32
THE “GMP” Green Manufacturing Process 1

RAINBOW by ECS-3.COM: GMP (english version)

Embed Size (px)

Citation preview

Page 1: RAINBOW by ECS-3.COM: GMP (english version)

THE “GMP” Green Manufacturing Process

1

Page 2: RAINBOW by ECS-3.COM: GMP (english version)

Our choice is to create buildings cheaper and better than average. Our concept can be also mobile, simple, smart,

durable, attachable, detachable, resalable, hand portable mountable by itself or turnkey by road, very little impact on the

ground, natural light ....It is as individual or collective, professional, recreational, humanitarian.... One can easily add options

such as solar or wind energy.

We reduce the economic cost to the benefit of the majority of Ukrainian end-user customers while improving the quality

of services such as insulation, heating and ventilation.

Our choice is to deny the systematic use of chemical industrial materials (concrete, glass wool, rock wool, plastic, OSB

formaldehyde, solvents, additives ...) . The total financial cost of production is huge (water, electricity, pollution, transport...)

The final customer pays expensive and harmful products for health.

Our choices are professionals. They are neither extremist nor mystical; we are in the "energy transition". We actually

diminish the impact of chemicals in nature using quality natural products found all around us such as wood, straw, reed,

earth, lime, calories from land, air, rain wooden pallets or tires materials. or recycled as iron on our mobile version

(recyclable life to 100%)...

Currently, the percentage of the cost of labor is equal to approximately 50% of the cost of construction; the other 50%

are the materials. ECS3 change to 70/80 % of global labor costs (in the production + assembling) and only 20 /30% of cost

of materials.

We prefer to work with people on site who need and want, using their expertise, their experience, their skill and their

hands. We do not like the noisy machinery, energy, low quality, often expensive (purchase + maintenance) , manufactured

by " subhuman " several thousand miles ... When possible we prefer to make ourselves our hand tools on site.

The module manufacturing is industrial, 90% of factory work. Engineers consulting firm and helps control production.

Several "client building sites" can be made at the same time in the same place by different people.

No delay due to weather, precision and industrial quality of work, poor waste management organized factory, no loss of

time or risk due to transport of the equipment on site, calculation of all quantities is optimized to avoid waste, wasted time

and unnecessary equipment ...

ECS-3.COM Project is economic first, and then ecologic:

2

Page 3: RAINBOW by ECS-3.COM: GMP (english version)

Our process is reliable, efficient, low cost and reduces time of construction

• No lack of material, material supply is organized upstream

• All the specialists with all tools are scientifically organized

• Speed and effectiveness of controls on the production of all structural components

• Clean work on the site, better organization, better productivity

• Reduction of waste at the production site

• Reduction of risk of theft on site = reduction of costs

• No daily risks, costs & lost time by the builders on the road

• No delay due to bad weather

• Minimizes borrow physical soils of the building site

• Minimizes the carbon footprint in the air and in water

• High value of the Investment over time due to its 'mobility„, simplicity & low energy

• Construction accepted by most building codes in the world

• Costs known before the work begins

3

Page 4: RAINBOW by ECS-3.COM: GMP (english version)

THE “GREEN MANUFACTORING PROCESS”

This process is the essential part of the project “ECS-3.COM”,

and consist of six activities:

- production of wooden frames

- production of straw panels

- production of reed panels

- plastering of protection layers

- manufacture of bricks and tiles made of clay

- production of fuel briquettes made of biomass

4

Page 5: RAINBOW by ECS-3.COM: GMP (english version)

RAW MATERIALS USED

Materials which are used for the construction of our buildings

are local, natural and eco-friendly

Straw Sand Clay

Reed Wood Damask

5

Page 6: RAINBOW by ECS-3.COM: GMP (english version)

RECYCLED MATERIALS

Waste of straw

Sawdust

Pallets Felt

Fuel briquettes 6

Materials which remain from the production,

and that can be recycled and used again

Page 7: RAINBOW by ECS-3.COM: GMP (english version)

