Upload
basavarajsankin
View
210
Download
4
Embed Size (px)
Citation preview
LIFE SUPPORT SYSTEM FOR
MARS ONE MISSION
-BASAVARAJ SIDDAPPA
MASTERS IN AEROSPACE SCIENCE TECHNOLOGY –EETAC,CASTELLDEFELS
Technical presentation on,
01-06-2016 LIFE SUPPORT SYSTEMS 01
CONTENTS
• Roadmap of mars one mission
• Mars one habitat overview.
• Physical properties of ECLSS habitat
• In-situ resource processing system
• Water management
• Atmosphere management
• Thermal control system
• Wet waste processing system
• Post crew operations to be done
• Key technical issues
• Ethical issue
• References
CONTENTS OF PRESENTATION
2011Mars One
Founded
2013Start Crew
Selection
2017Start Crew
Training
2020Lander &
Comsat
2022Rover
Mission
2024Cargo
Missions
2025Outpost
Operational
2026Departure
Crew One
2027Landing
Crew One
2028Departure
Crew two
2011Mars One
Founded
2013Start Crew
Selection
2017Start Crew
Training
2020Lander &
Comsat
2022Rover
Mission
2024Cargo
Missions
2025Outpost
Operational
2026Departure
Crew One
2027Landing
Crew One
2028Departure
Crew two
2011Mars One
Founded
2013Start Crew
Selection
2017Start Crew
Training
2020Demo &
Comsat
2022Rover
Mission
2024Cargo
Missions
2025Outpost
Operational
2026Departure
Crew One
2027Landing
Crew One
2028Departure
Crew two
2011Mars One
Founded
2013Start Crew
Selection
2017Start Crew
Training
2020Lander &
Comsat
2022Rover
Mission
2024Cargo
Missions
2025Outpost
Operational
2026Departure
Crew One
2027Landing
Crew One
2028Departure
Crew two
2011Mars One
Founded
2013Start Crew
Selection
2017Start Crew
Training
2020Lander &
Comsat
2022Rover
Mission
2024Cargo
Missions
2025Outpost
Operational
2026Departure
Crew One
2027Landing
Crew One
2028Departure
Crew two
2011Mars One
Founded
2013Start Crew
Selection
2017Start Crew
Training
2020Lander &
Comsat
2022Rover
Mission
2024Cargo
Missions
2025Outpost
Operational
2026Departure
Crew One
2027Landing
Crew One
2028Departure
Crew two
2011Mars One
Founded
2013Start Crew
Selection
2017Start Crew
Training
2020Lander &
Comsat
2022Rover
Mission
2024Cargo
Missions
2025Outpost
Operational
2026Departure
Crew One
2027Landing
Crew One
2028Departure
Crew two
2011Mars One
Founded
2013Start Crew
Selection
2017Start Crew
Training
2020Lander &
Comsat
2022Rover
Mission
2024Cargo
Missions
2025Outpost
Operational
2026Departure
Crew One
2027Landing
Crew One
2028Departure
Crew two
2011Mars One
Founded
2013Start Crew
Selection
2017Start Crew
Training
2020Lander &
Comsat
2022Rover
Mission
2024Cargo
Missions
2025Outpost
Operational
2026Departure
Crew One
2027Landing
Crew One
2028Departure
Crew two
2011Mars One
Founded
2013Start Crew
Selection
2017Start Crew
Training
2020Lander &
Comsat
2022Rover
Mission
2024Cargo
Missions
2025Outpost
Operational
2026Departure
Crew One
2027Landing
Crew One
2028Departure
Crew two
2011Mars One
Founded
2013Start Crew
Selection
2017Start Crew
Training
2020Lander &
Comsat
2022Rover
Mission
2024Cargo
Missions
2025Outpost
Operational
2026Departure
Crew One
2027Landing
Crew One
2028Departure
Crew two
MARS ONE HABITAT ECLSS OVERVIEW
PHYSICAL PROPERTIES OF ECLSS HABITAT
REGOLITH WATER EXTRACTION
N2/AR EXTRACTION
PRIMARY WATER PROCESSOR
WATER QUALITY MONITORING
ATMOSHERE MANAGEMENT- ELECTROLYSIS
ATMOSPHERE MANAGEMNT -AIR REVITALIZATION
PARTICULAT CONTRL
TRACE CONTAMINANT
POST FIRE RECOVER
AIR TEMP CONTROL
HUMIDITY CONTROL
HAET COLLECTION HEAT TRANSPORT
HEAT REJECTION INSULATION
WWPS – HUMIDITY EXCHANGE MEMBRANE
POST CREW ARRIVAL OPERATIONS - 2027
PARTICULATE MATTER LIMIT
ATMOSHERIC COMPOSITION
RELATIVE HUMIDITY
HABITUAL TEMPERATURE
ISRU WATER PRODUCTION
REGOLITH SUPPLY
KEY ISSUES ( TECHNICAL )
• Service Life
• Hardware ,Spares, consumables mass
• Nominal Habitat Atmospheric Pres
• Leak Detection, isolation And Repair
• Water availablity and Quality
• ISRU Interface With Regolith
• Power Sources
• Effect Of Low Gravity On Habitat
• Alternative Technologies
REFERENCES
• Mars one habitat ECLSS conceptual design
assessment- Paragon space develop corporation