15
1| Page CURRICULUM VITE PERSONAL INFORMATION Name: Ragab Atta Ragab Nationality: Egyptian Current address: Benha / Emam st. no16 Tel.no :+201066010539 E.mail : [email protected] Date of birth : 08/06/1973 Marital status : Married Military status : Finished Education : Zagazig University B.SC. Sciences (math & computer dep.) Languages: -Arabic (mother tongue) -English (good) SKILLS 1. Study, review (as Consultant) or prepare (as Contractor) Shop Drawings according to Design. 2. Coordination and prepare Composite drawing for all activities. 3. Follow up the construction (as Consultant) or construct (as Contractor) the Surveying works for all activities. 4. Quantities survey for excavations & backfilling by computer programs. Autodesk Land Desktop program AutoCAD AutoCAD Civil3D TERRAMODEL Surfer program Microsoft windows Microsoft Office

Senior surveyor ragab atta c.v

Embed Size (px)

Citation preview

Page 1: Senior surveyor ragab atta c.v

1 | P a g e

CURRICULUM VITE

PERSONAL INFORMATION

Name: Ragab Atta Ragab

Nationality: Egyptian

Current address: Benha / Emam st. no16

Tel.no :+201066010539

E.mail : [email protected]

Date of birth : 08/06/1973

Marital status : Married

Military status : Finished

Education : Zagazig University

B.SC. Sciences (math & computer dep.)

Languages: -Arabic (mother tongue)

-English (good)

SKILLS

1. Study, review (as Consultant) or prepare (as Contractor) Shop Drawings

according to Design.

2. Coordination and prepare Composite drawing for all activities.

3. Follow up the construction (as Consultant) or construct (as Contractor)

the Surveying works for all activities.

4. Quantities survey for excavations & backfilling by computer programs.

Autodesk Land Desktop program

AutoCAD AutoCAD Civil3D

TERRAMODEL Surfer program

Microsoft windows Microsoft Office

Page 2: Senior surveyor ragab atta c.v

2 | P a g e

Experiences

September 2014 – up to now:

ACE Arab Consulting Engineers"Moharram.Bakhoum"

Project: MarassiSidi AbdE l-Rahman Resort Community,

Mediterranean-North Coast, EGYPT

Owner:Emaar Misr for Development S.A.E

PROJECT MANAGER:

Turner International Middle East

Position: Senior Survey Consultant

Project description:

INFRASTRUCTURE : Roads, IRRIGATION Network,SEWERAGE Network, STORM Network, TLECOM Network,WATER Network, LIGHTING &Medium Voltage& LowVoltage Network.

Desalination Plant. Sewage Treatment Plant Lift Stations. PUMP Stations. Landscapes. Superstructure

Page 3: Senior surveyor ragab atta c.v

3 | P a g e

October 2013 - August 2014(ARCHIRODON for Construction (Overseas) Co. S.A)

Position: Chief surveyor

Project: Tripoli Harbour Breakwater Reconstruction ProjectThe project includes the reconstruction, completion and maintenance of

4,700m long North-West Rubble Breakwater and the reconstruction and extension ofmain harbour road.

The main items of work comprise:- Construction of a rubble-mound-extend berm in front of the existing breakwater,including the roundhead together with the associated armoring, consisting of rock andpre-cast concrete cubes.- Construction of a new primary armor layer of Acropode units together with theassociated secondary armoring of rock on the slope.- Construction of an open canal filled with rock behind the existing parapet structure.- Reconstruction and strengthening of the parapet structure.- Reconstruction and extension of the main road and services behind the breakwater.- Construction of the planned sewerage outfall through the breakwater.

Major quantities:- Concrete : 360,000 m3- Reinforcement : 7,000 mt- Sheet piles : 16,000 m2- Rocks : 630,000 m3- Precast concrete armour units : 15,692 nos.- Precast concrete Accropode units: 16,592 nos.

- Asphalt : 10,479 m2

Page 4: Senior surveyor ragab atta c.v

4 | P a g e

July 2012 – October 2013

ASECfor Engineering and Management

Project:A lot of cement companies in Egypt•Building Materials Industries Company. (2011 - 2016)• El-Nahda Cement Company. (2011 - 2016)• South Valley Cement Company. (2008 - 2016)•Misr Cement Company "Qena". (2002 - 2016)•Misr BeniSuef Cement Company. (2002 - 2016)•Helwan Portland Cement Company. (2000 - 2016)• Sinai White Cement Company. (2001 - 2013)• Sinai Cement Company. (2001 - 2016)Position: Chief surveyor

