63
2 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary Ron Prychitko, P.Eng. Regional Engineer Prairies Armtec, Drainage Solutions Lorne Mielty Technical Sales Representative Western Armtec, Drainage Solutions CORRUGATED STEEL BRIDGE & TUNNEL SOLUTIONS FRIDAY MAY 8 TH, 2015 / 9AM PST / 11AM CST / 12PM EST AN OVERVIEW

Corrugated Steel Bridge and Tunnel Solutions

  • Upload
    armtec

  • View
    154

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Corrugated Steel Bridge and Tunnel Solutions

2

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Ron Prychitko,P.Eng.

Regional EngineerPrairies

Armtec, Drainage Solutions

Lorne Mielty

Technical Sales Representative

Western

Armtec, Drainage Solutions

CORRUGATED STEEL BRIDGE & TUNNEL SOLUTIONS

FRIDAY MAY 8 TH, 2015 / 9AM PST / 11AM CST / 12PM EST

AN OVERVIEW

Page 2: Corrugated Steel Bridge and Tunnel Solutions

5

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

CPD CREDIT CERTIFICATES

• CPD Credit Certificates will be given out for attending Live Webinars• Qualifies in Most Jurisdictions in Canada & USA for 1 Hour Technical

Informal• Formal completion certificates are emailed within one week of attending• Check your local guidelines if unsure of your requirements

Email your complete attendee list should there be multiple individuals viewing the same screen.:

• Full Name• Title• Email

[email protected]

Armtec will send certificate to all participants

Page 3: Corrugated Steel Bridge and Tunnel Solutions

6

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Armtec is one of Canada’s largest infrastructure company supplying precast, corrugated steel and HDPE products and solutions. Every day, our proven products, engineered solutions and dedicated people are counted on to support construction and infrastructure projects in communities everywhere. With a national presence and a local focus on exceptional customer service, we are dedicated to building excellence.

ABOUT ARMTEC

Page 4: Corrugated Steel Bridge and Tunnel Solutions

12

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

YOUR SPEAKERS

Ron Prychitko P.Eng.Region Engineer

Armtec, Drainage Solutions

[email protected]

Lorne MieltyTechnical Sales Representative,

Armtec, Drainage Solutions

[email protected]

Page 5: Corrugated Steel Bridge and Tunnel Solutions

13

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

AGENDA

• Introduction of Shallow & Deep Corrugated Plates

• Coatings for Durability

• Case Study Projects

• Benefits of Corrugated Plate Structures

• Questions

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 6: Corrugated Steel Bridge and Tunnel Solutions

14

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Multi-Plate (SPCSP)(152 mm x 51 mm)Bridge-Plate (DCSP)

(400 mm x 150 mm)

STRUCTURAL PLATE - CORRUGATIONS

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 7: Corrugated Steel Bridge and Tunnel Solutions

15

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

MULTI-PLATE

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS Dia. / Span - 1.5 m to 7 m

Design & Installation • CAN/CSA S6-14 – Section 7 Buried Structures• Referred to as “Shallow Corrugations”

Page 8: Corrugated Steel Bridge and Tunnel Solutions

16

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Box Culverts• Spans - 4m to 14m • Highway Loading• Low Cover Applications

BRIDGE-PLATE

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Design & Installation• CAN/CSA S6-14 – Section 7 Buried Structures• Referred to as “Deep Corrugations”

Arches

• Spans 6m to 21m

• Single Radius + Low & High Profile shapes

Rounds• Diameters – 6m to 15m• Horiz. Ellipse shapes

also available

Page 9: Corrugated Steel Bridge and Tunnel Solutions

17

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

CAT – “CORROSION ARRESTING TECHNOLOGY”

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

WHAT IS STRATA-CAT COATING?

