Impasse Besse #12, Petion-Ville, Haiti. Tel. 3448-0853 ; 3434-2525 THE RIVIERE GLACE HYDROELECTRIC PROJECT GENERAL The Riviere Glace is located in the Grande Anse Department of Haiti. This river runs from the La Hotte mountain range to a land lock depression. A preliminary study was performed to estimate the potential power and energy generating capacity of Riviere Glace. A run-of-the-river scheme was selected as the most suitable. This facility could produce a maximum power output of 3,228 KW. Riviere Glace At the potential diversion dam location set at elevation 745 meters, the tributary basin area is 29 KM 2 , and the minimum flow is evaluated at 0.352 m 3 /s, while the maximum flow is evaluated at 1.997 m 3 /s. The project design flow is 1.5405 m 3 /s. The site available gross head is 294 meters. The project could be subdivided into two cascading installations to minimize the cost associated with the penstock. This project intends to generate electricity for the Sud Department, develop Haiti’s natural resources, and capitalize on the energy market. DESIGN DATA Dam Type: Dam Crest Elevation: Penstock Length: Penstock Diameter: Power House Elevation: Turbine Type: Number of Turbine: Design Flow: Maximum Power: Average Power: Minimum Power: Energy Generation: Estimated Const. Cost: Reinf. Concrete 745 meters 5,141 meters 0.750 meter 451 meters PELTON 2 1.5405 m 3 /s 3,228 KW 1,977 KW 875 KW 17,320,450 KWH $15,000,000 Power Duration Curve by Month PROJECT STATUS The firm of HYDRO CAMP-PERRIN is seeking suitable investors to form a partnership and develop this site. For further information please contact: Francis Mitchell, (305)-979-6387, [email protected] Philippe Bayard, (509)-3613-1313, [email protected]

Riviere Glace Hydropower Project Fact Sheet

Embed Size (px)

Citation preview

Page 1: Riviere Glace Hydropower Project Fact Sheet

Impasse Besse #12, Petion-Ville, Haiti. Tel. 3448-0853 ; 3434-2525

THE RIVIERE GLACE HYDROELECTRIC PROJECT

GENERAL

The Riviere Glace is located in the

Grande Anse Department of Haiti. This

river runs from the La Hotte mountain range

to a land lock depression.

A preliminary study was performed to

estimate the potential power and energy

generating capacity of Riviere Glace. A

run-of-the-river scheme was selected as the

most suitable. This facility could produce a

maximum power output of 3,228 KW.

Riviere Glace

At the potential diversion dam location set at elevation 745 meters, the tributary basin area

is 29 KM2, and the minimum flow is evaluated at 0.352 m3/s, while the maximum flow is

evaluated at 1.997 m3/s. The project design flow is 1.5405 m3/s. The site available gross

head is 294 meters. The project could be subdivided into two cascading installations to

minimize the cost associated with the penstock.

This project intends to generate electricity for the Sud Department, develop Haiti’s natural

resources, and capitalize on the energy market.

DESIGN DATA

Dam Type:

Dam Crest Elevation:

Penstock Length:

Penstock Diameter:

Power House Elevation:

Turbine Type:

Number of Turbine:

Design Flow:

Maximum Power:

Average Power:

Minimum Power:

Energy Generation:

Estimated Const. Cost:

Reinf. Concrete

745 meters

5,141 meters

0.750 meter

451 meters

PELTON

2

1.5405 m3/s

3,228 KW

1,977 KW

875 KW

17,320,450 KWH

$15,000,000

Power Duration Curve by Month

PROJECT STATUS

The firm of HYDRO CAMP-PERRIN is seeking suitable investors to form a partnership and

develop this site. For further information please contact:

Francis Mitchell, (305)-979-6387, [email protected]

Philippe Bayard, (509)-3613-1313, [email protected]