78
Part I: Company Profile

Huayu tri pac

Embed Size (px)

Citation preview

Page 1: Huayu tri pac

Part I:

Company Profile

Page 2: Huayu tri pac

One of the largest enterprises of the steel structure engineering in

Southern China

Page 3: Huayu tri pac

Registered Address :Huanan Industrial Park, Liaobu, Dongguan

Registered Capital :RMB 50,000,000

Established in January 13, 1998, is a subsidiary company to Guangdong

MingCrown Group.

Annual turnover 400,000,000 RMB

150,000sqm of Light steel &Heavy steel fabrication area

Annual production capacities 60000ton

Present Staff 1100

Main Business Scope:Metal structure &Truss structure fabrication, installation,

Steel plant, logistics warehouse

Design of high-rise buildings & villa

Metal materials fabrication &sales

One of the largest enterprises of the steel structure engineering in

Southern China

Page 4: Huayu tri pac

◇ National Grade I qualification for steel structure job. Secondary

Grade qualification for special steel structure design.

◇ National Grade I qualification for steel structure manufacturing.

Singapore Grade A qualification for steel structure manufacturing.

◇ Light & heavy steel fabrication base, covering a area of 15,000m3.

◇ 8 light & Heavy H Beam production lines, 196 sets of equipment.

◇ 2 sandblasting lines, and 4 large scale enclosed sandblasting house.

Page 5: Huayu tri pac

Part II:

Capacity and Equipment

Page 6: Huayu tri pac

Large Production Scale

Sustainable Developing Capability

Total scale

Company Total area 150,000M2

Workshop area 43,000M2

Product stocking area 15,000M2

Sandblasting & Painting area 10,000M2

Facilities Equipment 196 sets

Certificates ISO Certificate ISO9001:2008

Production Capacities Annual Capacities 60,000ton

Page 7: Huayu tri pac

Advanced Manufacturing Equipments

1,Lifting Equipments

Gantry crane 1 unit

Overhead crane 30T 4 units

Overhead crane 20T 11 units

Overhead crane 10T 10 units

Overhead crane 5T 4 units

2,Processing Equipments

Shearing machine 4 units

Bending machine 2 units

Steel plateFlanging machine(4m) 1 unit

Sawing machine 3 units

Milling machine 4 units

Puching and shearing machine 2 units

Hydraulic punching machine 2 units

Self-control punching machine 160T 2 units

Mechanical press 4 units

Horizontal type press machine 300T 4 units

Pneumatic tapping machine 2 units

Beam drill 2 台

Numerical control laser cutting machine 1 unit

CNC drilling machine 2 units

CNC tailor 1 unit

3,Equipments for steel structure's fit up

H section fit up system 5 units

H section flattening system 5 units

Large edge miller 12M 2 units

Box column production line 1 unit

Vertical end-surface milling 1 unit

Numerical control multi-burner cutting machine

6 units

3D CNC drilling machine 1 unit

Consistent CNC cutting machine 1 unit

Plate flattening machine 1 unit

Tube coiling machine 1 unit

Plate coiling machine 1 unit

Manual operation sandblasting production line 2 units

Automatic sandblasting production line 2 units

Painting production line 1 unit

Semi-automatic submerged arc welding 6 units

Door type automatci welding 6 units

Argon arc welding 21units

CO2 welding 105units

AC welding machine 37units

DC welding machine 25units

Stud welding machine 1 unit

Electroslag welder 1 unit

Turning rolls 1 unit

The dryer of the welding machine and electrode 5 units

Compressor 2 units

Generator 2 units

4,Processing equipments for wall structure materials

C section steel production line 1 unit

Z section steel production line 1 unit

Chromatic Steel Sheet Production Line 6 units

Roof plate production line 1 unit

Sandwich board production line 1 unit

Purline machine 3 units

Page 8: Huayu tri pac

Workshop

Advanced Manufacturing Equipments

Page 9: Huayu tri pac

Gantry Crane

Advanced Manufacturing Equipments

Page 10: Huayu tri pac

< CNC Flaming Cutting

machine

Draw bender>

Advanced Manufacturing Equipments

Page 11: Huayu tri pac

Advanced Manufacturing Equipments

<5-D Consistent CNC

Cutting ( Pipe-Coaster)

