SUMMER TRAINING REPORT ON DIESEL LOCOMOTIVE WORKS VARANASI

Page 2: DLW   training  PPT

Submitted to :-MA-NIT BHOPAL

Submitted by :- Eshver chandra

Page 3: DLW   training  PPT

INTRODUCTION

- Diesel electric locomotives were introduced on Indian railway in 1950's. - Diesel Locomotive Works ( DLW ) was established in 1961 in collaboration with M/s ALCO, USA in the ancient city of Varanasi. It is spread in 300 acres area at Varanasi.

- it is a production unit owned by Indian railway, for which it manufacturers diesel -electric locomotive and its spare parts.

- DLW is an ISO 9001:2008, ISO 14001:2004 and OHSAS 18001: 2007 Certified organization.

Page 4: DLW   training  PPT

Specification of electric locomotive -DLW's annual Production - 25 - Cost of one loco - 12 to 14 crore (EMD) - 8 crore (ALCO) - Weight of one loco - 121 ton - Fuel consumption; full load - 540 ltr/hr. Idle load - 40 ltr/hr. - Max. Speed - 160 Km/hr. - Dia. of wheel - 1092 mm - Wheel to wheel distance - 1596.5 mm - Length of under frame - 19962 mm

Page 5: DLW   training  PPT

Diesel electric locomotive In a diesel - electric locomotive, the diesel engine drives an electrical generator or alternator whose output provides power to the traction motors. There is no Mechanical connection between the engine and the wheels.

Page 6: DLW   training  PPT

Products of DLW

WDG-5 - High adhesion Diesel-electric 5500 HP main line heavy goods service locomotive, with GM ( AC-AC traction)

WDG-4D - High adhesion Diesel-electric 4500 HP main line heavy goods service locomotive, with GM ( AC-AC traction)

Page 7: DLW   training  PPT

WDP-4D - High adhesion Diesel-electric 4500 HP main line heavy passenger service locomotive, with GM ( AC - AC traction)

WDG3A - 3100 HP main line heavy goods service locomotive, with uprated 16 cylinder ALCO engine ( AC -DC traction )

Page 8: DLW   training  PPT

Divisions in DLW There are more than 50 shop in DLW for several operation , some of which are listed below in three major category .. 1. Block Division 2. Engine Division 3. Loco Division

1. BLOCK DIVISION

Heavy weld shop Heavy Machine shop Heavy metal shop

Page 9: DLW   training  PPT

2. ENGINE DIVISION

Engine erection shop (EES) Engine testing shop (ET) Light Machine shop (LMS) Sub Assembly shop (SAS) Heat treatment shop (HTS) Turbo section shop (TSS) Rotor shop Fitting shop

Page 10: DLW   training  PPT

3. LOCO DIVISION

Loco Frame shop (LFS) Pipe shop (PS1) Truck and Machine shop (TMS) Traction Assembly shop ( TAS) Sheet Metal shop (SMS) Loco Assembly shop ( LAS) Loco Paint shop ( LPS) Loco Test shop (LTS)

Page 11: DLW   training  PPT

EES (Engine erection shop )Assembly of the major component of the

locomotive engine 1. Lube oil container ( base ) 2. Crankshaft and crankcase

3. Governor and double fuel filter 4. Strainer 5. Double water circulator 6. Flywheel 7. OST shaft 8. Rocker arm 9. Alternator 10. Turbo super charger

Page 12: DLW   training  PPT

CRANKSHAFT

Page 13: DLW   training  PPT
Page 14: DLW   training  PPT

ETS ( Engine Testing shop )In this shop testing of the engine performed

1. Initial filling of the lube oil and fuel 2. Observation of the vibration 3. Sensing and controlling the temperature 4. Controlling the pressure 5. soak valve pump 6 . Circulation of water and sensing of temperature 7. Initial supply of the 72 V for starting

Page 15: DLW   training  PPT
Page 16: DLW   training  PPT

LAS (Locomotive assembly shop )Assembly of the major component of the locomotive on the

locomotive frame 1. Driver cabin 2. Fins , cooler and fan 3. Rack positioning 4. Water circulation tube and tank 5 . Major lube oil filter 6. Governor system 7. Engine assembly 8 . Alternator and auxiliary generator 9. Air filter and blower 10 . ECC 1, ECC 2.

Page 17: DLW   training  PPT

Auxiliary generator

Page 18: DLW   training  PPT

Rack arrangement

Page 19: DLW   training  PPT
Page 20: DLW   training  PPT

LTS ( Loco assembly shop)Testing of the final locomotive on the basis of

several performance

1. Initial filling of lube oil ( approx 4200 ltr)2. Filling of all fuel ( approx 3000 ltr) 3. Load testing 4. Testing of MR1 and MR2 5. Air brake testing 6. Water circuit check 7. Testing of dynamic brake