Upload
statcon-energiaa
View
1.696
Download
3
Embed Size (px)
Citation preview
www.statconenergiaa.com MANOJ PANDE
INDIAN COLD CHAIN SHOW 2015
•Statcon Energiaa Pvt Ltd. is a group company of Statcon Power Controls
Ltd.(SOLAR/POWER/DEFENCE DIVISION), which has had over 26 years of expertise in
designing, manufacturing and technical support of equipment for the static energy
conversion, covering a broad spectrum of power, especially of static rectifiers.
•With a workforce of over 150 people Statcon Energiaa is now a dedicated design and
manufacturing unit in the field of solar photovoltaic, defence and power sector, catering
to their needs of Power Electronic equipments.
•The critical application areas include Defence, Railways, State Electricity Boards, power
generating stations, aviation, telecommunication and renewables.
About Us
180KWp Hybrid Rooftop Solar at District Court KHUNTI, Inaugurated By Hon’ble PM of India
MR. NARENDRA MODI
Khunti District Court
Coverage Of The Study By National Horticulture Mission And Ministry Of Agriculture At Shree Cold Storage Etawah running on Hybrid Solar System installed by STATCON
-Dainik Jagaran
©2015 STATCON ENERGIAA PVT
LTD www.statconenergiaa.com
MANUFACTURING UNIT AT PILKHUA
MANUFACTURING UNIT AT PILKHUA
©2015 STATCON ENERGIAA PVT
LTD www.statconenergiaa.com
OFFICE BUILDING IN SECTOR 63 NOIDA
©2015 STATCON ENERGIAA PVT
LTD www.statconenergiaa.com
Off-Grid Solar : Thinking Beyond Lights INDIAN COLD CHAIN SHOW 2015
Plant Details and Proposal
Problems Facing The Industry
Present Scenario
Actual System Contents
Conclusion
Off-Grid Solar : Thinking Beyond Lights INDIAN COLD CHAIN SHOW 2015
Plant Details and Proposal
Problems Facing The Industry
Present Scenario
Actual System Content
Conclusion
SOLAR POWER FOR ENHANCING CAPACITY
The Present Scenario :
In almost all developing countries including India, the status of Electricity
supply is as follows:
Availability - Extremely Poor
Continuity - Highly intermittent in nature
Quality - Very poor, full of fluctuations with
Harmonic distortions present
SOLAR POWER FOR ENHANCING CAPACITY
Sources of Electricity - Grid / Diesel – Generator Set ( DG Set )
Type of Loads - Mostly Motor Starting Loads, Lights and Fans DG Set Selection - 2.5 Times of normal Load due to Motor
Load
Grid Connection - At least 1.5 times resulting into high fixed charges meaning higher cost per unit.
Main operating costs - Electricity bills through Grid Fuel costs and its transportation.
Off-Grid Solar : Thinking Beyond Lights INDIAN COLD CHAIN SHOW 2015
Plant Details and Proposal
Problems Facing The Industry
Present Scenario
Actual System Content
Conclusion
Above is true not only for RURAL / REMOTE installations but even in URBAN India.
This results into loss of revenue, equipment reliability and users using Diesel Generator Sets (DG Sets) at lower operating power which means costs of unit going up to Rs 18-25 per unit.
Also larger cold storages need to be planned to offset such expenses .
In large number of Cold Storages used exclusively for Potato , they remain
Closed for 3-4 months in a year which could otherwise been used.
Limitation on use of smaller cold storages in remote areas due to Grid wire
Extension which is a costly affair.
So the solution lies in DISTRIBUTED GENERATION i.e.
HOME MADE ELECTRICITY
(मेरी बिजली मेरे घर)
Renewable Energy
+
Power Electronics
Does a Combination of…
Have a solution ??
PURE GRID-EXPORT PCU
ROOF-TOP SYSTEM
Courtesy: Helio
ANALYSIS OF GRID-EXPORT SOLAR INVERTER UNDER ROOF-TOP
Advantage :
• High conversion efficiency of PV Power into usable AC power
• Simple system with longer life i.e. no battery life issue.
Disadvantages:
• Works only under net-metering or with certain Load Vs
generation ratio only
• Under 3Ph unbalance, the energy generation suffers
• Normally inverters synchronize with grid only, hence do not
convert PV power into usable energy with small DG .
. Can not be used in Stand – alone mode .
ROOF-TOP SYSTEM
Renewable Energy
+
Energy Storage
+
Power Electronics
A Combination of…
Has a solution !
THE CAPACITY ENHANCEMENT
What are the daily constraints on capacity ?
What are the possible solutions ?
Is simple deployment of Renewable (Solar ) Power enough ?