Page 10: Corrugated Steel Bridge and Tunnel Solutions

18

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

STRATA-CAT COATING PROCESS

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 11: Corrugated Steel Bridge and Tunnel Solutions

19

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

STRATA-CAT - R & D

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Example test site

Page 12: Corrugated Steel Bridge and Tunnel Solutions

20

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

STRATA-CAT - INVERT PROTECTION

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Multi-Plate

• Location: Route 158 Mirabel QC • Features: 5540 Diameter Round

• Location: Essex County ON• Features: 5.05m Span x 3.33 Rise Pipe

Arch Shape

Page 13: Corrugated Steel Bridge and Tunnel Solutions

21

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PERFORMANCE GUIDELINE BURIED STEEL PLATE STRUCTURES

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONSwww.cspi.ca

Page 14: Corrugated Steel Bridge and Tunnel Solutions

22

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Corrugated Steel Pipe Products

Materials, Fabrication, Inspection & Repair ……. • Helical Pipe Products (CSP & SRP)• Structural Plate Products (SPCSP, DCSP, Liner Plate)• Coatings

• Galv. & Aluminized (metallic) • Polymer Coating

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

CSA STANDARD - G401-14

Page 15: Corrugated Steel Bridge and Tunnel Solutions

23

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

BRIDGE-PLATE BOX CULVERT

• Location: Muskoka Road 50, ON• Product: Armtec 34H Bridge-Plate box culvert w/ Polymer coated side plates• Dimensions: 12000 span x 2800 rise x 18m long

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 16: Corrugated Steel Bridge and Tunnel Solutions

24

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

BRIDGE REPLACEMENT – MUSKOKA RD 50

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 17: Corrugated Steel Bridge and Tunnel Solutions

25

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

T - SHAPED FOOTINGS

• Scour Protection• Elevate Plate above Streambed• Cast-in-Place or Precast

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 18: Corrugated Steel Bridge and Tunnel Solutions

26

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

GRANT BROOK, NS

Products used: • 5180 Span x 2690 Rise Multi-Plate single radius Arch c/w MSE wire mesh

Headwalls• Installed on T-Shaped cast-in-place footings• Polymer coated plates to above HWL

Page 19: Corrugated Steel Bridge and Tunnel Solutions

27

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PETOPEKO CREEK – BLOODVEIN, MBEAST SIDE ROAD

Page 20: Corrugated Steel Bridge and Tunnel Solutions

28

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Read Creek – MacArthur River Mine SK

Bridge Plate LP Arch

Page 21: Corrugated Steel Bridge and Tunnel Solutions

29

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

You don’t even know you are travelling over a Bridge

Page 22: Corrugated Steel Bridge and Tunnel Solutions

30

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

ST-LIBOIRE, QC (MTQ)

• HORIZONTAL ELLIPSE MULTI-PLATE 7460 SPAN X 4460 RISE (20.117 M LONG) POLYMER COATED PLATE

• C/W 33 DEG SKEW CUT ENDS, • CAST-IN-PLACE HEADWALLS

Page 23: Corrugated Steel Bridge and Tunnel Solutions

31

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

CANAL CROSSING APPLICATIONS

• Location: Blackstrap Lake, Sask. • Product used: 48N Horizontal Ellipse Multi-Plate 4430 span x 2800 Rise (42 m long)

polymer coated c/w square ends

Page 24: Corrugated Steel Bridge and Tunnel Solutions

32

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

• Conception Bay North Bypass & Lady Lake Road

ARCH – TUNNEL (LOCAL ROAD) UNDERPASS

• TCH & Long Harbour Road Interchange

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

• 11.6m Span x 6.5 Rise Bridge-Plate Arches

Page 25: Corrugated Steel Bridge and Tunnel Solutions

33

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

BRIDGE-PLATE ROUND – RAILWAY BRIDGE

• Twin – 9050 diameter Round Bridge-Plates x 19.3m long

• Ironstone River• E90 Railway Live Load• Invert Bury 2.0 m• Near Labrador City, Labrador

• 6610 Bridge-Plate x 72m long• E80 Railway Live Load• Rail Terminal Facility• Hardisty, Alberta

Page 26: Corrugated Steel Bridge and Tunnel Solutions

34

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

MAPLE CREEK SK - TRANS-CAN HWY #1

Page 27: Corrugated Steel Bridge and Tunnel Solutions

35

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Product: Bridge-Plate Low Profile Arch 11740 mm span x 110.5 m long – c/w full Raft footing (Stage Constructed)

MAPLE CREEK, SK

Page 28: Corrugated Steel Bridge and Tunnel Solutions

36

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

THUNDER BAY, ON – BELROSE RD.

