EL GUETITI ANOUAR
Electrically Flushing System
TUNISIA
PROBLEMATICDomestic
water consump
tion
Flushing 40%
Water leaksFrequent
breakdowns
Water Flush
Breakdowns are frequent in flushing consist of gravity tank
flushing mechanism sensitive to mishandling
faulty control
Water flush with concealed cistern
The Electrically Flushing System
Collective configuration
( collective toilet )
Individual configuration
( private toilet )
Model of a collective installation
Click for Youtube Link
Model of a individual installation
Click for Youtube Link
Characteristics of our electrically flushing system
Electric control
No direct contact with
userReducing
breakdowns
Characteristics of our electrically flushing system
Significant flushing effect
Volume of water discharged
controllable
+ Water saving
Others characteritics
No noise when filling the pressure tank
Elaminates bad odors
Suitables for hospitals and
hotels
Market
Individual system
TARGET MARKETSmall and medium water consumer
(Households, coffee, High standing hotels,public areas, etc)
Nb : 200.000
BEACHHEAD MARKETCoffee ; offices;Nb ≈ 15.000
REFERENCES
Water bills was reduced and no complain until today
Establishment Type Region Date Nb of flushes
TFM Factory Ben Arous March - 2012 8
PAF Factory Radès July- 2012 8
Carhago Céramic Factoy Aagareb Dec – 2012 16
MKS Factory Ksar Said April –2013 3
Official printing Public Radès June –2014 46
COFICAB Factory Medjez El bab May –2015 2
Fashion Square Factory Sousse August –2015 7
Hbib Thameur School
Public School
Soliman Sept –2015 4
Conducting a collective installation
Click for Youtube Link
janv.-14 févr.-14 mars-14 avr.-14 mai-14 juin-14 juil.-14 août-14 sept.-14 oct.-14 nov.-140
200
400
600
800
1000
1200
1400
1190 1169
979
1142
749
595
513
382
475
389 381
Evolution of mensuel water cosumption in Officiel printing (m3)
Beginning of Installation
46 flushs were installed
Reduction : 60%
Prototyping of individual flushing system
Economic study for the first year
Individual water flush
Strategy :Subcontracting components
Assembly Line
1000 units in the first year
83 K€
Renting a room for storage and
assembly4 K €
Components of the flush62 K €
Workforce10 K€
Utilities (water, electricity,
etc.)2 K €
Various5 K €
Investments for 1000 units of Ind Flushing system
Profits in the first year
SALES130 K€
INVESTMENTS83 K€
GAIN47 K€
PERPECTIVES
1 •Industrialization individual configuration : households, public areas, and offices.
2 •Continue the distribution of the collective system
3 •In the long term: Extension in Europe and Arab Countries.