Problems related with Excess Renewable Generation
Possible Hybrid Solutions with respect to the Applications
Energy Efficiency through Power Electronics
Off-Grid Solar : Thinking Beyond Lights INDIAN COLD CHAIN SHOW 2015
Plant Details and Proposal
Problems Facing The Industry
Present Scenario
Actual System Content
Conclusion
Details Of Solar Cold Storage Location : ETAWAH | U.P. | India
Months : Feb to Oct
PV capacity selected - 140 KWp
Battery - 800AH/520V Lead Acid,
Inverters :-
* VFD 1 : 120 hp (can also be used as Grid export)
* VFD 2 : 20 hp
* VFD 3 : 10 hp
DG2 (320KW)
Solar Power System for Cold Storage
DG1(40KW)
VFD 2
10HP
~
VFD 3
20HP
~ ~ ~ ~ ~
VFD 1
120HP
~
GRID
MPPT CHARGER
COMPRESSOR
120HP PUMP 1X10HP
MAIN CHARGER
C1
C2
BATTERY
VFD
PANEL
AC change-
over panel
PV
Condition # 1 PV Present , Grid available, Battery charging + Motor & load requirement shared by both but with PV as priority
BLOWERS 5X3 HP
SINE
WAVE
INV.
~ LIGHT & FANS
LOAD
TEMPERATURE
PROBE P L C
CHARGING
Solar Power System for Cold Storage
DG2 (320KW)
DG1(40KW)
GRID
MPPT CHARGER
MAIN CHARGER
C1
C2
BATTERY
AC change-
over panel
Condition # 2 PV Present, Grid unavailable. Battery charging + Motor & load requirement met by PV with as Battery as buffer.
PV
VFD 2
10HP
~
VFD 3
20HP
~ ~ ~ ~ ~
VFD 1
120HP
~ PUMP 1X10HP
VFD
PANEL
BLOWERS 5X3 HP
SINE
WAVE
INV.
~ LIGHT & FANS
LOAD
TEMPERATURE
PROBE P L C
CHARGING
Solar Power System for Cold Storage
DG2 (320KW)
DG1(40KW)
GRID
MPPT CHARGER
MAIN CHARGER
C1
C2
BATTERY
AC change-
over panel
Condition # 3 PV present, Grid un-available. Battery charging + Motors load requirement met by PV. With temperature achieved by compressor
working in Energy saving mode.
PV
VFD 2
10HP
~
VFD 3
20HP
~ ~ ~ ~ ~
VFD 1
120HP
~ PUMP 1X10HP
VFD
PANEL
BLOWERS 5X3 HP
SINE
WAVE
INV.
~ LIGHT & FANS
LOAD
TEMPERATURE
PROBE P L C
CHARGING
Solar Power System for Cold Storage
DG2 (320KW)
DG1(40KW)
GRID
MPPT CHARGER
MAIN CHARGER
C1
C2
BATTERY
AC change-
over panel
Condition # 4 PV present, Grid available. Battery charged & Motors load requirement is met by PV. With temperature achieved
,compressor works in Energy saving mode.
EXCESS POWER EXPORT TO GRID!!
VFD 2
10HP
~
VFD 3
20HP
~ ~ ~ ~ ~
VFD 1
120HP
~ PUMP 1X10HP
VFD
PANEL
BLOWERS 5X3 HP
SINE
WAVE
INV.
~ LIGHT & FANS
LOAD
TEMPERATURE
PROBE P L C
CHARGED
Solar Power System for Cold Storage
DG2 (320KW)
DG1(40KW)
GRID
MPPT CHARGER
MAIN CHARGER
C1
C2
BATTERY
AC change-
over panel
Condition # 5 PV & Grid un-available. Battery charging + Motors load requirement me by Battery only. With temperature achieved compressor working in Energy saving mode.
VFD 2
10HP
~
VFD 3
20HP
~ ~ ~ ~ ~
VFD 1
120HP
~ PUMP 1X10HP
VFD
PANEL
BLOWERS 5X3 HP
SINE
WAVE
INV.
~ LIGHT & FANS
LOAD
TEMPERATURE
PROBE P L C
DISCHARGING
Solar Power System for Cold Storage
DG1(40KW)
GRID
MPPT CHARGER
COMPRESSOR
120HP
MAIN CHARGER
C1
C2
BATTERY
AC change-
over panel
Condition # 6 PV & Grid un-available. Battery loosing 30% capacity. DG1 starts supplying Battery + Motors load requirements.DG1 running at 90% Load. Better DG set utilization
DG2 (320KW)
VFD 2
10HP
~
VFD 3
20HP
~ ~ ~ ~ ~
VFD 1
120HP
~ PUMP 1X10HP
VFD
PANEL
BLOWERS 5X3 HP
SINE
WAVE
INV.
