP S.A.• WARBUD S.A.• Waryński S.A.• Yareal Polska Sp. z o.o.

The following is a list of some of our Clients:

• AHR Architects Sp. z o.o.

• APA Wojciechowski Sp. z o.o.

• Biuro Projektów Kazimierski i Ryba Sp. j.

• DDJM Biuro Architektoniczne Sp. z o.o.

• Estudio Lamela Polska Sp. z o.o.

• Gowin/Siuta architektura.urbanistyka

• Grupa 5 Architekci Sp. z o.o.

• HRA Architekci Sp. z o.o.

• JEMS Architekci Sp. z o.o.

• Kuryłowicz & Associates Sp. z o.o.

• Marek Budzyński-Architekt Sp. z o.o.

• MWH-architekci A. Wyszyński

• PRC Architekci Sp. z o.o.

• Projekt PBPA Sp. z o.o.

• Studio Quadra Sp. z o.o.

• SUD Architekt Polska Sp. z o.o.

OUR TEAM

WSP in Poland Reference List 04

Page 4: WSP - Poland

Asbestos audit of a building, Warsaw ............... 11

Asbestos audit, eastern Poland ............................. 12

Brownfield site, Ożarów Mazowiecki ................ 10

Commercial center site, Wrocław ....................... 09

Existing CHP site, Silesia .......................................... 09

Former warehouse site with rail sidings, eastern Poland ............................................................... 09

Rubber insulation production facility, central Poland ................................................................. 12

Site in Bielany Wrocławskie, Kobierzyce municipality ..................................................................... 11

Site in Malbork ................................................................ 13

Site in Ruda Śląska, Silesia ......................................... 13

Site in Sady, Tarnowo Podgórne municipality ... 10

Site in Warsaw ................................................................. 11

Site in Warsaw ................................................................. 12

Two locations for AMAZON warehouses, Poland ..................................................................................... 10

Warehouse in Chmielów ........................................... 13

55-61 Knightsbridge and 1-7 William Street, London ............................................................................... 15

Principal Place, London ............................................. 15

South Bank Shell Centre, London ....................... 15

PROJECT EXPERIENCE

ENVIRONMENT

STRUCTURALENGINEERING

MECHANICALAND ELECTRICAL ENGINEERING

Apartments „NA POWIŚLU”, Warsaw ............ 20

Art Norblin, Warsaw .................................................... 17

Fine Arts Academy, Warsaw .................................. 20

GreenWings Offices, Warsaw ............................... 19

IKEA stores in Wrocław and Lublin .................... 18

National Forum of Music, Wrocław .................... 17

Neptun Office Centre, Gdańsk ............................ 19

Oxygen Park, Warsaw ................................................ 20

Platinum Towers, Warsaw ......................................... 21

Podlasie Opera and Philharmonic, Białystok .. 21

Renaissance Hotel, Warsaw ..................................... 19

Sterlinga Business Center, Łódź ............................ 21

University Campus in Białystok ............................. 18

Warsaw University, Physics and Biochemistry Faculties’ Buildings ........................................................ 18

Złota 44, Warsaw .......................................................... 17

SUSTAINABILITY

Business Garden Warsaw, Wrocław and Poznań .... 24

Centrum Handlowe Ogrody, Elbląg .................. 25

FASHION HOUSE Outlet Centre Moscowand St Petersburg ......................................................... 24

Park Rozwoju, Stage I and II, Warsaw ................. 23

Plac Unii, Warsaw ......................................................... 25

PointPark Poznań Building 5 and 6, logistics hall Robakowo-Gądki ....................................................... 25

Quattro Business Park, Cracow ............................. 23

Sadyba Best Mall Warsaw, Lublin Plaza, PoznańPlaza ....................................................................................... 24