DUTIES:we use the latest technology to perform the kiln hot alignment whilethe kiln is in normal operation such as

• Precise rollers and tyres diameters measuring device.• Latest and most accurate total station –Trimble 5601 DR• Accurate mini prisms and 360 prisms

Roller and tyres grinding restores their original cylindrical shapes andhence improve the area contact between them rollers and tyres grindingwhen carried out with the kiln hot alignment gives the best results andmaximize their lifetimes ASEC uses specially designed machines forgrinding:

• Rollers surfaces• Tyres surfaces• Tyres thrust face

Page 5: Senior surveyor ragab atta c.v

5 | P a g e

November 2011 – May 2012(Besix-Orascom JV, Egypt)

Project:El-Ain El sokhna Supercritical power plant

Consultant:• PGESCO• ENGINEERING AND CONSULTANTS (A & A)Owner:East Delta Electricity Production Company (EDEPC)

Position: Quantity surveyor

DUTIES:

• Prepare site layout & surveying work.

• The scope of civil works includes the construction of 3 pipelinestotaling a length of approximately 5.1 km

• Prepare shop drawing.

• Controlling execution of work:(Formwork, excavations, and backfilling)

• Make a surveying in each area.

• Issue inspection and test plan.• Helping the site team and in preparing work procedure and

method statement.

Page 6: Senior surveyor ragab atta c.v

6 | P a g e

November 2010 – November 2011(ARCHIRODON for Construction (Overseas) Co. S.A)

Project: Damietta cycle power plant 500mw.Consultant: Power Generation Engineering and Services CompanyPGESCo

Owner:East Delta Electricity Production Company (EDEPC)

• 4 Gas Turbine (500 MW).

• Piles .

• Civil .

• Infra Structure.

Position :Surveyor

DUTIES:

• Prepare site layout & surveying work.

• Prepare shop drawing.

• Controlling execution of work:(Formwork, excavations, and backfilling)

• Make a surveying in each area.• Issue inspection and test plan.

• Helping the site team and in preparing work procedure andmethod statement.

Page 7: Senior surveyor ragab atta c.v

7 | P a g e

May 2010 – November 2010

(ARCHIRODON for Construction (Overseas) Co. S.A)

Project:El-Ain El sokhna Supercritical power plant(Piling works)

Consultant:• PGESCO• ENGINEERING AND CONSULTANTS (A & A)

• Owner:• East Delta Electricity Production Company (EDEPC)

Position :Surveyor

DUTIES:

• Prepare site layout & surveying work.

• Prepare shop drawing.

• Controlling execution of work:(Formwork, excavations, and backfilling)

• Make a surveying in each area.

• Issue inspection and test plan.• Helping the site team and in preparing work procedure and

method statement.

Page 8: Senior surveyor ragab atta c.v

8 | P a g e

May 2009 – April 2010:

El- Nasr Building &Construction Company" EGYCO "

Project:

Ibney Betak projectConsultant:

Office Dr. Saadawi Consulting, EngineeringOwner:

Development Authority (Beni Suef - New Minya)Project description:

• Create the lift station• Create 46 through the different lengths of 1 kilometer to 5

kilometers in rocky ground

• Create internal structure (sewage and water supply)

Position :Survey Senior

DUTIES:

• Prepare site layout & surveying work.

• Prepare shop drawing.• Controlling execution of work:

(Formwork, excavations, and backfilling)• Make a surveying in each area.

• Issue inspection and test plan.

• Helping the site team and in preparing work procedure andmethod statement.

Page 9: Senior surveyor ragab atta c.v

9 | P a g e

September 2007 – March 2009:

(ARCHIRODON for Construction (Overseas) Co.S.A)

(Archirodon Arab Contractor- JV)

Project:New container terminal and Quay wall Damietta port Egypt

Consultant:• HPC Hamburg Port Consulting

• SELLHORN INGENIEURGESELLSCHAFT

Owner:Damietta international ports S.A.E.

Project description:• Quay wall for 1400m length with 38m height

• Container terminal area (280000 m2)

• Administration and amenities buildings and utilities

Position :SurveyorDUTIES:

• Prepare site layout & surveying work.

• Prepare shop drawing.

• Controlling execution of work:(Formwork, excavations, and backfilling)

• Make a surveying in each area.

• Issue inspection and test plan.

• Helping the site team and in preparing work procedure andmethod statement.