~ LIGHT & FANS
LOAD
TEMPERATURE
PROBE P L C
DISCHARGING
Solar Power System for Cold Storage
DG1(40KW)
GRID
MPPT CHARGER
MAIN CHARGER
C1
C2
BATTERY
AC change-
over panel
Condition # 7 PV & Grid un-available. Battery losing 50% capacity. DG2 starts supplying Battery + Motors load requirements. DG2 running at >60% Load. After approx 2 hrs , changeover to DG1 anticipated.
DG2 (320KW)
COMPRESSOR
120HP
VFD 2
10HP
~
VFD 3
20HP
~ ~ ~ ~ ~
VFD 1
120HP
~ PUMP 1X10HP
VFD
PANEL
BLOWERS 5X3 HP
SINE
WAVE
INV.
~ LIGHT & FANS
LOAD
TEMPERATURE
PROBE P L C
CHARGING
Solar Power System for Cold Storage
DG1(40KW)
GRID
MPPT CHARGER
MAIN CHARGER
C1
C2
BATTERY
AC change-
over panel
Condition # 8 Grid resumes. Battery charging + Motors load requirement met by Grid with Battery buffer .
DG2 (320KW)
COMPRESSOR
120HP
VFD 2
10HP
~
VFD 3
20HP
~ ~ ~ ~ ~
VFD 1
120HP
~ PUMP 1X10HP
VFD
PANEL
BLOWERS 5X3 HP
SINE
WAVE
INV.
~ LIGHT & FANS
LOAD
TEMPERATURE
PROBE P L C
CHARGING
Solar Power System for Cold Storage
DG2 (320KW)
GRID
MPPT CHARGER
MAIN CHARGER
C1
C2
BATTERY
AC change-
over panel
Condition # 9 PV Present , Grid available Battery charging + Motors load requirement shared by both with PV priority
COMPRESSOR
120HP
VFD 2
10HP
~
VFD 3
20HP
~ ~ ~ ~ ~
VFD 1
120HP
~ PUMP 1X10HP
VFD
PANEL
BLOWERS 5X3 HP
SINE
WAVE
INV.
~ LIGHT & FANS
LOAD
TEMPERATURE
PROBE P L C
CHARGING
Solar Power System for Cold Storage
DG1(40KW)
GRID
MPPT CHARGER
MAIN CHARGER
C1
C2
BATTERY
AC change-
over panel
Condition # 10 OFF SEASON PV Present , Grid available . PV Power EXPORT to Grid under Net-Metering .
DG2 (320KW)
COMPRESSOR
120HP
VFD 2
10HP
~
VFD 3
20HP
~ ~ ~ ~ ~
VFD 1
120HP
~ PUMP 1X10HP
VFD
PANEL
BLOWERS 5X3 HP
SINE
WAVE
INV.
~ LIGHT & FANS
LOAD
TEMPERATURE
PROBE P L C
Off-Grid Solar : Thinking Beyond Lights INDIAN COLD CHAIN SHOW 2015
Plant Details and Proposal
Problems Facing The Industry
Present Scenario
Actual System Content
Conclusion
REAL TIME MONITORING OF DATA
-40
-20
0
20
40
60
80
100
120
0 5 10 15 20 25 30 35 40 45 50
TOTAL PV POWER BC POWER KW BATTERY POWER LOAD POWER KW
-20
0
20
40
60
80
100
120
0 5 10 15 20 25 30 35 40 45 50
LOAD POWER KW
-40
-20
0
20
40
60
80
100
120
0 5 10 15 20 25 30 35 40 45 50
TOTAL PV POWER LOAD POWER KW
-40
-20
0
20
40
60
80
100
120
0 5 10 15 20 25 30 35 40 45 50
TOTAL PV POWER BC POWER KW LOAD POWER KW
-40
-20
0
20
40
60
80
100
120
0 5 10 15 20 25 30 35 40 45 50
TOTAL PV POWER BC POWER KW BATTERY POWER LOAD POWER KW
Off-Grid Solar : Thinking Beyond Lights INDIAN COLD CHAIN SHOW 2015
Plant Details and Proposal
Problems Facing The Industry
Present Scenario
Actual System Content
Conclusion
Conclusion
• Major operating expenses (OPEX) are cost of electricity and fuel
• Electricity availability and its quality are a major concern
• Solar Solution with GRID-TIE inverter is not a good solution
• Solar Power + storage + Power Electronics offer the most cost effective solution with 4-6
years of payback period
• Major Subsidy(~30%) available through different agencies
GO FOR NOT JUST RENEWABLE ENERGY BASED SOLUTION BUT
GO FOR SMART ENERGY SOLUTION
STALL NO. C 33
www.statconenergiaa.com
INDIAN COLD CHAIN SHOW 2015