Overview of Nuclear Education &Training Facilities and HRD Programme for Rooppur
NPP in Bangladesh
Technical Meeting on Effective Utilization of Nuclear Power Plant Simulators as
Introductory Educational ToolsMay 19-22, 2014, IAEA
Md. Kabir HossainConstruction of Rooppur Nuclear Power Plant Project
Bangladesh Atomic Energy CommissionEmail: [email protected]
Background Information;
Workforce for Rooppur NPP;
Status of Nuclear Education & Training Facilities for Rooppur NPP Programme;
Conclusion
Outline
Background Information
Full name: People's Republic of Bangladesh
Population: 160 million (8th in world)
Area: 143,998 sq km (55,598 sq miles)
Population Density: 1034 per sq km (4th in world)
Major language: Bengali
Educaction Rate: 60%
Major Profession: Agriculture, 50% GDP
Major religions: Islam
Main exports: Garments, fish, jute goods, leather products
Background Information
Bangladesh has begun its preparations for nuclear power in the 1960s and Rooppur Nuclear Power Plant (Rooppur NPP) Project site was selected in 1963;
The progress never passed the activities related to preparatory stage of construction;
A resolution for immediate establishment of NPP to combat existing power crisis was passed by the National Parliament in 2010 ;
Power System Master Plan 2010 of Bangladesh Government indicates that Bangladesh Government wants to introduce 2000 MWe of nuclear power by 2020;
Background Information
November 02, 2011 the Government of Bangladesh and the Government of Russian Federation signed an IGA on Cooperation Concerning the Construction of a Nuclear Power Plant on the Territory of the People’s Republic of Bangladesh – Cooperation Agreement
January 15, 2013 the Government of Bangladesh and the Government of Russian Federation signed an agreement on the extension of a state export credit for financing of the preparatory stage of construction of a Nuclear Power Plant – Credit Agreement
At the same time an MOU for the financing of the main stage of construction was also signed
Background Information
BAEC is a Government entity, which is responsible for promoting peaceful uses of atomic energy in the country.
Total manpower of BAEC stands at more than 2000, which includes about 500 professionals having wide experience in various fields of nuclear science and technology.
About 100 of these personnel have good exposure on various aspects of NP program.
Background Information
Workforce for the “Rooppur NPP”
Present manpower of “Rooppur NPP” Project is about 55 with 35 professionals-- Project Planning & Contract Negations: 7- Siting and Development: 9- Nuclear Technology: 7 - International Coordination & HRD: 5- Administration & Accounts: 7
Workforce for the “Rooppur NPP”
BAEC has proposed a tentative Organization Structure (OS) for the “Rooppur NPP” consisting of 1660 personnel;
The OS will be finalized in consultation with NPP technology supplier in due course of time;
Proposed OS has been submitted to the MOST for creation of posts and 97 has been sanctioned for preparatory stage of construction with 48 technical personnel;
Workforce for the “Rooppur NPP”
It is expected that 380 posts will be created in the second phase (2016), and the rest (i.e., 1146) will be sequentially;
The OS proposes a total of 1048 technical personnel including 699 for O&M activities of the Rooppur NPP as follows:Operation Group (510) Maintenance Group (189)− Professionals : 226 – Professionals : 86− Technicians : 158 – Technicians : 72− Craftsmen : 126 – Craftsmen : 31
Workforce for the “Rooppur NPP”
In the OS, category-wise distribution of 1048 Technical Workforce has been proposed as follows: Qualified Professionals : 513 (49%) Technicians/ Technologist : 325 (31%) Craftsman : 210 (20%)
TOTAL : 1048 (100%)
49%
20%
31%
Craftsmen
Engineers Technicians
Workforce for the “Rooppur NPP”
Disciplines Divisions/SectionsNumber of Posts
Operations Maintena-nce
General Service
Procure-ment
NSSS QMS IT Unit NPP TC Sc. Info.
Admin DG/DDG
Nuclear Engineering 41 40 0 0 0 0 0 1Mechanical Engineering 104 44 29 16 1 5 5 0 3 1Chemical Engineering 37 16 7 0 0 9 3 0 2Electrical Engineering 96 40 33 15 1 2 2 4 2Civil Engineering 16 0 0 13 1 1 0 1Computer Sc. & Engg. 31 2 6 7 1 0 0 10 2Reactor Physics 20 20 0 0 0 0 0 0Health Physic 11 6 0 0 0 5 0 0Nuclear Chemistry 4 4 0 0 0 0 0 0Chemistry 26 18 0 0 0 5 1 0 2Physics 52 18 2 3 3 16 3 0 2 5Applied Physics 17 6 4 2 1 0 3 1Engineering (CE/CSE/EE/ME/ChE) 19
0 0 0 5 14 00
0 0
Head/Director/DDG/DG 39 12 5 5 1 7 1 1 1 2 4
TOTAL: 513 226 86 61 14 64 15 18 17 7 1 4
Proposed Distribution of 513 Qualified Professionals
Workforce for the “Rooppur NPP”
202120192017 20182016201420132009 2012
35 100 380 1145 People will recruited sequentially
Preparatory Construction Phase Main Construction phase
2015
Zero point for starting of NPP (O&M Personnel)
Erection All testing
90%(O&M, QA)
100% (O&M)
Proposed Workforce Distribution of Rooppur NPP
1660
A general approach of recruiting manpower for Rooppur NPP year by year during different milestones has been proposed on the basis of the following issues:
different work functions;
qualification of manpower and;
Experience and training requirements for different work function categories;
Recruitment and Staff Training Strategy for Rooppur NPP
Connection to the Grid
2021
Start of FSS training of plant engineers, reactor engineering, computer engineering, modification engineering
20192017 20182016
•On site training•Maintenance personnel trained and allocated•Design and organization of the control training centre and simulator
•FCD for Rooppur NPP•Zero point for starting of NPP Personnel (O&M, QA, nuclear fuel, Safety , emergency Personnel)
20152014
•Hiring consultant for RNPP;
2013
•Preparing Rooppur NPP personnel•Required knowledge
2009 2012
•Definition of the Project management & Project management structure•Completion of skilled surroundings
Supporting Project
Preparatory construction Phase
Main Construction phase
HRD pr
epar
ation
for
Proje
ct RN
PP
Participation of Rooppur NPP personnel on site (trained O&M, QA, personnel, Safety personnel
Workforce Planning for Rooppur NPP
Status of Nuclear Education & Training Facilities for Rooppur NPP Programme
BAEC has a good number of professionals in various branches of nuclear technology;
The Core Manpower for preparatory activities of the Rooppur Nuclear Power project is available in BAEC;
A dedicated group of professionals is working for the regulatory body; Fresh professionals for Rooppur NPP and the nuclear regulatory body
will be available from the General Universities, Universities of Engineering and Technology and Technical Institutions from their annual out put;
A training Institute under BAEC has been established to train the professionals in the field of nuclear technology. Presently this institute offers fundamental courses on nuclear technology to the junior professionals of BAEC;
The appointment of fresh professionals for preparatory stage construction of “Rooppur NPP” and “Regulatory Body” are in progress;
Status of Nuclear Education & Training Facilities for Rooppur NPP Programme
The Government has taken initiatives to strengthen infrastructure for education and research in nuclear science and technology and major universities have been instructed in this regard;
A couple of universities in the country are taken initiatives to open nuclear engineering courses, mostly in the post-graduate level.