Before

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 29: Corrugated Steel Bridge and Tunnel Solutions

37

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

THUNDER BAY, ON – BELROSE RD

After

Page 30: Corrugated Steel Bridge and Tunnel Solutions

38

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

SHEPPARD LANDFILL

Calgary AB - 68th Street SE

6100 x 1400 Bridge-Plate Box Culvert

38

Page 31: Corrugated Steel Bridge and Tunnel Solutions

39

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

LINER PLATE

• Lightweight Bolted Segmental Plate

• Circumferential flanges allow assembly from the inside

• Application - Relining drainage pipe & water crossing structures

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 32: Corrugated Steel Bridge and Tunnel Solutions

40

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

CAPE BRETON RAIL BRIDGE REHABILITATION

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 33: Corrugated Steel Bridge and Tunnel Solutions

41

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

TUNNEL LINER PLATE

Custom shapes for Relines

Page 34: Corrugated Steel Bridge and Tunnel Solutions

42

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

ALUMINUM BOX CULVERT

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

OLD PERLICAN, NL –ALUMINUM BOX CULVERT – C/W FULL INVERT - 6286 SPAN X 1614 RISE x 12344 long

Page 35: Corrugated Steel Bridge and Tunnel Solutions

43

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

ALUMINUM BOX CULVERT

OLD PERLICAN, NL – ALUMINUM BOX CULVERT –C/W FULL INVERT - 6286 SPAN X 1614 RISE x 12344 long

Page 36: Corrugated Steel Bridge and Tunnel Solutions

44

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

ALUMINUM BOX CULVERTS

COUNTY OF WETASKIWIN, ALBERTA

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Pipestone Creek Before

Page 37: Corrugated Steel Bridge and Tunnel Solutions

45

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

ALUMINUM BOX CULVERTS

COUNTY OF WETASKIWIN, ALBERTA

Wetaskiwin, AB – Aluminum Box Culvert (Series #140) – 35 ft. span x 11 ft. rise - 58’-9” long c/w full invert (scour Protection Plates) and full headwall / wingwall Package

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 38: Corrugated Steel Bridge and Tunnel Solutions

46

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Address Forces due to:• Hydraulic Uplift• Erosion / undermining• Piping thru the backfill

BRIDGE CULVERT END TREATMENTS ARE

ESSENTIAL

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Piping

Erosion

HydraulicUplift

Page 39: Corrugated Steel Bridge and Tunnel Solutions

47

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

END TREATMENT EXAMPLES

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 40: Corrugated Steel Bridge and Tunnel Solutions

48

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PENNASK CREEK - KELOWNA, BC

Owner: BC MOTI

Consultant: Associated Engineering

Contractor: PW Trenchless

Location: Pennask Tributary Creek, 50km outside of Kelowna, BC along Highway 97C

Existing Culvert:

2440mm Span x 1739mm Rise Galvanized Multi-Plate pipe arch

Rehabilitated Culvert:• 2046 mm x 1538 mm rise x 97m length• 4.0mm crown plates x 6mm bottom plates• Strata-CAT® polymer-coated

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 41: Corrugated Steel Bridge and Tunnel Solutions

49

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PENNASK CREEK - KELOWNA, BC

Challenges & Constraints

• Restore structural capacity of the culvert

• Approximately 30m surcharge

• 75+ year service life

• Timeline – difficult winter conditions

• Major highway

• Max. water velocity 3.0 m/sec with sand and gravel bedloads

• Acidic drain rock

• Water inside conduit: • Leachate from acidic surcharge

around conduit/groutCORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 42: Corrugated Steel Bridge and Tunnel Solutions

50

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PENNASK CREEK - KELOWNA, BC

Page 43: Corrugated Steel Bridge and Tunnel Solutions

51

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

DICK BOOTH CROSSING - HWY 4 PORT HARDY, BC

Owner: BC MOTI & MFLNRO

Consultants: • Onsite Engineering (Engineers of Record)• Terratech Consulting (GRS) • Pacificus Biological Services Ltd.