Sterlinga Business Center, Łódź ............................ 23

Page 5: WSP - Poland

09WSP in Poland Reference List

ENVIRONMENTSELECTED PROJECTS

Former warehouse site with rail sidings, eastern PolandServices: Phase I Environmental Due Diligence Assessment, Phase II Geo-Environmental Intrusive Assessment, Detailed description of remediation works

Project stage: Completed in 2014

Commercial center site, WrocławServices: Phase I Environmental Due Diligence Assessment

Project stage: Completed in 2014

Existing CHP site in SilesiaServices: Phase I Environmental Due Diligence Assessment

Project stage: Completed in 2014

Page 6: WSP - Poland

11WSP in Poland Reference List WSP in Poland Reference List 10

Two locations for AMAZON warehouses, PolandServices: Environmental due diligences (before and post construction)

Project stage: Completed in 2014

Site in Sady, Tarnowo Podgórne municipalityServices: Remediation and report on preventive measures undertaken

Project stage: Completed in 2014

Brownfield site, Ożarów MazowieckiServices: Phase I Environmental Assessment, Phase II and IIl Intrusive Assessment with detailed description of remediation works, remediation project and remediation

Project stage: Completed in 2014

Site in Bielany Wrocławskie, Kobierzyce municipalityServices: Phase II Geo-Environmental Intrusive Assessment

Project stage: Completed in 2013

Site in WarsawServices: Remediation project, Application for reconciliation of remedial measures’ conditions, remediation works and report on remedial measures undertaken

Project stage: Completed in 2013

Asbestos audit of a building, WarsawServices: Asbestos report and report on safe building use

Project stage: Completed in 2014

Page 7: WSP - Poland

13WSP in Poland Reference List WSP in Poland Reference List 12

Asbestos audit, eastern PolandServices: Part 1 - inventory of materials containing asbestos, Part 2 - safe usage and decomissioning of materials containing asbestos

Project stage: Completed in 2013

Site in WarsawServices: Remediation project

Project stage: Completed in 2013

Rubber insulation production facility, central PolandServices: Phase I Environmental Due Diligence Assessment, Phase II Geo-Environmental Intrusive Assessment

Project stage: Completed in 2013

Warehouse in ChmielówServices: Geo-engineering documentation containing description of the state of ground-water environment of the site, remediation project and remediation supervision

Project stage: Completed in 2011

Site in Ruda Śląska, SilesiaServices: Phase I Environmental Due Diligence Assessment, Phase II Geo-Environmental Intrusive Assessment, supervision of Phase III Geo-Environmental Intrusive Assessment, geotechnical works’ supervision

Project stage: Completed in 2011

Site in MalborkServices: Remediation project, Application for reconciliation of remediation conditions, remediation works and report on remedial measures undertaken

Project stage: Completed in 2012

Page 8: WSP - Poland

15WSP in Poland Reference List

55-91 Knightsbridge and 1-7 William Street, London

STRUCTURAL ENGINEERINGSELECTED PROJECTS

55-91 Knightsbridge and 1-7 William Street, LondonClient: Cheval Property Management LtdArchitect: Dixon Jones Ltd

Area: 14,000 sqm

Services: Structural engineering, façade engineering

Project stage: Design phase

South Bank Shell Centre, LondonInvestor: Braeburn Estates Limited PartnershipArchitect: Adamson Associates

Area: 80,000 sqm

Services: Structural engineering

Project stage: Design phase

Principal Place, LondonInvestor: Principal Place Residential LimitedArchitect: Foster + Partners

Area: 36,000 sqm (Building 2)

Services: Structural engineering

Project stage: Design phase

Page 9: WSP - Poland

17WSP in Poland Reference List

Mechanical engineering model provided by WSP Polska in office building designed by JEMS Architekci

MECHANICAL AND ELECTRICAL ENGINEERINGSELECTED PROJECTS

National Forum of Music, WrocławInvestor: Inwestycje Wrocławskie Sp. z o.o.Architect: Kuryłowicz & Associates Sp. z o.o.

