Office Building in Järnbrott Structural Systems: Design and Assessment | VBB122 | MPSEB | October 23, 2015 Joel Raúl Patrik Andreas Josefin Eriksson Espasandín Olsson Oscarsson Panarelli Final Presentation

Office Building in Järnbrott

Embed Size (px)

Citation preview

Office Building in Järnbrott

Structural Systems: Design and Assessment | VBB122 | MPSEB | October 23, 2015

JoelRaúl

PatrikAndreas

Josefin

ErikssonEspasandínOlssonOscarssonPanarelli

Final Presentation

AGENDA

Intuitive phase

Evaluation

Structural layout, members and behaviour

Building envelope solutions

Production

Conclusion / Further investigation

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

AIM OF THE PROJECT

Provide a proposal for a structural system for a two-storey office building.

The proposal should fulfill all requirements set by the client and other stakeholders

while being economically viable and create an added value for the stakeholders of

the project.

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

SITUATION

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

BUILDING SITE

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

REQUIREMENTS AND DEMANDS

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

Max 1200 m²/floor

Building height < 9m

Two entrances, one in the north and one in the south

Glass facade towards north and south

Roof terrace

Flexible design

Low investment and maintenance cost

Environmental consideration

One or more than one tenant

PLAN

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

PRELIMINARY INTENTION

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

Flexible

Light

Functional

Open spaces

Sustainable

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

1.Timber prefabricated elements

2.Timber-concrete hybrid slab, timber columns and CLT walls

3. Concrete in situ, rigid joints

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

4. Prefabricated concrete columns and beams with a HDF-deck

5. Concrete TT

6. IPE Steel Beams, HEA steel columns and composite slabs

PRELIMINARY EVALUATION: CRITERIA

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

x

PRELIMINARY EVALUATION

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

x

Concept: Steel concreteConcept: Timber Concept: Concrete HDF

PRELIMINARY EVALUATION: PROMISING CONCEPTS

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

1. Prefabricated concrete columns and beams with a HDF-deck

2. Timber slab, timber columns and CLT walls

3. IPE Steel Beams, HEA steel columns and composite slabs

4

Main EntranceN

Terrace

Entrance

W

8

45

4

Section  A

-

­A

Section  C

-

­C

Section  B

-

­B

A A'

B B'

C C'

STEEL ALTERNATIVE

1

1 1

1/4000 4 8 m

OCT 2015

OFFICE  BU

I LDI NG  IN

  JÄR

N

BROTT

0-0

Joel Eriksson STRUCTURAL SYSTEMS: DESIGN

AND ASSESSMENT (VBB122)

Raúl  E

s

pasandí n

Patrik Olsson Andreas Oscarsson

Josefin Panarelli

4

Main EntranceN

Terrace

Entrance

W

8

45

4

Section  A

-

­A

Section  C

-

­C

Section  B

-

­B

A A'

B B'

C C'

STEEL ALTERNATIVE

1

1 1

1/4000 4 8 m

OCT 2015

OFFICE  BU

I LDI NG  IN

  JÄR

N

BROTT

0-0

Joel Eriksson STRUCTURAL SYSTEMS: DESIGN

AND ASSESSMENT (VBB122)

Raúl  E

s

pasandí n

Patrik Olsson Andreas Oscarsson

Josefin Panarelli

5,3

Main Entrance

Section  A

-

­A

Terrace

Entrance

W

6

1,7

5,2

9

4,7

66

5,6

56

2,3

9

3 6,7 7

2,3

3 5,3 7 4

4,3

2,8

10,8

A A'

B B'

C C'

Section  C

-

­C

Section  B

-

­B

N

TIMBER ALTERNATIVE

2

1 1

1/4000 4 8 m

OCT 2015

OFFICE  BU

I LDI NG  IN

  JÄR

N

BROTT

0-0

Joel Eriksson STRUCTURAL SYSTEMS: DESIGN

AND ASSESSMENT (VBB122)

Raúl  E

s

pasandí n

Patrik Olsson Andreas Oscarsson

Josefin Panarelli

5,3

Main Entrance

Section  A

-

­A

Terrace

Entrance

W

6

1,7

5,2

9

4,7

66

5,6

56

2,3

9

3 6,7 7

2,3

3 5,3 7 4

4,3

2,8

10,8

A A'

B B'

C C'

Section  C

-

­C

Section  B

-

­B

N

TIMBER ALTERNATIVE

2

1 1

1/4000 4 8 m

OCT 2015

OFFICE  BU

I LDI NG  IN

  JÄR

N

BROTT

0-0

Joel Eriksson STRUCTURAL SYSTEMS: DESIGN

AND ASSESSMENT (VBB122)

Raúl  E

s

pasandí n

Patrik Olsson Andreas Oscarsson

Josefin Panarelli

RISK ANALYSIS

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

RISK EVALUATION

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

FINAL EVALUATION

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

x

FINAL CONCEPT

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

Timber slab, timber columns and beams and CLT walls

STRUCTURAL LAYOUT

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

Span length beams: 6 meter

Span length deck: 7 meter

The building fulfils the requirement

of having a facade less than 9 meters

high.

STRUCTURAL BEHAVIOUR: VERTICAL LOADS

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

Compression

Tension

Bending

STRUCTURAL BEHAVIOUR: HORIZONTAL LOADS

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

Compression

Tension

Bending

Wind

STRUCTURAL BEHAVIOUR

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

Results of the SAP2000 Model

Wind Load 5x

STRUCTURAL BEHAVIOUR

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

Results of the SAP2000 Model

Office building in Växjö

STRUCTURAL MEMBERS

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

Column b h

First floor 225 mm 225 mm

Entrance floor 270 mm 270 mm

CLT-wall b h

First and entrance floor 2000 mm 95 mm

STRUCTURAL MEMBERS

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

Beams b h

Roof 140 mm 630 mm

Terrace 190 mm 810 mm

First floor 140 mm 765 mm

Lignatur deck b h

Roof and first floor 2400 mm 360 mm

Slab h

Entrance floor 150 mm

IMPORTANT CONNECTIONS

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

IMPORTANT CONNECTIONS

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

SPECIFICATIONS

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

Limits/values Tolerance

Widht 190 mm ± 2 mm

Height ≤ 400 mm [-2,4] mm

> 400 mm [-0.5;1] %

Lenght ≤ 2 m ± 2 mm

2 < L ≤ 20 m ± 0.1 %

> 20 m ± 20 mm

MC 16 % (target value) 13.5 - 18%

BUILDING ENVELOPE SOLUTIONS

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

PRODUCTION

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

FURTHER INVESTIGATIONS

Office Building in Järnbrott | VBB122 | MPSEB | October 2015

The followng topics should be further investigated and designed:

1. Could the columns at the north and south facade be removed in order to create a

lighter impression?

2. The foundation should be designed, number of piles per pile cap. Will there be a

risk for differential settlements between the slab and piles?

3. Will there be a need for anchorage in the foundation? Possible tilting should be

investigated.

4. The glass facade should be designed with secondary beams and connections to

the bracing system.

5. Could the bracing system be slimmed (i.e. are can any shear walls be removed)?

Thank you for your attention!

Office Building in Järnbrott | VBB122 | MPSEB | October 2015