(Environmental Monitoring)• Levelton Consultants Ltd (Quality Control)

Contractors: • PW Trenchless• Newcastle Structures (SPCPS and Concrete)• West Bridge Corp. (Removal of Acrow Bridge)• LC Stoneworks Ltd. (Installation Lock + Load)

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Project Description:• Access to the community of Holberg, BC was cut during a rain event in which 300mm

of rain fell in a 24 hour period and washed away a 2.0m CSP• BC MoTI quickly installed a temporary single lane bridge to re-open the road and

maintain essential services.

Page 44: Corrugated Steel Bridge and Tunnel Solutions

52

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

DICK BOOTH CROSSING - HWY 4 PORT HARDY, BC

Issues:• Water infiltration through

the embankment was a concern

• Bedrock was relatively

close to the surface

• Implied subsurface erosion

was likely, due to piping (percolation of water along the bedrock surface).

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Resolution:• Impervious cast-in-place concrete cut-off wall was anchored into the bedrock. • Cut-off wall ensured the water takes the path of least resistance – through the Multi-

Plate structure

Page 45: Corrugated Steel Bridge and Tunnel Solutions

53

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

DICK BOOTH CROSSING - HWY 4 PORT HARDY, BC

Multi-Plate used:• Multi Plate® c/w Strata-Cat® polymer

coating• Corrugation = 152mm x 51mm• 4.920m dia x 4.0mm width x 25.28m length

Project Materials Supplied by Armtec• Multi Plate® c/w Strata-Cat® polymer

coating• Lock + Load retaining wall• GRS Basket• Geotextile• W-Beam Guardrail

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 46: Corrugated Steel Bridge and Tunnel Solutions

54

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PARKDALE CREEK – LANGFORD, BC

Project description:• Parkdale Creek is an environmentally sensitive fish-bearing stream that meanders

through the heart of the Westhills subdivision.

• In order to join the two halves of the neighborhood it required a structure that would span the creek in an aesthetic and environmentally friendly way.

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 47: Corrugated Steel Bridge and Tunnel Solutions

55

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PARKDALE CREEK – LANGFORD, BC

Structure description:• Bridge-Plate® arch structure

• 12.0m span x 5.948m rise x 36.0m long

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

• Entire assembly only required eight days.

• Assembly crew preassembled complete rings of the arch in a staging area while the skew collar & footing designs were completed.

Page 48: Corrugated Steel Bridge and Tunnel Solutions

56

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

PARKDALE CREEK – LANGFORD, BC

Project description:• This project incorporated a green wall system that used Mirafi 5XT uniaxial geogrid

reinforcement.

Page 49: Corrugated Steel Bridge and Tunnel Solutions

57

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

THOMPSON’S CREEK - HOUSTON BC

Existing structure:• 2 x 900mm dia. CSP• 1 x 600mm dia. CSP• Constricting a 4.2m creek channel

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Replacement structure:• 7.0m span x 24m long open bottom

arch.

Page 50: Corrugated Steel Bridge and Tunnel Solutions

58

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

THOMPSON’S CREEK - HOUSTON BC

Project success:• Project has restored fish access to over five kilometers of high value spawning and

rearing habitat in the Thompson Creek mainstream• A further estimated two kilometers of habitat in four smaller tributary streams located

upstream of the Yellowhead Highway 16 also have restored fish access.

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 51: Corrugated Steel Bridge and Tunnel Solutions

59

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

KLUSKUS ROAD - VANDERHOOF, BC

Project description:• Road re-alignment project. Structure needed to be outside the wetted perimeter of the

creek as this is a fish bearing stream.