Area: 48,500 sqm

Services: Mechanical engineering

Project stage: Under construction

Złota 44, WarsawInvestor: ORCO Property Group S.A.Architect: Studio Daniel Libeskind

Area: 71,500 sqm

Services: Mechanical and electrical engineering

Project stage: Under construction

Art Norblin, WarsawInvestor: Art Norblin Sp. z o.o. (Grupa Capital Park)Architect: PRC Architekci Sp. z o.o.

Area: 64,000 sqm

Services: Mechanical and electrical engineering

Project stage: Under construction

Page 10: WSP - Poland

19WSP in Poland Reference List 18 WSP in Poland Reference List

University Campus in BiałystokInvestor: Białystok UniversityArchitect: Marek Budzyński-Architekt Sp. z o.o.

Area: 28,000 sqm

Services: Infrastructure design, Mechanical engineering

Project stage: Under construction

Warsaw University, Physics and Biochemistry Faculties’ BuildingsArchitect: Kuryłowicz & Associates Sp. z o.o.

Area: 40,000 sqm

Services: Sanitary, low voltage services and infrastructure design

Project stage: Phase I completed, Phase II under construction

IKEA Stores in Wrocław and LublinInvestor: IKEA Property Poland Sp. z o.o.Architect: ARCHMO Sp. z o.o.

Area: Wrocław: 42,000 sqm, Lublin: 39,600 sqm

Services: Mechanical and electrical engineering

Project stage: Store in Wrocław completed, Store in Lublin under construction

Neptun Office Centre, GdańskInvestor: Hines Polska Sp. z o.o.Architect: AHR Architects Sp. z o.o.

Area: 16,000 sqm

Services: Mechanical and electrical engineering

Project stage: Completed in 2014

GreenWings Offices, WarsawInvestor: OKRE Development Sp. z o.o.Architect: JEMS Architekci Sp. z o.o.

Area: 10,850 sqm

Services: Mechanical and electrical engineering

Project stage: Completed in 2014

Renaissance Hotel, WarsawInvestor: P.P. „Porty Lotnicze”Architect: JEMS Architekci Sp. z o.o.

Area: 16,500 sqm

Services: Infrastructure design, Mechanical engineering and BMS

Project stage: Under construction

Page 11: WSP - Poland

WSP in Poland Reference List 21WSP in Poland Reference List 20

Oxygen Park, WarsawInvestor: Yareal Polska Sp. z o.o.Architect: JEMS Architekci Sp. z o.o.

Area: 18,300 sqm

Services: Mechanical and electrical engineering

Project stage: Completed in 2013

Fine Arts Academy, WarsawArchitect: JEMS Architekci Sp. z o.o.

Area: 16,000 sqm

Services: Mechanical engineering

Project stage: Completed in 2014

Apartments „NA POWIŚLU”, Warsaw Investor: Powiśle Park Sp. z o.o.Architect: Kuryłowicz & Associates Sp. z o.o.

Area: 33,000 sqm

Services: Infrastructure design, Mechanical and electrical engineering

Project stage: Completed in 2014

Platinum Towers, WarsawInvestor: Atlas Management CompanyArchitect: Piotr Majewski MWH Architekci

Area: 45,000 sqm

Services: Mechanical and electrical engineering

Project stage: Completed in 2009

Sterlinga Business Center, ŁódźInvestor: Hines Polska Sp. z o.o.Architect: AHR Architects Sp. z o.o.

Area: 13,400 sqm

Services: Mechanical and electrical engineering

Project stage: Completed in 2010

Podlasie Opera and Philharmonic – European Art Centre, BiałystokInvestor: Podlaskie Voivodeship Marshall’s OfficeArchitect: Marek Budzyński-Architekt Sp. z o.o.

Area: 16,000 sqm

Services: Mechanical and electrical engineering

Project stage: Completed in 2012

Page 12: WSP - Poland

23WSP in Poland Reference List

SUSTAINABILITY AND ENERGYSELECTED PROJECTS

Park Rozwoju, Phase I and II, WarsawClient: Echo Investment S.A.

