POORNIMA INSTITUTE OF ENGINEERING AND TECHNOLOGY

A PRESENATION ON

PROJECT NAME {edit it}

PROJECT GUIDE: MEENIAKSHI DIXITSUBMITTED BY: ANIL MEENA

ANKIT MALIK CHHINDERPAL

KIRTI SUNDESHA

DEPARTMENT OF CIVIL ENGINEERINGSession (2015-2016)

Page 2: kirti project

CONTENTS

1. Advancement of Project.

A) Project description

B) Methodology Description

2. Difficulties faced.

3. Time plan with probable date of Completion

4. Photographs

5. Conclusion

6. Bibliography

Page 3: kirti project

ADVANCEMENT IN PROJECT

PROJECT DISCRIPTION

To study the chemical composition of the egg shell to find its suitability of replacement in the concrete.

Eggshell powder

Replacing cement by eggshell powder as 2%, 2.5% and 5% by weight

Page 4: kirti project

To examine the feasibility of utilizing the egg shell and micro silica as cement replacement material.

Micro silica

Properties of micro silica

• spherical particles less than 1 μm in diameter

• Specific gravity 2.2 to 2.4

Page 5: kirti project

To study the strength parameters of the egg shell powder mixed specimens and to compare it with conventional specimens.

Strengths to be examined:

1. compressive strength

2. Flexural strength

3. Split tensile strength

Page 6: kirti project

MEDHTODOLOGY

STEP 1 STUDY OF JOURNALS AND RESEARCH PAPERS

STEP 2CALCULATION OF

QUANTITY OF MATERIALS

1. EGGSHELL- 1 Kg2. CEMENT- 2 bag

3. AGGREGATES- 450 Kg4. MICROSILICA- 500 gm

STEP 3 ARRANGEMENT OF MATERIALS

1.EGGSHELL2.CEMENT

3,.AGGREGATES4.MICRO SILICA

Page 7: kirti project

STEP 4 CASTING OF PLAIN CUBES

CASTING OF MODIFIED CUBES

STEP 5 STRENGTH CHECK AT 7 DAYS

STEP 6 STRENGTH CHECK AT 28 DAYS

Page 8: kirti project

STEP 7 CALCULATIONS {EDIT IT}

STEP 8 RESULTS ANALYSIS {EDIT IT}

STEP 9 GUIDE EVALUATION

Page 9: kirti project

DIFFICULTIES TACKELED

NON AVAILIBILITY OF EQUIPMENTS AND MACHINERY

CRUSHING OF EGGSHELL EXTENDING UPTO 90 MICRON

Page 10: kirti project

EXPECTED TIME SCHEDULE{edit it}

15-Feb-16

17-Feb-16

19-Feb-16

21-Feb-16

23-Feb-16

25-Feb-16

27-Feb-16

29-Feb-16

0 2 4 6 8 10 12

replaced 5%replaced 2.5%repalced 2%replaced 0%

Page 11: kirti project
Page 12: kirti project

CONCLUSION {edit it}

Egg shell powder obtained from industrial wastes is added invarious ratios for cement replacement and it was found thatreplacement of 5% Egg shell powder + 20 % Microsilica canbe added without any reduction in compressive strength

propertiesof conventional cement. And replacement of 5% Egg shellpowder + 10% Micro silica replacement in cement yields

similarflexural strength as in conventional concrete. And replacementof 5% Egg shell powder + 10% Micro silica replacementin cement yields higher Split Tensile strength as compared toother compositions.

Page 13: kirti project

bibliography

[1] Sathish Kumar.R, “Experimental Study on the Properties of Concrete Made With Alternate Construction Material”, International Journal of Modern Engineering Research (IJMER), Vol. 2, Issue. 5, Sept.-Oct. 2012, pp-3006-3012. 

[2] D.Gowsika , S.Sarankokila , K.Sargunan. "Experimental Investigation of Egg Shell Powder as Partial Replacement with Cement in Concrete", International Journal of Engineering Trends and Technology (IJETT), V14(2),65-68 Aug 2014. ISSN:2231-5381. www.ijettjournal.org. published by seventh sense research group

[3] C.Marthong, “Sawdust Ash (SDA) as Partial Replacement of Cement”, International Journal of Engineering Research and Applications (IJERA), Vol. 2, Issue4, July-August 2012, pp.1980-1985.