Md. Shariful Haque Robin ID# 12206049 Program: BSCE IUBAT – International University of Business Agriculture and Technology Super-Structural Construction Work of a Six Storied Residential Building.

Super-Structural Construction Work of a Six Storied Residential Building

Embed Size (px)

Citation preview

Page 1: Super-Structural Construction Work of a Six Storied Residential Building

Md. Shariful Haque RobinID# 12206049

Program: BSCE

IUBAT – International University of Business Agriculture and Technology

Super-Structural Construction Work of a Six

Storied Residential Building.

Page 2: Super-Structural Construction Work of a Six Storied Residential Building

Aim

The aim of my presentation is to briefly discuss about the

building super-structural construction process & management

function.

223-Dec-15

Page 3: Super-Structural Construction Work of a Six Storied Residential Building

Contents to be Covered

Introduction Objectives Company profile and my project details Construction materials & equipment's Construction process of beam, slab, stair & column Problems & solution Overall benefits of the internship Conclusion and recommendation

323-Dec-15

Page 4: Super-Structural Construction Work of a Six Storied Residential Building

Introduction

In this presentation I will try to uphold about my 3 month’s practicum period experience of the construction work of a six storied residential building on super structural parts.

Superstructure is building parts located above the ground level such as column, beam, floor, wall and roof.

Here I have focused on mainly Beam, Slab, Stair and Column construction process and also the problems I have faced & my contribution to solve those.

423-Dec-15

Page 5: Super-Structural Construction Work of a Six Storied Residential Building

Objectives

To improve practical skill To upgrade the theoretical knowledge To supervise the construction work. To understand the design specification. To learn to solve the rising problems and unexpected

events.

523-Dec-15

Page 6: Super-Structural Construction Work of a Six Storied Residential Building

Company Profile

Company Name

Fervent Architects & Engineers Ltd. (Company Logo)

Company Type

Limited (by shares.)

License Type Consultancy (First class contractor)

Address Suite# A3,House# 35,Road# 14,Sector# 13,Uttara, Dhaka-1230

Phone +880 2-7913544

Email [email protected]

Website www.ferventbd.com6

23-Dec-15

Page 7: Super-Structural Construction Work of a Six Storied Residential Building

Company Organogram

723-Dec-15

Page 8: Super-Structural Construction Work of a Six Storied Residential Building

About My Project

8

Project Type On going

Project Category Residential

Name of Project Rafizuddin Address Plot no: 52, Road no:

14, Sector: 14, Uttara Model Town

Land Area 03 Khatha

Size of Land 2160 sft

No of Storey Ground Floor + 5 Floors

Fig 1: 3D view of Rafizuddin

23-Dec-15

Page 9: Super-Structural Construction Work of a Six Storied Residential Building

Typical Floor Plan (2nd to 5th Floor)

923-Dec-15

Page 10: Super-Structural Construction Work of a Six Storied Residential Building

Coarse Aggregate: Stone & Bricks chips (3/4" down and well graded )

Fine aggregate: Local & Sylhet Sand (FM 2.5)

10

Construction Materials

Fig 2: Bricks chips Fig 3: Stone chips

Fig 4: Local sand Fig 5: Sylhet sand23-Dec-15

Page 11: Super-Structural Construction Work of a Six Storied Residential Building

Construction Materials (continued)

Cement: Supercrete Reinforcement: KSRM (500W, 72.5 Grade)

11

Fig 6: Supercrete Cement Fig 7: KSRM Reinforcement

23-Dec-15

Page 12: Super-Structural Construction Work of a Six Storied Residential Building

Main Equipments

12

Fig 8: Concrete mixer machine Fig 9: Vibrator machine

23-Dec-15

Page 13: Super-Structural Construction Work of a Six Storied Residential Building

Main Equipments (continued)

13

Fig 10: Crane Fig 11: Bar cutter

23-Dec-15

Page 14: Super-Structural Construction Work of a Six Storied Residential Building

Construction Works

I have observed the following constructions process:

Beam construction. Slab construction. Stair construction. Column construction.

1423-Dec-15

Page 15: Super-Structural Construction Work of a Six Storied Residential Building

The following works are followed at the time of floor beam and slab construction:

ShutteringReinforcement bar placingCenteringCastingCuring

15

Construction of Beam and Slab

23-Dec-15

Page 16: Super-Structural Construction Work of a Six Storied Residential Building

16

Fig 14: Props for supporting Fig 15: Runner

Shuttering of Beam and Slab

Fig 12: Placed bottom & side shutter Fig 13: Joining side shutter

23-Dec-15

Page 17: Super-Structural Construction Work of a Six Storied Residential Building

Shuttering of Beam and Slab (Continued)

17

Fig 11: Shuttering work of slab before and after placing steel sheet

23-Dec-15

Page 18: Super-Structural Construction Work of a Six Storied Residential Building

Fig 16: Beam Layout

From figure, this green marking beam (Beam-2) width and depth, I checked after beam shuttering.

