Case Study of Pump Mfg. Company

Title: Lean Journey from Changodar to Colombo

Presented

on 2nd Feb 2015

@ 3rd Annual Lean Conference,

AMA, Ahmedabad

Page 2: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

M/s. Waterman Industries Private Limited,

Ahmedabad, Gujarat, India

WEL COME YOU ALL

Lean Manufacturing for Productivity Enhancement

Mr. Bharat B. Patel

Managing Director

15 – 17 Dec 2014

Colombo, Sri Lanka

Page 3: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Our Products

Page 4: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Dealer strength – 750 Nos.

• We have stock points in all over India with a strong

dealer network under them

WATERMAN

MANUFACTURING

PLANT AT

AHMEDABAD,

GUJARAT, INDIA

WATERMAN –

MAJOR STOCK

POINTS IN

DIFFERENT

STATES OF INDIA

WATERMAN

PRODUCTS –

EXPORT

COUNTRIES

Page 5: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Challenges before Lean

Space constraint

2 different manufacturing locations (Upper Floor & Lower

Floor)

High inventory

Pending order, late delivery, Urgent material requirement

High Manpower

No choice only Lean Training & Implementation

Page 6: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Lean Implementation Scheme by the Govt. of India

• We have participated in Pump Manufacturers’ Cluster

• We have paid Rs. 38,000 ($ 633) and balance money was

paid by the government Appointed M/s. ADDVALUE

Consulting Inc., India as a lean manufacturing consultant

and Its team has helped us to implement lean

manufacturing.

• National Productivity Council (NPC) directors visited us

frequently to audit the progress and given time to time

suggestion for improvement.

Page 7: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

TOTAL LEAN MANAGEMENT ATTACK MUDAs

Identify Reduce

Eliminate MUDAs

thru

VALUE ADDING

WORKSHOP (VAW)

World Class, Lean, Fit,

Competitive &

Sustainable Organizations

Unawareness of

Lean Management Tools Muda of Transportation Muda of Motion

Muda of Waiting Muda of Rejection Muda of Over Processing Muda of Inventory

Muda of Over Production Muda of Unused

Human Potential

Page 8: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Creating World Class Organizations

Creating Lean Foundations through TOP Management Commitment & 5S

Creating World Class Organizations = “TOTAL LEAN MANAGEMENT”

TFM TPM TQM TSM THM

SUPPL I ERS

CUSTOMERS

TOTAL

FLOW MANAGEMENT

TOTAL

PRODUTIVE

MAINTENANCE

TOTAL

QUALITY

MANAGEMENT

TOTAL

SERVICE

MANAGEMENT

TOTAL

HUMAN

MANAGEMENT

Identify, Reduce & Eliminate Muda (Waste) Continually– across the Value Chain

Focus

on

Quality, Cost

& Delivery

Focus

on

Quality, Cost

& Delivery

ADD VALUE Through

TOTAL Employee Involvement (TEI)

Continual Process Improvements

Zero Defects Application of Lean Tools

( AVCI- 9 steps)

Page 9: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Lean Tool implementation in our company

• 5S

• On first day, we have removed absolute and

unwanted material and recovered Rs. 3,60,000/-

($ 6000/-) from the scrap

• Arrangement of raw material pick up by own

vehicle

• Total Flow Management (TFM)

• Visual Management

Page 10: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Plant Layout : Before Plant Layout : After

Page 11: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Before After

Page 14: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Roadblocks we faced and how we tackled it

No Type of Waste Issues Our action

1 Space and cleanliness

We have space constraint on ground floor

We have removed absolute material and machineries

2

Transportation of material and worker

As company has 2 different manufacturing locations, Upper Floor & Lower Floor. It is observed considerable transport of the resources (material & worker)

We have shifted first floor factory to ground floor

3

Inventory of Rs. 3.25 cr

Company keeps enormous amount inventory to support its manufacturing process. This area has considerable opportunity of improvements.

We have purchased ERP software and reduce raw material, semi-finished and finished stock

4

Over production and man-power utilisation

Separate machine shop and winding department for 4” and 6” submersible pumpsets. Hence, man-hour was wasted during off season of each product.

We have combined machine shop and winding department for 4” and 6” submersible pumpsets for utilisation of man-power in both the department even in off season.

5 Visual Management

Pending order, late delivery, urgent material requirement

Oldest pending order board and Urgent raw material requirement board

Page 15: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Visual on Waste Reduction

Two-bin system

Visual on Oldest Pending Orders and

Urgent requirement

Photographs after implementing Lean Manufacturing

Page 16: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Photographs after implementing Lean Manufacturing

Next-to-next process Material at work place with two bin system

Next-to-Next process Empty space on first floor

Page 17: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Dept. wise - 5S Score-card Scrap Area defined

Palette for C.I. Parts Weight with trolley

Photographs after implementing Lean Manufacturing

Page 18: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Straight Gang-way Gang-way at machine shop

Photographs after implementing Lean Manufacturing

Page 19: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Stock level display board, Workmen will use only green tag

material from the rack.

Photographs after implementing Lean Manufacturing

Page 20: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Photographs after implementing Lean Manufacturing

Go Gauge No GO Gauge

Page 21: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Ancillary Hub Located only 1 Km away from our company

Six sheds are available exclusive for WATERMAN labour vendor

(Muda of Transportation reduced from 25 km to 1 km)

Page 22: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Major Benefits to our company through Lean

(Financial and Non-Financial)

• Smooth production flow

• Quick traceability of jobs, manpower etc.

• Multi skill manpower develop,

• Single point supervisory,

• Manage work-in-process (WIP),

• Small batch production,

• Space & man power saving,

• Reduced delivery time,

• Reduced rework etc…

Page 23: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Benefits

Sr. No.

Parameter Before After Benefit

1 Production/ Productivity

1000 Pump (V3, V4)

1200 Pump (V3, V4)

Production Increased By 20%

2. Space Utilized 6000 Sq. Ft. 2500 Sq.

Ft. 58% space saving

3. Rework Reduction Rework reduced by 30%, This has increased the Throughput time (TPT) by 8 to 10%

4. Manpower 185 150 Rs. 42 Lakh

($ 70,000)/ Year

5. TOTAL TPT

Total throughput time has been reduced. Earlier company was making 1000 pump/month(V3,V4). At present production is of 1200/month. Hence, production is increased by 20%.

Page 24: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Key Learning

Purchase & Manufacturing as per demand

Material & Information flow should be synchronize

5S is the fundamental

Page 25: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Strategy for Lean Sustenance

• Top Management commitment

• Training

• Faith on Lean Management

• Team for Lean

• 5S (Cleanliness) competition

• Motivation for Kaizen activity

• Audit

Page 26: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Waterman - Team

Page 27: Lean journey from changodar to colombo - case study of pump mfg. company - 3rd annual lean conference 2015

Contact details (M) : +91 99250 28282

Email: [email protected]

APPLY LEAN & TURN OUT TO BE