INTRODUCTION OF

“INFRASTRUCTURE” PROJECT

2014.05.20-23

Page 2: Intro infrastructure project 2015.02.26

Electricity Heating Water

supplement Sewage system

Page 3: Intro infrastructure project 2015.02.26

Infrastructure projects are to construct to supply

consumption, infrastructure engineering lines & network, and

construction of facilities in the newly proposed districts with

42,000 apartments to be built in Ulaanbaatar, to serve 26700

seats school children, 7100 seats kindergarten, to serve 4350

residents per a day hospitals, 2,000 job vacancies public

services centers, shopping centers, hotels, sports, swimmingpool, cultural centers and office.

PURPOSE OF PROJECT

Page 4: Intro infrastructure project 2015.02.26

THE PROJECT OF INFRASTRUCTURE

"The Mongolian Government Action Plan 2012-2016 approved which is to

intensify engineering infrastructure, supporting to intensified of "New

construction" plan, to expedite the implementation of the program,

constructing the infrastructure under the engineering policy, reconstructing

the treatment of technology innovation for urban water supply, wastewater

and to develop objectives infrastructure.

“The Infrastructure project” of the Ministry of Construction and Urban

Development was established by the Government Resolution No 118 dated

on 30th 3th July, 2013 in order to implement the Government Action Plan of

years of 2012-2016 and intensify its activities on providing citizens with

housing.

Page 5: Intro infrastructure project 2015.02.26

Implementing project

the general planning of districts

“Yarmag ” residential

district

“Bayan gol am” residential

district Residential district

“VII-р sub district ”

“Buyant-Ukhaa”residential

district

Around “Public

broadcasting center ”

“Ireedui complex ”

district

Center of Ulaanbaatar

“Solongo” district

26 construction works are ongoing the frame of "Infrastructure project" on the 7 districts of

Ulaanbaatar. Attributable to: - Completed jobs –12

- Ongoing work – 2

- Implementation of the new jobs - 12

Frame of the "Infrastructure" projects,

there are able to built in the Bayangol,

Buyant-Ukhaa, “Solongo”, VII

microdistrict, microdistrict near MNB,

“Yarmag" and "Ireedui" housing areas’

infrastructure construction, totally 26

packages work of engineering networkare to implemented.

Page 6: Intro infrastructure project 2015.02.26

“BUYANT UKHAA ”RESIDENTIAL DISTRICT ENGINEERING LINES

In 2013, the "Infrastructure" projects executed totally electricitysupplement division 6, 400 - 630kVA capacity closed substation 59with equipment,112.2 km long cable line systems connection, centralheating distribute supplement construction, water supplementcenter 17, the water of distribution heating equipment assemblywork 1, clean water supply 20 deep wells, 2 water pools with acapacity of 2800 m3 , F11-315mm diameter 18.2 km long pipe linework, waste water pump station 2, F150-600 mm diameter 14.1 kmlong pipe line assembled the tasks were completed successfullycompleted. Total 20,000 m3 of waste water treatment plantconstruction to be built in Buyant- Ukhaa residential area by 2015.

Page 7: Intro infrastructure project 2015.02.26

1 . The construction work of Buyant-Ukhaa residential areas where have been

doing the drinking water sources , 20 pieces wells , V = 2800kh2 m3 of 2 pcs

reservoir and pump station , construction of power supply.

"BUYANT-UKHAA" DISTRICT ENGINEER INFRASTRUCTURE

Page 8: Intro infrastructure project 2015.02.26

2 . f400 mm 2863 m double line is continued from fresh water resource,

from the pump station to the ring line is continued 546 m and a totally

3884 pipes , 120 m access channel construction work on the Buyant-

Ukhaa residential area.

Page 9: Intro infrastructure project 2015.02.26

3 . F 315 mm 10031, 2 m, F 110 mm diameter of fresh water 70 m ring line, and

80 m channel access of the construction work of Byant-Ukhaa residential area.

Page 10: Intro infrastructure project 2015.02.26

4 . F 200 mm 2242 m double line with waste water pressure , f 200 mm 2820

lines , f160 mm 1042 m line , 2 pieces stations and 40 m access channel

construction on the Buyant- Ukhaa residential area.

Page 11: Intro infrastructure project 2015.02.26

5 . From Shine Yarmag sub-station 10 kV 2 complex structures is to delivering

dispense facilities are 9.89 km , architecting and designing the 9.9 MW power

cable work and construction on the Buyant-Ukhaa residential area.

Page 12: Intro infrastructure project 2015.02.26

6. 2 complex division of 10 kVis distribution network of approximately 9.9

MW capacity to meet demand for the power supply, 2*400 Kwa capacity TP 25

kits , 33.0 km long 10 kV cable lines achecture has designed and

construction on the Buyant-Ukhaa residential area

Page 13: Intro infrastructure project 2015.02.26

7. 10 pieces archectures design of heating & water delivering center,

construction on the 10th parts of Buyant- Ukhaa residential district

Page 14: Intro infrastructure project 2015.02.26

8. The design and archectures of the 13v magistrali 400 double line of

heating and 100 m line 7th pump station is to pair to extend into f400 mm and

to become the corridor system construction on the Buyant- Ukhaa residential

district.

