Workability of Concrete

Workability of concrete

Embed Size (px)

DESCRIPTION

Workability of concrete

Citation preview

Page 1: Workability of concrete

Workability of Concrete

Page 2: Workability of concrete

It must be easily mixed and transported. It must be uniform throughout a given batch, and

between batches. It must keep its fluidity during the transportation

period. It should have flow properties such that it is

capable of completely filling the forms. It must have the ability to be fully compacted

without segregation. It must set in a reasonable period of time. It must be capable of being finished properly,

either against the forms or by means of troweling or other surface treatment.

Requirement of Fresh Concrete

04/13/2023 2Plain and Reinforced Concrete - 1

Page 3: Workability of concrete

That property of freshly mixed concrete or mortar which determine the ease and homogeneity with which it can be mixed , placed, consolidated and finished.

( ACI )

Definition

04/13/2023 3Plain and Reinforced Concrete - 1

Page 4: Workability of concrete

Workability is the property of concrete which determine the amount of useful internal work necessary to produce full compaction.

Road Research lab, UK

Definition

04/13/2023 4Plain and Reinforced Concrete - 1

Page 5: Workability of concrete

Water content Mix Proportions Size of Aggregate Shape of Aggregate Surface texture of Aggregate Grading of Aggregate Use of Admixtures

Factors affecting Workability

04/13/2023 5Plain and Reinforced Concrete - 1

Page 6: Workability of concrete

Slump Test Compacting Factor Test

Flow Test Kelly Ball Test

Vee Bee Test

Measurement of Workability

04/13/2023 6Plain and Reinforced Concrete - 1

Page 7: Workability of concrete

Slump Test

04/13/2023 7Plain and Reinforced Concrete - 1

Page 8: Workability of concrete

Compacting Factor TestConcrete is filled in top hopper 1 meter highAllowed to drop in second hopperConcrete is dropped from second hopper into cylinder and leveledWeighed and emptiedFilled with fully compacted concrete and weighed againRatio of fallen weight to fully compacted concrete is compacting factor

04/13/2023 8Plain and Reinforced Concrete - 1

Page 9: Workability of concrete

Vee Bee Test Slump cone test

is performed in a closed cylinder of 300 mm dia.

Perspex plate is placed on top.

Vibration are applied at standard rate till plate is fully in contact.

Time in second to achieve state of concrete shown below is called Vee Bee

04/13/2023 9Plain and Reinforced Concrete - 1

Page 10: Workability of concrete

Flow

Test

Conical mould is filled with concrete and placed in centre of boardBoard is raised and dropped 15 timesSpread of concrete is measured and is called Flow

04/13/2023 10Plain and Reinforced Concrete - 1

Page 11: Workability of concrete

Kelly Ball Test

Simple field test which measures indentation of 15 cm dia metal hemisphere weighing 13.6 kg.Not suitable for thin or small concrete works.

04/13/2023 11Plain and Reinforced Concrete - 1

Page 12: Workability of concrete

Comparison of Slump and Flow Table Tests

04/13/2023 12Plain and Reinforced Concrete - 1

Page 13: Workability of concrete

Comparison Vee Bee and Compacting Factor Tests with Slump Test

04/13/2023 13Plain and Reinforced Concrete - 1

Page 14: Workability of concrete

Comparison of Slump and Kelly Ball test

04/13/2023 14Plain and Reinforced Concrete - 1

Page 15: Workability of concrete

Workability tests

Comparison

04/13/2023 15Plain and Reinforced Concrete - 1

Page 16: Workability of concrete

Variability in Results

Slump

Vebe

Comp Factor04/13/2023 16Plain and Reinforced Concrete - 1

Page 17: Workability of concrete

Affects of temperature on Workability of

Concrete

04/13/2023 17Plain and Reinforced Concrete - 1

Page 18: Workability of concrete

Affect of time on Workability

04/13/2023 18Plain and Reinforced Concrete - 1

Page 19: Workability of concrete

Setting time of Concrete

04/13/2023 19Plain and Reinforced Concrete - 1

Page 20: Workability of concrete

Setting of concrete is caused by water cement reaction.

Setting time of cement and concrete do not coincide.

Initial and final setting times are arbitrarily defined by method of penetration of needle

Final set of concrete do not mean complete loss of workability.

Initial set represent time after which concrete can not be mixed placed and compacted properly.

Final set indicates time after which strength development is at significant rate.

Setting time of concrete

04/13/2023 20Plain and Reinforced Concrete - 1

Page 21: Workability of concrete

Affect of temperature and cement type on workability

04/13/2023 21Plain and Reinforced Concrete - 1