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 52: Corrugated Steel Bridge and Tunnel Solutions

60

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

KLUSKUS ROAD - VANDERHOOF, BC

Solution:• 15 metre span, 7.4m rise Bridge-Plate®• Single Radius Arch• 5mm thick throughout• Concrete footing/headwall – Designed

by McElhanney • Bin-wall – Design A,B,C

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 53: Corrugated Steel Bridge and Tunnel Solutions

61

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

HIGHLAND VALLEY COPPER MINE - BC

Owner: Teck Highland Valley Copper Partnership

Consultants: • Sade Engineering Associates

Limited• Terratech Consulting Limited

Contractors: • Newport Structures Limited • TLC Stoneworks Limited

Project Challenges: • Winter construction on a 24 / 7

schedule to avoid frozen backfill. • Temperatures as low as -25C.

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 54: Corrugated Steel Bridge and Tunnel Solutions

62

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

HIGHLAND VALLEY COPPER MINE - BC

Solution Specifications: • The Bridge-Plate two-radius arch design parameters were:

Span = 15.0 m, Rise = 6.7 m, Length = 58.9 m• 8.0 mm thick corrugated plate• Minimum Cover = 3.0 m• Maximum Cover = 9.1 m

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 55: Corrugated Steel Bridge and Tunnel Solutions

63

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

HIGHLAND VALLEY COPPER MINE - BC

Solution Characteristics: • Mine haul truck overpass• 1,400,000-lb. loaded CAT 797• Structurally efficient design

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 56: Corrugated Steel Bridge and Tunnel Solutions

64

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

BENEFITS OF CORRUGATED STRUCTURAL STEEL PLATE PRODUCTS

• Customized shapes to fit the application• Cost efficient

• Low life cycle cost• Economically shipped to remote

locations • Ease of installation w/o large cranes

• Less design & construction time is required• Can be designed for a wide range of loading

conditionsa) Deep buryb) Heavy Live Loads (haul trucks, track

vehicles)c) Typically have reserve capacity for

overload conditionsd) Seismic forces

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

Page 57: Corrugated Steel Bridge and Tunnel Solutions

65

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

• Eliminates bridge decks & icy deck problems

• Eliminates maintenance of bridge approaches

• Permits the use of a constant roadway section in the vicinity of the structure

• Roadway extension can be easily accommodated

• Cost Effective

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

BENEFITS OF CORRUGATED STRUCTURAL STEEL PLATE PRODUCTS

Page 58: Corrugated Steel Bridge and Tunnel Solutions

66

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

DESIGN CONSIDERATIONS

CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS

• Culvert Sizing (clearance & hydraulics)• Culvert Durability• Alignment & culvert location• End treatment • Environmental Impact Mitigation

Page 59: Corrugated Steel Bridge and Tunnel Solutions

67

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Contact Your Local Sales Rep:www.armtec.com/sales-offices/

Todays Speakers:

Ron Prychitko

[email protected]

Lorne Mielty

[email protected]

Page 60: Corrugated Steel Bridge and Tunnel Solutions

68

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

UPCOMING WEBINARS

Stay connected or get involved with Armtec events. We are dedicated to the continuing education of our customers, colleagues and fellow employees through personalized lunch and learns and free online webinars.

For more info please visit www.armtec.com/events

Page 61: Corrugated Steel Bridge and Tunnel Solutions

69

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Follow us on social media to learn more about our company, projects and people, while getting all the latest Armtec and industry news.

Webinars will be posted with in five business days from the broadcast date. We will notify all subscribers over our social media channels.

Today’s session will be available on YouTube and SlideShare

JOIN US ON SOCIAL MEDIA!

Page 62: Corrugated Steel Bridge and Tunnel Solutions

71

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Corrugated Steel Bridge and Tunnel Solutions

QUESTIONS?

Page 63: Corrugated Steel Bridge and Tunnel Solutions

72

© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary

Contact Your Local Sales Rep:www.armtec.com/sales-offices/

Todays Speakers:

Ron Prychitko

[email protected]

Lorne Mielty

[email protected]