16

Solar power project costruction milestones

Embed Size (px)

Citation preview

Page 1: Solar power project costruction milestones
Page 2: Solar power project costruction milestones

Step 1: Site Survey

Page 3: Solar power project costruction milestones

Step 2: Leveling of site

Page 4: Solar power project costruction milestones

Step 3:Site after leveling

Page 5: Solar power project costruction milestones

Step 4:Marking of mounting structure

Page 6: Solar power project costruction milestones

Step 5:Drilling Holes for Foundations

Page 7: Solar power project costruction milestones

Step 6:Solar Foundations

Page 8: Solar power project costruction milestones

Step 7:Adjusted frame of solar panel

Page 9: Solar power project costruction milestones

Step 8:Fitting of Module & Alignment

Page 10: Solar power project costruction milestones

Step 9:DC Cable laying and conduit dressing

Page 11: Solar power project costruction milestones

Step 10:Control Room

Page 12: Solar power project costruction milestones

Step 11:Measure of tilt angle

Page 13: Solar power project costruction milestones

Step 12:Transmission line for solar plant

Page 14: Solar power project costruction milestones

Step 12:Transmission line

Page 15: Solar power project costruction milestones

Our Services

Page 16: Solar power project costruction milestones

• 405 A, Prakrati Corporate, Y N Road, Indore (INDIA)

452001

• +91-731 2970493, 6007860

Registered

Office

• SCO 48, 2nd Floor, Opposite P.O., Sector-8,

Panchkula (INDIA) 134109

• +91-172-4014288

Chandigarh

Office: • +91-172-4014288Office:

• A1-1603, Runwal Garden City, Balkum, Thane (W),

Mumbai (INDIA) – 400607

Mumbai

Office:

Email ID: [email protected],

[email protected]