Area: 32,000 sqm

Services: Certification BREEAM International 2009 Office (Interim certificate; Stage I with Very good rating, Stage II with Excellent rating)

Timeframe: Stage I 2010 – 2012, Stage II 2012 – 2014

Quattro Business Park, CracowClient: BUMA Investor Sp. z o.o.

Area: 12,200 sqm (Building C)

Services: Certification BREEAM International 2009 Office (Interim & Final certificate with Very good rating)

Timeframe: 2011 – 2014

Sterlinga Business Center, ŁódźClient: Hines Polska Sp. z o.o.

Area: 13,400 sqm

Services: Certification BREEAM In-Use (with Excellent rating in categories Asset and Building Management)

Timeframe: 2014

Page 13: WSP - Poland

WSP in Poland Reference List 25WSP in Poland Reference List 24

FASHION HOUSE Outlet Centre Moscow and St PetersburgClient: FASHION HOUSE Group

Area: Moscow: 28,000 sqm, St Petersburg: 20,000 sqm

Services: Certification BREEAM International 2009 Retail, Additional studies

Timeframe: Building in Moscow 2010-2013, Building in St Petersburg – currently assessed

Sadyba Best Mall Warsaw, Lublin Plaza, Poznań PlazaClient: Klépierre Management Polska Sp. z o.o.

Area: Warsaw – 50,000 sqm, Lublin - 68,000 sqm, Poznań – 64,000 sqm

Services: Certification BREEAM In-Use

Timeframe: Since 2014

DOR Plaza, WarsawClient: DOR Group

Area: 14,000 sqm

Services: Certification BREEAM International 2009 Office (Interim certificate with Very good rating)

Timeframe: Completed in 2013

PointPark Poznań Buildings 5 and 6, logistics hall in Robakowo-GądkiClient: PointPark Properties Sp. z o.o.

Area: Building 5: 21,875 sqm, Building 6: 21,875 sqm

Services: Certification BREEAM International 2009 Industrial (Interim certificate with Very good rating)

Timeframe: 2011 - 2012

Centrum Handlowe Ogrody, ElblągClient: Centrum Ogrody Sp. z o.o.

Area: 40,000 sqm

Services: Certification BREEAM International 2009 Retail (Interim certificate with Very good rating)

Timeframe: 2011-2013

Plac Unii, WarsawClient: Liebrecht & wooD Poland Sp. z o.o. and BBI Development S.A.

Area: 41,000 sqm

Services: Certification BREEAM International 2008 Office and Retail (Final design certificate with Very good rating)

Timeframe: 2009 – 2012

Page 14: WSP - Poland

CONTACT DETAILS

Hugues MilletManaging [email protected]

Marek Dą[email protected]

Artur JackowskiChief [email protected]

Sylwester HofmanChief [email protected]

Łukasz WarzecChief [email protected]

Ewa Kowalska-OcneanuChief [email protected]

SOLUTION-DRIVEN DESIGNWe take a leading and proactive role in the delivery of integrated multi-disciplinary engineering solutions. In the delivery of technical solutions, we work closely with the Client and all members of the project team to ensure that the solutions are realistic and consider all projects’ constraints and limitations. Therefore our priority is to understand our Client’s brief. Based on that insight, we are able to solve technical issues and propose alternative, optimised and suitable solutions. As consultants, we believe communication is the key to successful project delivery. Therefore our project leaders, apart from being technical experts, are Client’s main contact point and coordinate all aspects related to our scope within the design team. All in-house engineering expertise enables us to deliver solutions, which contribute to the creation of world class, efficient and optimised buildings.

Page 15: WSP - Poland

WSP Polska Sp. z o.o.30 Rakowiecka St.02-528 Warsaw, PolandTel.: +48 22 480 80 80Fax.: +48 22 480 80 81