18

Shuttering of Beam and Slab (Continued)

23-Dec-15

Page 19: Super-Structural Construction Work of a Six Storied Residential Building

I checked the beam-2 width and depth. it was 10 width and ʺ13 depth.ʺ

19

(a) (b)

Fig 17: Checking (a) width and (b) depth of beam-2 Shutter.

Shuttering of Beam and Slab (Continued)

23-Dec-15

Page 20: Super-Structural Construction Work of a Six Storied Residential Building

Centering of Beam and Slab

20

Fig 18: Centering

23-Dec-15

Page 21: Super-Structural Construction Work of a Six Storied Residential Building

Reinforcement Placement of Beam

Mainly five type of bar using for beam, they are:

Top BarBottom BarExtra Top BarExtra Bottom BarStirrup

2123-Dec-15

Page 22: Super-Structural Construction Work of a Six Storied Residential Building

22

Fig 19: Placing beam reinforcement (Beam-1)

Fig 20: Stirrup binding of beam (Beam-1)

Reinforcement Placement of Beam (Continued)

23-Dec-15

Page 23: Super-Structural Construction Work of a Six Storied Residential Building

I Checked stirrup spacing and lapping distance of beam-2, In figure , it is showed by green marking.

23Fig 21: Floor beam layout

Reinforcement Placement of Beam (Continued)

23-Dec-15

Page 24: Super-Structural Construction Work of a Six Storied Residential Building

Reinforcement Placement of Beam (Continued)

For beam-2 constriction:3-16mmΦ bar in top 3-20mmΦ bar in bottom2-20mmΦ extra bars in bottom3-16mmΦ extra bars in topFor stirrup 10mmΦ bar

24

Fig 22: Floor beam-2 section

Fig 23: Beam-2 reinforcements arrangement 23-Dec-15

Page 25: Super-Structural Construction Work of a Six Storied Residential Building

(L/4) both side stirrups were arranged 5 c/c ʺ (L/2) stirrups were arranged 7 c/c. ʺ Lapping length 31 .ʺ

25

Fig 24: Checking stirrup spacing at end section of beam-2

Fig 25: Checking lapping distance of beam-2

Reinforcement Placement of Beam (Continued)

23-Dec-15

Page 26: Super-Structural Construction Work of a Six Storied Residential Building

Reinforcement Placement of Slab

26

Fig 26: Placing Slab Reinforcement in long and short direction

Fig 27: Placing Crank, extra top & bottom Reinforcement in slab

23-Dec-15

Page 27: Super-Structural Construction Work of a Six Storied Residential Building

Reinforcement Placement of Slab (Continued)

Where I checked slab bar spacing, lapping length and clear distances, which I have showed in figure by red marking line.

27

Fig 28: Slab Layout Plan

23-Dec-15

Page 28: Super-Structural Construction Work of a Six Storied Residential Building

Reinforcement bar spacing given 6 c/c in short direction ʺ5 c/c in long directionʺFrom supports L/4 distance given extra top

28

Fig 29: Reinforcement bar spacing checking in Slab

Fig 30: Checking the extra top bar length

Reinforcement Placement of Slab (Continued)

23-Dec-15

Page 29: Super-Structural Construction Work of a Six Storied Residential Building

Casting of Beam and Slab

After finishing binding all reinforcement, it was time for casting. Slab, beam and stair were casting at a time. In my site was used cement, sand and bricks chips ratio ware 1:1.5:3.

2923-Dec-15

Page 30: Super-Structural Construction Work of a Six Storied Residential Building

Casting of Beam and Slab (Continued)

30

Fig 31: concrete mixing in mixture machine

Fig 32: using crane for pulling up the concrete

Fig 33: Beam castingFig 34: During slab casting, using

vibrator & Steel runner.23-Dec-15

Page 31: Super-Structural Construction Work of a Six Storied Residential Building

Curing of Beam and Slab

31

Fig 35: Curing of beam by moist jute fabric

Fig 36: Making border for pond Fig 37: Curing of slab by ponding of water23-Dec-15

Page 32: Super-Structural Construction Work of a Six Storied Residential Building

Construction of Stair

The following works are followed at the time of stair construction:

Shuttering of stair Reinforcement bar placing Shuttering of treads and risers Casting of stair Curing of stair

3223-Dec-15

Page 33: Super-Structural Construction Work of a Six Storied Residential Building

Shuttering of Stair

33

Fig 38: shuttering of Stair

23-Dec-15

Page 34: Super-Structural Construction Work of a Six Storied Residential Building

Reinforcement Bars Placing

34

Fig 39: Reinforcement bar arrangement in stair Fig 40: Reinforcement bar placed in stair

2

1

3

23-Dec-15

Page 35: Super-Structural Construction Work of a Six Storied Residential Building

Shuttering of Treads and Risers

After placing all reinforcements, they placed wooden planks for making treads and risers.