Submerge Arc Welding

System>

Page 12: Huayu tri pac

End Section Milling

Machine>

<Edge Milling

Machine

Advanced Manufacturing Equipments

Page 13: Huayu tri pac

<Milling Machine

Pneumatic Tapping

Machine>

Advanced Manufacturing Equipments

Page 14: Huayu tri pac

CNC cutting machine>

<Digital controlled 3-D drill

Advanced Manufacturing Equipments

Page 15: Huayu tri pac

<Laser Cutting machine

Ausrichtmaschine >

Advanced Manufacturing Equipments

Page 16: Huayu tri pac

< C/Z Section

Production System

Roof Plate Production

System >

Advanced Manufacturing Equipments

Page 17: Huayu tri pac

< Sandblasting

System

Painting>

Advanced Manufacturing Equipments

Page 18: Huayu tri pac

<Band Sawing

3-D Drilling Machine>

Advanced Manufacturing Equipments

Page 19: Huayu tri pac

<Steel Structure Expert Visit

and Advise

GE Inspection >

Advanced Manufacturing Equipments

Page 20: Huayu tri pac

Part III:

Product & Projects Sample

Page 21: Huayu tri pac

The Fabrication of Build Steel Structure(multi-layer steel structure series)

Pip

eC

ross

Bo

xed

ste

el

Cro

ss

Page 22: Huayu tri pac

The Fabrication of Build Steel Structure(Heavy steel series)

Grid

colu

mn P

rofiled

beam

Cra

ne b

eam

Cro

ss c

olu

mn

Page 23: Huayu tri pac

The Fabrication of Build Steel Structure(Light steel series)

Colu

mn

Colu

mn

Bar

Purlin

Roof p

late

Plastic

win

dow

Page 24: Huayu tri pac

The Fabrication of Build Steel Structure(pipe& truss series products)

Square tube truss Circular pipe truss

H section steel truss Circlar pipe arc truss

Page 25: Huayu tri pac

The Fabrication of Build Steel Structure(bridge series)

Page 26: Huayu tri pac

Fabrication procedure 1 of T section of curtain wall steel structure

milling drilling tapping

Page 27: Huayu tri pac

Fabrication procedure 2 of T section of curtain wall steel structure

check straightness adjust the hole location cutting length

check coating thickness intermediate painting final coating

Page 28: Huayu tri pac

Fabrication procedure 3 of T section of curtain wall steel structure

Check

total th

ickness

Pack

ing lab

el Cover th

e box

Pack

ing

Page 29: Huayu tri pac

Pipe process 1 of curtain wall steel structure

Blasting Primer Cutting

Outside tapping Inside tapping Assemble

Page 30: Huayu tri pac

Assemble Pipe welding Formed weld

Primer Final coating Packing

Pipe process 1 of curtain wall steel structure 2

Page 31: Huayu tri pac

Process 1 of welded boxed pipe

Install CJP backing Boxed beam assemble

CJP welding Rectify after welding Milling process

Page 32: Huayu tri pac

CJP NDT checking Pre-assemble Visual finishing

Painting Packing Delivery

Process 2 of welded boxed pipe

Page 33: Huayu tri pac

Galvanized item packing

Galv

anized

items P

ackin

g

Pack

ing L

abel

Page 34: Huayu tri pac

HY-830 color board

HY-PC Lighting board

HY-900 color board

HY-FRP830 lighting board

HY-EPS sandwich roof board

HY-688 Floor board HY-373 Hidden Style Wall

HY-EPS sandwich wall board

HY-FRP 380 lighting board HY-475 Roof board

Materials of containment system 1

Page 35: Huayu tri pac

Materials of containment system 2

HY-430 hidden Roof board

Page 36: Huayu tri pac

Architectural Structure Projects (Net frame structure)

Truss Structure Project of Youyi supermarket at southern part of Dongcheng District

Diameter:65.2m Project Feature :Shell-shaped networked framework

Page 37: Huayu tri pac

Architectural Structure Projects(Truss structure)

Zhongshan exposition center Area:21384M2 Feature:pipe truss structure

Page 38: Huayu tri pac

Shooting range for the Asian Games (Guangzhou flying disk training center)

Construction: 12260M2

Architectural Structure Projects(Truss structure)

Page 39: Huayu tri pac

Architectural Structure Projects(Truss structure)

XuWen gymnasium Construction Feature:The canopy is the steel structure, covered steel

purlin, steel roof panel systems. Canopy steel structure is space frame system, space size is

cutting oblique elliptic cylinder, and plane projection is the lunate shape.

Page 40: Huayu tri pac

GuangDong daye motor technical co.,ltd Area:60000M2 Construction feature:80M single

slope without connection roof.