Page 10: Senior surveyor ragab atta c.v

10 | P a g e

April 2005 – May 2007:

Industrial and Engineering Projects CompanyProject:

Constructing of village at (Sahl-Eltena)Consultant:

Development of Sinai instrumentOwner:

Ministry of irrigationProject description:

• Constructing village on 240,000 m2 includes 350 cabins• Constructing a main building for its village• Constructing its services (roads & pipe lines & elevated tank…etc.)

Position :Surveyor

DUTIES:

• Prepare site layout & surveying work.

• Prepare shop drawing.

• Controlling execution of work:(Formwork, excavations, and backfilling) Make a

surveying in each area.• Controlling assembling of pipelines and its joints.

• Issue inspection and tests of pipelines and elevated tank.

• Helping the site team and supervisor in preparing workprocedure and method statement.

• Make a restrict and invoice with main contractorand subcontractor.

Page 11: Senior surveyor ragab atta c.v

11 | P a g e

January 2004 – February 2005:

(El salam-Misr for trading and contracting)

Project:Livestock terminal handing facility &infra structure

Consultant:Sabbour for consultants

Owner:Sokhna port development co. (SPDC)

Project description:• Live stock terminal area (206080 m2).

• Two roads (walk way & paving road).

• Cover areas by steel structure.

• Make water trough and footer trough for live stock terminal.

Position :Chief Surveyor

DUTIES:

• Make leveling for area for live stock terminal

• Issue inspection for leveling and compaction test.

• Maintain document register in connection with quality records.

• Make leveling for two roads (walk way & paving road).

• Helping the site team in preparing work procedure and methodstatement.

• Make a restrict and invoice with main contractorand subcontractor.

Page 12: Senior surveyor ragab atta c.v

12 | P a g e

January 2002 – December 2003:

(ARCHIRODON for Construction (Overseas) Co. S.A)

Project:Port Said East Container Terminal

Consultant:Posford Duvivier Haskoning, Pacer, U.K

Owner:Suez Canal Container Terminal S.A.E

Project description:• Container terminal area (400000 m2)

• Administration and amenities buildings

• Concrete paving blocks (360000 m2)

• Sand cement under concrete paving block.

Position :Surveyor

DUTIES:

• Prepare site layout & surveying work.

• Prepare shop drawing.

• Controlling execution of work:(Form work, excavations, backfilling

• Make a surveying in each area.

• Issue inspection and test plan.• Helping the site team and in preparing work procedure and

method statement.• Make a restrict and invoice with main contractor

and subcontractor.

Page 13: Senior surveyor ragab atta c.v

13 | P a g e

October 2000 – December 2001:

ELMansoura Petroleum Company

Project:Preparing the sites and its roads of drilling for natural gas

Owner:

EL Mansoura Petroleum Company

Project description:• Yard of drilling of ten sites (180000 m2)

• Roads service for this yards (50.0 km)

• Backfilling of coarse aggregate with thick (40 cm)

• Pipe lines services.

Position :Surveyor

DUTIES:

• Prepare site layout & surveying work.

• Make site leveling of areas and backfilling of it by coarseaggregate to prepare it for drilling.

• Make a surveying in each area and roads.

• Issue inspection and surveying check.• Helping the site team in preparing work procedure and method

statement.• Make a restrict and invoice with main contractor

and subcontractor.

Page 14: Senior surveyor ragab atta c.v

14 | P a g e

May 1999 – September 2000:

General Co. For Land Reclamation,Dev. & Recon.

Project:

Intakes 3&5&7 in El-Salam CanalConsultant:

Development of Sinai instrumentOwner:

Ministry of Irrigation

Project description:

• 3 pump stations• Main Pipes lines & sub main Pipes lines for El-Salam canal• Roads and excavations& backfilling work’s

Position :Surveyor

DUTIES:

• Prepare shop drawing.

• Controlling execution of work:

• (Form work, excavations, backfilling)

• Controlling assembling of pipelines and its joints.

• Issue inspection and tests of pipelines and elevated tank.• Supervising for roads (cut &fill) and pipe lines connected with

intakes.• Make coarse agg. For roads with thick. (30.0 cm)

Page 15: Senior surveyor ragab atta c.v

15 | P a g e

February 1998 – April 1999:

Heliopolis Co. for Housing and Dev.

Project:

Group of resident building

Owner:

Heliopolis Company for Housing and Development

Project description:

• Group of resident building• Infrastructure of resident building• Make a landscape of resident building

Position :Surveyor

DUTIES:

• Prepare site layout & surveying work.

• Controlling execution of work:(Form wok, excavations, backfilling)

• Supervising of group of resident building.

• Supervising of Road service of its group and green areawith parking.

• Helping the site team in preparing work procedure and methodstatement.

• Make invoice with main contractor.