RAINBOW/GMP panels 0,6 kWh/m3

Cellulose coton 10 kWh/m3

Gas concrete 400 kWh/m3

Clay bricks 540 kWh/m3

Foamed glass 1600 kWh/m3

GMP ideal surface = 1000 m2

Productivity: between 1 and 2 panels per hour

Electrical energy :

For heating (18 ̊ C) – 24 kWh (max)

For production – 14 kWh

For lightning – 3-5 kWh

GMP CHARACTERISTICS

COMPARATIVE TABLE – GREY ENERGY SPENT

NB: we have conceived this production process to be able to

be autonomous in energy with solar panels + wind turbines 7

Page 8: RAINBOW by ECS-3.COM: GMP (english version)

Территория «зеленого производства»

Village

Farm

Farm

Clay and sand

Reeds field

Fields of wheat

Farm

GMP

Page 9: RAINBOW by ECS-3.COM: GMP (english version)

Storage & Quality control

Dry workshop

Wood workshop Cellulose workshop

Office

Clay

workshop

9 Plan of the GMP

Page 10: RAINBOW by ECS-3.COM: GMP (english version)

10

STORAGE OF RAW MATERIALS

Page 11: RAINBOW by ECS-3.COM: GMP (english version)

11

STORAGE OF RAW MATERIALS

Page 12: RAINBOW by ECS-3.COM: GMP (english version)

12

STORAGE OF RAW MATERIALS STORAGE OF RAW MATERIALS

Page 13: RAINBOW by ECS-3.COM: GMP (english version)

13

WOOD WORKSHOP

Production of panel frames

Page 14: RAINBOW by ECS-3.COM: GMP (english version)

14

WOOD WORKSHOP

1. Racks for wood parts

Page 15: RAINBOW by ECS-3.COM: GMP (english version)

15

WOOD WORKSHOP

2. Industrial circular saw

Page 16: RAINBOW by ECS-3.COM: GMP (english version)

16

WOOD WORKSHOP

3. Jointers

Page 17: RAINBOW by ECS-3.COM: GMP (english version)

17

WOOD WORKSHOP

4. Bath for wood treatment

Page 18: RAINBOW by ECS-3.COM: GMP (english version)

18

WOOD WORKSHOP

5. Conveyors for wood parts

Page 19: RAINBOW by ECS-3.COM: GMP (english version)

19

WOOD WORKSHOP

6. Table for assembling wood frames

Page 20: RAINBOW by ECS-3.COM: GMP (english version)

20 Process of pressurizing panels

CELLULOSE WORKSHOP

Page 21: RAINBOW by ECS-3.COM: GMP (english version)

21 1. Press-machine

CELLULOSE WORKSHOP

Page 22: RAINBOW by ECS-3.COM: GMP (english version)

22 1. Press-machine

CELLULOSE WORKSHOP

Page 23: RAINBOW by ECS-3.COM: GMP (english version)

23 2. Circular shaver

CELLULOSE WORKSHOP

Page 24: RAINBOW by ECS-3.COM: GMP (english version)

24

CLAY WORKSHOP

Applying protection layers

Page 25: RAINBOW by ECS-3.COM: GMP (english version)

25

CLAY WORKSHOP

1. Panel conveyor

Page 26: RAINBOW by ECS-3.COM: GMP (english version)

26

CLAY WORKSHOP

2. Clay mixer

Page 27: RAINBOW by ECS-3.COM: GMP (english version)

27

CLAY WORKSHOP

3. Panel tilter

Page 28: RAINBOW by ECS-3.COM: GMP (english version)

28

CLAY WORKSHOP

4. Forklift

Page 29: RAINBOW by ECS-3.COM: GMP (english version)

29

CLAY WORKSHOP

5. Panel loader

Page 30: RAINBOW by ECS-3.COM: GMP (english version)

30

OFFICES AND DRY WORKSHOP

Administration area and dry zone for panels

Page 31: RAINBOW by ECS-3.COM: GMP (english version)

31

STORAGE AND QUALITY CONTROL

Zone dedicated for measurements of panels

Page 32: RAINBOW by ECS-3.COM: GMP (english version)

32

OTHER OPTIONAL WORKSHOPS

Examples of other workshops

that can be implemented