Architectural Structure Projects(Light steel structure)

Page 41: Huayu tri pac

Invista fibie (foshan) Co., Ltd. Architectural Characteristics: Six completely steel

structure plant

Architectural Structure Projects(Light steel structure)

Page 42: Huayu tri pac

Guangdong Huaguan steel jiangmen new factory Architectural Characteristics: Bridge

Crane 50t~100t

Architectural Structure Projects(Light steel structure)

Page 43: Huayu tri pac

Lian zhong stainless steel plant (second period) Area:62000 M2 Feature: 100T crane heavy steel

structure

Architectural Structure Projects(Heavy steel structure)

Page 44: Huayu tri pac

China Longxue shipbuilding basement project Area:15000 M2 construction feature:large-span、grid

type heavy steel plant

Architectural Structure Projects(Heavy steel structure)

Page 45: Huayu tri pac

Architectural Structure Projects(Heavy steel structure)

Brunei Imperial Navy Base Repair Factory Steel consumption: 5450 T Architectural Characteristics: Mainly combining by the section steel, with structure type of lattice truss,gantry steel frame, main features: high space, large span。

Page 46: Huayu tri pac

Wuhan sentosa mansion Architectural Characteristics:Concrete filled steel tubular

structure (28 floor)

Architectural Structure Projects(Multi-layer structure)

Page 47: Huayu tri pac

Architectural Structure Projects(Multi-layer structure)

Guangdong GoTone building (New address) Construction Area: 140000M2

Architectural Characteristics: 41 layer, box type, beam, and column

Page 48: Huayu tri pac

Architectural Structure Projects(Multi-layer structure)

Pearl River New Town Project Construction Area: 440000M2

Architectural Characteristics: Building structure use concrete filled steel tube huge oblique lattice outer cylinder and the reinforced concrete shear wall structure system.

Page 49: Huayu tri pac

Guangzhou express bus(BRT)pedestrian bridge. Feature:arc boxed structure

Architectural Structure Projects(bridge)

Page 50: Huayu tri pac

Shenzhen Guangming Gaoxin technical industrial park of administration overbridge

Architectural Structure Projects(bridge)

Page 51: Huayu tri pac

Singapore MBS project Feature:complicated curtain wall steel structure

Curtain wall main steel structure projects

Page 52: Huayu tri pac

CCRC Project Curtain wall area nearly 60,000M2 which main is frame glass curtain wall.

Curtain wall main steel structure projects

Page 53: Huayu tri pac

Curtain wall main steel structure projectsSingapore Sentosa project Feature:Curtain wall steel structure are pipe purlin, bent steel bearing, package arc main structure beam ,angle steel ,frames and so on. As the monolithic structure is two-way curved surface’s,so every purlin’s steel bearing bending angle is different, steel bearing qty here are more than 1000pcs.

Page 54: Huayu tri pac

Tobacco Mansion of ZhuJiang District in Guangzhou

Project feature: The whole project is about 210 thousands square meter ,curtain wall part is about

90 thousands square meter, main building is steel structure and Steel concrete composite structure.

Curtain wall main steel structure projects

Page 55: Huayu tri pac

Dongguan Forest Lake, Lanxi Valley Project Architectural Characteristics: Environmental leaves club, attractive appearance , complex spatial structure, a twisted type, the mainstay is the steel wall; The primary member ,the box beam is twisted component, the main part is steel structure roof

Curtain wall main steel structure projects

Page 56: Huayu tri pac

Equipment steel structure projectsFabrication of GE generate component

GE finished pulse filter house component Exhaust Duct

GE Semi-circle component of finished package

GE Finished large-scale component

GE Cone componentGE power plant equipmentGE power plant equipment

Page 57: Huayu tri pac

Equipment steel structure projectsFabrication & Pre-assemble of GE large-scale generator

Page 58: Huayu tri pac

Equipment steel structure projectsDelivery process of GE generate component

Page 59: Huayu tri pac

Equipment steel structure projectsALSTOM large-scale generate electricity equipment

Page 60: Huayu tri pac

Equipment steel structure projectsSIEMENS large-scale generate electricity equipment

Page 61: Huayu tri pac

Equipment steel structure projects & fabrication processNan hai generator equipment

Page 62: Huayu tri pac

Equipment steel structure projects & fabrication processXingsheng machine walking set of offload machine

Page 63: Huayu tri pac

Equipment steel structure projects & fabrication processCuntian project mechanical equipment platform

Page 64: Huayu tri pac

Equipment steel structure projects & fabrication processChemical plant、oil、coal mine equipment platform

Page 65: Huayu tri pac

Part IV

Staff Status

Page 66: Huayu tri pac

Staff Status

■ Total 1150, Inc.