Page 15: Intro infrastructure project 2015.02.26

9 . Design and 20,000 m3 of waste water treatment plant construction Buyant- Ukhaa

residential area.

Page 16: Intro infrastructure project 2015.02.26

Water, hearing 10 pieces center

Delivering station 25 pieces

20 pecies deep well

9 600 м wast woter line

10 031 м fresh water line

2х2800 м3 volume water pool

ENGINEERING INFRASTRUCTURE OF “BUYANT

UKHAA” RESIDENTIAL DISTRICT

Page 17: Intro infrastructure project 2015.02.26
Page 18: Intro infrastructure project 2015.02.26

GENERAL PLANNING OF THE BUYANT-UKHAA

RESIDENTS DISTRICT

Page 19: Intro infrastructure project 2015.02.26

BAYANGOL RESIDENTIAL DISTRICT ENGINEERING

NETWORKS

• Design and construction work for 10 pieces of CTP installation of heating

station

• Bayangol residential district electrical supply for the 10 kV distribution network,

estimated to provide approximately 13 MW of capacity utilization close to 10

kV with AE - 3 complex , 2 * 400kVA mighty TP 33 kits , 59.9 km long 10 kV

cable picture project and construction,

• Bayangol residential district substation 10 kV 3 NT 12 km into the complex 13

MW power cable for use by the design and construction.

Page 20: Intro infrastructure project 2015.02.26

“IREEDUI” COMPLEX AREA’S OF ENGINEERING NETWORKS

• “Ireedui” complex area’s waterФ150 - 350 11 - mm main line4377 m , swimming pool designand construction,

• 2nd round of “Ireedui” complexarea’s water Ф150 - 450 mmand main line 2200 m ,swimming pool design andconstruction,

• 2nd round of construction workfor “Ireedui” complex area’selectrical supply for the 10 kVdistribution network, 2 *630kVA mighty TP 1 kits , 5 kmlong 10 kV cable outline projectand construction,

Page 21: Intro infrastructure project 2015.02.26

YARMAG HOUSING AREAS OF ENGINEERING NETWORKS

• Yarmag housing area’s 15.0 km of water main pipeline project andconstruction

• Yarmag housing area’s 14.5 km sewage main line drawings andconstruction

• Yarmag housing area’s electrical supply for the 10 kV distribution network,estimated to provide 14.3 MW of capacity utilization close to 10 kV withAE - 3 complex , 2 * 400kVA mighty TP 36 kits , 37.6 km long 10 kV cablepicture project and construction

• Near Yarmag bridge district substation 10 kV 1 NT 12 km into the complex15 MW power cable for use by the design and construction

Page 22: Intro infrastructure project 2015.02.26

VII RESIDENTIAL DISTRICT ENGINEERING NETWORKS

• Design and construction work for

6 pieces of CTP installation of

heating station in 7th residential

district.

NEAR MNB RESIDENTIAL DISTRICT ENGINEERING NETWORKS

• Design and construction work for 6

pieces of CTP installation of

heating station on 6 parts in district

near Mongolian National

Broadcasting residential district.

“SOLONGO " RESIDENTIAL AREA OF ENGINEERING NETWORKS

• “Solongo" residential area outsidewater pipes expand and sewagemain pipe design and construction

Page 23: Intro infrastructure project 2015.02.26

PROJECT RESULTS

Currently, " Infrastructure " project has been fulfilled successfully 95.6

billion worth, total 5 distribution facilities of the electricity supplies, 59

closed buildings substation with a capacity of 250 - 630kV with equipment,

112.2 km long cable line construction, 20 heat transferring centeral

buildings , 20 wells of clean water supplyment , 2 water tank pools with a

capacity of 2,800 m3 , 18.2 km long line pipe F110 - 315 -mm diameter are

constructed , and 2 waste water pump station , 14.1 km long pipeline F150 -

600 -mm diameter assembled were successfully completed in Ulaanbaatar.

ACHIEVEMENTS OF PROJECT

Page 24: Intro infrastructure project 2015.02.26

1. Nowadays there are some solve problems have been appeared which

are depended on the lines and equipment of plants very fewer. So using

the importing the most equipment is from the Republic of China and

Russia to construction works of infrastructure. Beside them, to waste

the time, lost money for importing very much that is appeared the

negative results for the country’s economics. In order to decide those

solve problems to involve the foreign investment and to establish lines

and equipment’s plants such as engineering infrastructure lines and

equipment etc. which are most important role to execute the

infrastructure.

PROPOSAL OF INVESTMENT

Page 25: Intro infrastructure project 2015.02.26

2. In recently, there has been using the solar energy power intensively,

especially geotherma, sun, wind, water solar power energy which are

using on the worldwide renewable energy . In order to decide the

infrastructure issues which are most virtual need to requirement in

Mongolia increasingly. In this regard, we are ready to joint work with the

business activities of foreign investors in this field to express their

willingness to cooperate with you.

Page 26: Intro infrastructure project 2015.02.26

We have confidence with you to cooperate the filed of infrastructure

which is to implement the policy of Mongolian government that is

increase housing supply, to support the manufacturing of construction

materials, based on the development of modern technology.

Page 27: Intro infrastructure project 2015.02.26

Thank you very much

for attention