Dhaka University has started Nuclear Engineering department for graduate and post graduate level.
Status of Nuclear Education & Training Facilities for Rooppur NPP Programme
A leading technical university (a public univ.) of the country BUET (Bangladesh University of Engg. & Technology) is also working to start NE courses at different levels;
BRAC university (a private univ.) has signed MoU with BAEC for joint collaboration in the area of nuclear science & technology education;
Technical Institutions (Polytechnic and Vocational) located in Dhaka is being requested to introduce appropriate courses on nuclear energy;
Status of Nuclear Education & Training Facilities for Rooppur NPP Programme
Total Number of Public Universities = 34o General = 21o Engineering = 5o Science & Technology = 7o Medical = 1
Total Number of Private Universities = 52o General = 44o Engineering = 3o Science & Technology = 5o Medical = 0
Total number of Students in Private Universities is about 280,822 (Year: 2011)
Academic institutions available in the country
6724
2
6714
5
7063
5
7819
2
9256
2
9215
2
1047
36
1123
27
1136
97
1532
49
1553
45
1591
34
2635
41
3016
31
4842
87
0
100000
200000
300000
400000
500000
600000
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Num
ber o
f Stu
dent
Year
Number of Students in Public University
44
3 50
05
101520253035404550
Genarel University Engineering University
Science & Technology University
Medical University
Num
ber
Annual Intake of Undergraduate Students in Different NP Related Subjects
Phy
Chem
APECE
ACCE
ME
EEE
CSE
CE
IPE
MME
ChE
ICT
0 200 400 600 800 1000 1200
765
645
285
290
710
1075
1135
775
200
50
110
510
No. of Undergrad Students
Total: 6,550Engg: 2,920
RNPP Needs: 513
Diploma Engineering Program (4 yrs course after SSC) in Polytechnic Institutes
Number of Institutes : 230Public : 50Private : 180
Total Capacity : 44,200Public Institutes : 16,580Private Institutes : 27,620
Relevant Diploma Courses Offered in Public Polytechnic Institutes
Name of the Technology No. of Students
Telecommunication Technology 120
Mechatronic Technology 40
Instrumentation and process Technology 160
Environmental Technology 400
Construction Technology 200
Architecture and Interior Design Technology 520
Chemical Technology 40
Civil Technology 1500
Computer Technology 1920
Electrical Technology 1020
Electronic Technology 1480
Mechanical Technology 700
Power Technology 600
Refrigeration and Air Conditioning Technology 680
Surveying Technology 40
TOTAL: .. 9,421
RNPP Needs: 324
Vocational Training Centers
1. SSC Vocational Course (2-yr duration)
Total Institutes : 1958Public : 154Private : 1804
Total Intake (annual) : 959,000
2. HSC Vocational Course(2-yr duration)Total Institutes : 64Public : 64
Total Intake (annual) : 8,430
RNPP Needs: 210
Possible Resources for “Rooppur NPP” Program
Institutions NPP related annual intake
Rooppur NPP Needs
Universities Public-34 ~7000 513Private-52
Polytechnic /Diploma Public-50 ~10000 325Private-180
Secondary vocational Public-155 ~1000000 210Private-1800
Higher Secondary vocational
Public-64 ~10000
IAEA Assistance to Use Simulator BAEC has training Institute;
BAEC has proposed to establish an “Advanced Institute of Nuclear Engineering and Technology (AINET)”with full facilities of NP programme;
Public/Private Universities;
Bangladesh seek assistance to provide PC based simulator as educational tools to the above mentioned Institutions;
IAEA may dispatch an expert mission to train a team from the above mentioned Institutions;
Bangladesh faces a huge challenge in implementing the Rooppur NPP and its total nuclear power;
A preliminary assessment has been chalked out a plan to find out methods that can be applied to find out our gaps and then fill them up;
Bangladesh seeks cooperation from the Russian Federation in the form assistance package like National training courses, Seminar/Workshop, Expert Mission/Review and other form of bilateral arrangements in establishing infrastructure for “Rooppur NPP” building;