■ Lead Civil / Structural / Architectural Engineer 2

■ Junior and Senior engineer 25( 2 Professional Specialist)

■ National First-grade & Secondary-grade Registered Construction Engineer 8

■ Personnel for Managing (Inc. for Design, Procedure control, QA, Site

Operation managing)About 154

■ Welder 290

■ fitters 280

■ Operator in Other Workplace 359

■ Quality Inspector 32

Page 67: Huayu tri pac

Production Capability

NO Product Description Staff Output per Month Remark

1 Equipment Structure 283 300T Equipment Structure

2 light steel structure 72 900T~1,200T Ordinary factory structure

3 Heavy steel structure (1) 116 900T Vary as per welding requirement

4 Heavy steel structure (2) 109 600T~900T Cross beam, box column structure

5 Pipe truss structure 39 900T Vary as per pipe size

6 H beam truss structure 63 1,100T Ordinary factory structure

7 Color Steel Sheet 5 60,000 M

8 C section 3 27,000 M

9 Z section 3 36,000 M

10 Roof plate 3 45,000 M

Page 68: Huayu tri pac

Part V

Company Qualification

Page 69: Huayu tri pac

Qualification

●工商营业执照●钢结构专业承包壹级资质●钢结构制造壹级资质●钢结构专项设计乙级资质●新加坡钢结构制造S1级●ISO9001:2008认证企业●道路运输经营许可证●质量、服务、信誉AAA级企业●中国建筑金属结构协会会员●广东省空间结构协会理事单位●国税、地税登记证●安全生产许可证书●组织机构代码证●中国质量服务诚信单位●卫生许可证●进出口资格证书●商标注册证●消防合格证

● Industrial and commercial business license

● Steel Professional Contract of Grade 1 Qualification

● Steel Structure Manufacturing of Grad 1 Qualification

● Grade B qualification of Special design for steel structure

● S1 Qualification for Singapore Steel Structure Manufacturing

● ISO9001: 2008 Certified Company

● Road transport operation license

● Quality, Service, Reputation AAA level enterprise

● Member of China Construction Metal Structure Association

● Guangdong Provincial Association unit of spatial structure

● Tax, Land tax registration certificate

● Safety Production License

● Organization Code Certificate

● China Quality Service Integrity Unit

● Health License

● Import and Export Certificate

● Trademark Registration certificate

● Fire safety certificate

Page 70: Huayu tri pac

Qualification

Page 71: Huayu tri pac

Part VI:

Workshop Layout and Quality

Control Procedure

Page 72: Huayu tri pac

■Contract Valuation

Design Ability

Procurement Ability

Production capacity

equipment,

Quality control,

Installation.

Stocking capacity

Resource Allocation

. . .

■project management

drawings Design,

Materials Procurement,

Production Process,

Production schedule,

Product shipments,

Quality Problems,

Communication and

co-ordination between

departments,

communication and

co-ordination with

Client

. . .

Customer Feedback collection

Analysis

Improvement planning

feasibility

Action

Effect Assessment

■Customer’ Feedback

Customer Management

Page 73: Huayu tri pac

Production

procedure

To Create

As Per

“Material Preparation Desgin"

"Steel Construction Quality

Acceptance Standards"

GB50205-2001

welding instructions

Cutting instructions

Fit-up & Flattening instructions

Assembly instructions

Sandblasting instructions

....

Production

procedure

Page 74: Huayu tri pac

Raw materials

(supplies)

Quality Inspection

Production

process

Quality

Inspection

FG

Quality

Inspection

Suppliers

YES

NG

YES

YES

YES

YES

YES

YES

YES

YES

Rework

and

repairYES

Raw materials

(supplies)

Warehousing

Blanking

Group legislature,

and correct

Riveting

Assembly

Welding

Surface

Treatment

Painting

Finished

warehousing

Product

shipments

NGScrapped

Engineering

Installation

Quality Inspection

After Installation

Inspect as per

“Material Preparation Desgin"

"Process operating guidelines"

“Incoming Mat. Test Regulation"

“Inspect.. regulation during fabrication"

"Final Inspect. regulation"

"Steel Construction

Quality Acceptance

Standards" GB50205-

2001

Quality Control Procedures

Page 75: Huayu tri pac

Workshop Layout

Page 76: Huayu tri pac

Convenient Transportation

Huangpu

Port

HUAYU STEEL

Shekou

Port

Note: 1) The Company from Dongguan Humen port about 40 km, 30 minutes by car;

2) The Company from Shenzhen Yantian Port mouth about 80 km, 60 minutes by car;

3) The Company from Guangzhou Huangpu port about 90 km, 70 minutes by car;

4) The Company from Jiangmen the new port about 160 kilometers, the journey 120 minutes.

Page 77: Huayu tri pac

Huangpu

Port

HUAYU STEEL

Page 78: Huayu tri pac

Thank you !