35

Fig 41: Checking tread width Fig 42: checking riser height

23-Dec-15

Page 36: Super-Structural Construction Work of a Six Storied Residential Building

Casting & Curing of Stair

36

Fig 43: Using vibrator during stair casting Fig 44: Curing of stair by moist jute fabric

23-Dec-15

Page 37: Super-Structural Construction Work of a Six Storied Residential Building

Column Construction

The following works are followed at the time of column construction:

Kicker makingReinforcement bar placingShutteringCastingCuring

3723-Dec-15

Page 38: Super-Structural Construction Work of a Six Storied Residential Building

In my Presentation, I show the construction of column-2 (C2) which I have showed in figure by red marking.

38

Fig 45: Column layout

Column Construction (Continued)

23-Dec-15

Page 39: Super-Structural Construction Work of a Six Storied Residential Building

Kicker Making

39

Fig 46: Column kicker formwork

Fig 47: Checking kicker clear cover distances Fig 48: Checking kicker height

23-Dec-15

Page 40: Super-Structural Construction Work of a Six Storied Residential Building

Column Kicker Casting

In case of column kicker casting they maintained the mixing ratio about 1:1.5:3.

40

Fig 49: After kicker casting of column-2

23-Dec-15

Page 41: Super-Structural Construction Work of a Six Storied Residential Building

Reinforcement Placements of Column

41

Fig 50: Reinforcement Placements of Column-2 according to design

23-Dec-15

Page 42: Super-Structural Construction Work of a Six Storied Residential Building

42

Fig 51: Tie bar spacing checking in column-2 end section

Fig 52: Checking lapping length

Reinforcement Placements of Column

23-Dec-15

Page 43: Super-Structural Construction Work of a Six Storied Residential Building

Shuttering & Casting

43

Fig 53: Column-2 shuttering Fig 54: Column-2 casting

23-Dec-15

Page 44: Super-Structural Construction Work of a Six Storied Residential Building

Column Curing

44

Fig 55: wrapping column with jute fabric for Curing

23-Dec-15

Page 45: Super-Structural Construction Work of a Six Storied Residential Building

Problems and SolutionProblem 1: In accordance with the design sheet Beam-6 width was given as 10 but they used only 5 width in order to save some floor spaces.ʺ ʺ

Measures Taken: In order to compensate with the change they used 20mmΦ bar though it was given as 16mmΦ in the drawing.

45

Fig 56: Beam 6 size in design, Beam 6 size in reality

23-Dec-15

Page 46: Super-Structural Construction Work of a Six Storied Residential Building

Problem 2: In the crossing section of Beam-2 and Beam-5, they provided lapping for top reinforcement bar in Beam-2. It may cause danger for the structure.

Measures Taken: They provided extra two 16mmΦ reinforcement below the top bar.

46

Figure 57: Two beam crossing point

23-Dec-15

Page 47: Super-Structural Construction Work of a Six Storied Residential Building

Problem 3: Due to unavailability of steel sheet, they did not provide steel sheet in this area of slab.

Measures Taken : They used plastic fabric supported by wooden plate for this area to be covered.

47

Fig 58: Without steel sheet slab area shuttering

23-Dec-15

Page 48: Super-Structural Construction Work of a Six Storied Residential Building

Problem 4: In column-3 they did not maintain 40D (31in for 16mm bar) lapping length in accordance with the design. They give only 6in.

Solution: I discussed with our Project Engineer, then he ordered the foreman to fix it.

48

Fig 59: Did not maintain lapping length as per design

23-Dec-15

Page 49: Super-Structural Construction Work of a Six Storied Residential Building

Problem 5: In column-3 as per design this main bar will be of 16mmΦ but they had used a bar of 20mmΦ.

Solution: I informed our Project Engineer about the problem. Later on he solved the case by ordering the foreman

23-Dec-15 49

Fig 60: Did not maintain reinforcement placement as per design

Page 50: Super-Structural Construction Work of a Six Storied Residential Building

Challenges I have Faced

Shortage knowledge of working drawings like structural, architectural, sanitary, electrical and some other details.

Shortage of knowledge in some portion of the work at the site.

Unsatisfactory answers for questions from engineers. Unavailable safety facility.

5023-Dec-15

Page 51: Super-Structural Construction Work of a Six Storied Residential Building

Overall Benefits of the Internship

Improving practical skill Upgrading the theoretical knowledge Upgrading interpersonal communication skill Improving team playing skill Improving leadership skill

5123-Dec-15

Page 52: Super-Structural Construction Work of a Six Storied Residential Building

Recommendation to the Company

Testing of material is needed before use in construction. It is better to use steel formwork than wood formwork as it

is very repetitively used, stiff and not flammable easily and removed easily without damaging the concrete structure.

For avoiding segregation of concrete column should cast by half-half of its length in each floor.

Every construction worker should have maintained their Safety and security properly.

5223-Dec-15

Page 53: Super-Structural Construction Work of a Six Storied Residential Building

Conclusions

I have supervised beam, slab, stair & column construction work. After supervising my construction site, I have learned about beam, slab, stair & column construction and achieved practical experience. It seems to me that the practical knowledge is the most essential to be an efficient engineer. Overall the internship program laid sound foundation for us to start our career.

5323-Dec-15

Page 54: Super-Structural Construction Work of a Six Storied Residential Building