THE “GMP” Green Manufacturing Process
1
Our choice is to create buildings cheaper and better than average. Our concept can be also mobile, simple, smart,
durable, attachable, detachable, resalable, hand portable mountable by itself or turnkey by road, very little impact on the
ground, natural light ....It is as individual or collective, professional, recreational, humanitarian.... One can easily add options
such as solar or wind energy.
We reduce the economic cost to the benefit of the majority of Ukrainian end-user customers while improving the quality
of services such as insulation, heating and ventilation.
Our choice is to deny the systematic use of chemical industrial materials (concrete, glass wool, rock wool, plastic, OSB
formaldehyde, solvents, additives ...) . The total financial cost of production is huge (water, electricity, pollution, transport...)
The final customer pays expensive and harmful products for health.
Our choices are professionals. They are neither extremist nor mystical; we are in the "energy transition". We actually
diminish the impact of chemicals in nature using quality natural products found all around us such as wood, straw, reed,
earth, lime, calories from land, air, rain wooden pallets or tires materials. or recycled as iron on our mobile version
(recyclable life to 100%)...
Currently, the percentage of the cost of labor is equal to approximately 50% of the cost of construction; the other 50%
are the materials. ECS3 change to 70/80 % of global labor costs (in the production + assembling) and only 20 /30% of cost
of materials.
We prefer to work with people on site who need and want, using their expertise, their experience, their skill and their
hands. We do not like the noisy machinery, energy, low quality, often expensive (purchase + maintenance) , manufactured
by " subhuman " several thousand miles ... When possible we prefer to make ourselves our hand tools on site.
The module manufacturing is industrial, 90% of factory work. Engineers consulting firm and helps control production.
Several "client building sites" can be made at the same time in the same place by different people.
No delay due to weather, precision and industrial quality of work, poor waste management organized factory, no loss of
time or risk due to transport of the equipment on site, calculation of all quantities is optimized to avoid waste, wasted time
and unnecessary equipment ...
ECS-3.COM Project is economic first, and then ecologic:
2
Our process is reliable, efficient, low cost and reduces time of construction
• No lack of material, material supply is organized upstream
• All the specialists with all tools are scientifically organized
• Speed and effectiveness of controls on the production of all structural components
• Clean work on the site, better organization, better productivity
• Reduction of waste at the production site
• Reduction of risk of theft on site = reduction of costs
• No daily risks, costs & lost time by the builders on the road
• No delay due to bad weather
• Minimizes borrow physical soils of the building site
• Minimizes the carbon footprint in the air and in water
• High value of the Investment over time due to its 'mobility„, simplicity & low energy
• Construction accepted by most building codes in the world
• Costs known before the work begins
3
THE “GREEN MANUFACTORING PROCESS”
This process is the essential part of the project “ECS-3.COM”,
and consist of six activities:
- production of wooden frames
- production of straw panels
- production of reed panels
- plastering of protection layers
- manufacture of bricks and tiles made of clay
- production of fuel briquettes made of biomass
4
RAW MATERIALS USED
Materials which are used for the construction of our buildings
are local, natural and eco-friendly
Straw Sand Clay
Reed Wood Damask
5
RECYCLED MATERIALS
Waste of straw
Sawdust
Pallets Felt
Fuel briquettes 6
Materials which remain from the production,
and that can be recycled and used again
RAINBOW/GMP panels 0,6 kWh/m3
Cellulose coton 10 kWh/m3
Gas concrete 400 kWh/m3
Clay bricks 540 kWh/m3
Foamed glass 1600 kWh/m3
GMP ideal surface = 1000 m2
Productivity: between 1 and 2 panels per hour
Electrical energy :
For heating (18 ̊ C) – 24 kWh (max)
For production – 14 kWh
For lightning – 3-5 kWh
GMP CHARACTERISTICS
COMPARATIVE TABLE – GREY ENERGY SPENT
NB: we have conceived this production process to be able to
be autonomous in energy with solar panels + wind turbines 7
Территория «зеленого производства»
Village
Farm
Farm
Clay and sand
Reeds field
Fields of wheat
Farm
GMP
Storage & Quality control
Dry workshop
Wood workshop Cellulose workshop
Office
Clay
workshop
9 Plan of the GMP
10
STORAGE OF RAW MATERIALS
11
STORAGE OF RAW MATERIALS
12
STORAGE OF RAW MATERIALS STORAGE OF RAW MATERIALS
13
WOOD WORKSHOP
Production of panel frames
14
WOOD WORKSHOP
1. Racks for wood parts
15
WOOD WORKSHOP
2. Industrial circular saw
16
WOOD WORKSHOP
3. Jointers
17
WOOD WORKSHOP
4. Bath for wood treatment
18
WOOD WORKSHOP
5. Conveyors for wood parts
19
WOOD WORKSHOP
6. Table for assembling wood frames
20 Process of pressurizing panels
CELLULOSE WORKSHOP
21 1. Press-machine
CELLULOSE WORKSHOP
22 1. Press-machine
CELLULOSE WORKSHOP
23 2. Circular shaver
CELLULOSE WORKSHOP
24
CLAY WORKSHOP
Applying protection layers
25
CLAY WORKSHOP
1. Panel conveyor
26
CLAY WORKSHOP
2. Clay mixer
27
CLAY WORKSHOP
3. Panel tilter
28
CLAY WORKSHOP
4. Forklift
29
CLAY WORKSHOP
5. Panel loader
30
OFFICES AND DRY WORKSHOP
Administration area and dry zone for panels
31
STORAGE AND QUALITY CONTROL
Zone dedicated for measurements of panels
32
OTHER OPTIONAL WORKSHOPS
Examples of other workshops
that can be implemented