Page 1: Projent management

polytechnic UNGKU OMAR

polytechnic PREMIER

JALAN RAJA MUSA MAHADI,

31400 IPOH PERAK DARUL RIDZUAN.

DEPARTMENT OF CIVIL ENGINEERINGPROJECT MANAGEMENT

PRESENTATION 11. TURNKEY.

2. EXPLAIN THE COMCEPT OF MOTIVATING3. CHOOSE THE MATERIALS USE IN CONSTRUCTION.

  NAME: AHMAD MUSTAQIM BIN AHMAD NAZRI ( 01DKA10F2074 ) MOHAMAD NIZAMUL HAYAT BIN IZAMUDDIN ( 01DKA10F2077 ) MUHAMMAD FAIZUL BIN SEDEK MUHAMAD ( 01DKA10F2105 ) BEH HUAN JIE ( 01DKA10F2102 )

CLASS: DKA 5CLECTURER: EN. ISMAIL BIN MOHD. ALIPERSENTATION DATE: 31/01/2013

Page 2: Projent management

Turnkey

is a type of project that is constructed so that it could be sold to any buyer as a completed product.

Common Usage Turnkey refers to something that is ready for immediate use, generally used in the

sale or supply of goods or services. Turnkey is often used to describe a home built on the developer's land with the developer's financing ready for the customer to

move in. "Turnkey" is commonly used in the construction industry, for instance, in which it

refers to the bundling of materials and labor by sub-contractors.

Example An example would be the creation of a "turnkey hospital" which would be

building a complete medical center with installed high-tech medical equipment.

Page 3: Projent management

What is turnkey in project management

• Turnkey is all responsibility located on contractor from planning stage, designing and regulatory until the project finished on time with the agreed price. There are two factor why this contract was introduced :

i. Urgent need of a specific projectii. Owner lack off the specialist group or consultant

Page 4: Projent management

Advantages of turnkey

i. Reduce time used for project implementation.

ii. Contractor involvement at an early stage to achieve more effective project.

iii. Reduce the involvement of developer directly on related things like technical problem, cost, time and others.

Page 5: Projent management

Disadvantages of Turnkey

i. High price for a project when compared with traditional systems.

ii. Could effects the participation of local consultants.

iii. Bumiputra contractor and local cannot compete to take part because it was used for the project high price and high management.

Page 6: Projent management

Motivation is inextricably linked with leadership and power Research has shown that use of autocratic, coercive or laissez-faire leadership styles can have a detrimental effect on motivation.

This is obvious to those  who have worked with such managers! More effective leadership styles emphasis the leader as an initiator, negotiator, coach and participant.

Most of the responses regarding successful motivation techniques centered on the importance of communication.

The Concept Of Motivating Of Project Management.

Page 7: Projent management

Some Practical Motivation-controlling Factors:

1. Optimizing Energy:This refers to the innate capacity for work, which differs from person to person.

2. Autonomy:Research indicates that autonomy results in better job satisfaction and, hence, increased intrinsic motivation.

3. Feedback:Research shows that positive, constructive feedback enhances motivation. Negative feedback, on the other hand, reduces both intrinsic and extrinsic motivation.

4. Rewards And Recognition:Rewards are related to extrinsic and recognition to intrinsic motivation. In their book, Peters and Waterman point out that successful companies make it an organizational goal to repeatedly recognize employee contributions

Page 8: Projent management

Choose the materials use in constructionWhat is a construction material ?

The material used for construction or the materials used to produce other materials which may be used in construction is called construction material.

Factor of choosing materials use in construction?i. Type and function of the building

ii. Economic aspects of the building/structure in terms of original investment and annual cost of maintenance.

iii. Availability of materials in the area.

iv. Quality and durability of different types of material.

v. Transportation costs.

vi. Availability of the skilled labour required to install some types of material.

Page 9: Projent management

Product Sources Desirable properties

Dimension stone Limestone, sandstone, granite, other igneous rocks.

Regular, widely spaced partings (bedding, joints), high compressive strength, resistance to weathering,

Aggregate ( for concrete and as fill for road and building foundations, dams )

Sand and gravel (fluvial, glacial, marine), crushed rock as for road stone, industrial waste

Appropriate range of particle sizes, low contents of impurities,

Bricks, tiles Clay, marine, alluvial, glacial or in deep weathering zones: raw materials fired at high temperatures

No excess water, low iron, sulphides, sulphates caco3>5% minimizes shrinkage,

Cement Limestone, argillaceous limestone, often mixed with clay: limestone converted to lime by calcining in kiln, product ground to powder

Constant composition, correct ratios cao, al203, sio2, fe2o3, low S, mgo, P, alkalies

Page 10: Projent management

Glass Quartz sand, quartzite Absence of impurities, low iron

Plaster, plasterboard Gypsum, anhydrite from evaporates

---

Insulating materials Fibrous and flaky metamorphic minerals, asbestos, mica, vermiculite: diatomite

Not injurious to health

Bitumen Residue from distillation of oil: natural residues of oil seepages

Appropriate melting temperature for conditions of use e.g. In road making

Page 11: Projent management

THANK YOU