18
LONG BEACH CITY COLLEGE DISTRICT WIDE SECURITY CAMERA IMPLEMENTATION BEST PRACTICES MEDHANIE EPHREM – LONG BEACH CITY COLLEGE KARL VON DER LINDEN, RCDD – P2S ENGINEERING TERRANCE DEGRAY, PE, CCM – CORDOBA

Cordoba Corp: Best Practices for Security Camera Implementation

Embed Size (px)

Citation preview

Page 1: Cordoba Corp: Best  Practices for Security Camera Implementation

LONG BEACH CITY COLLEGEDISTRICT WIDE SECURITY CAMERA IMPLEMENTATION BEST PRACTICES

MEDHANIE EPHREM – LONG BEACH CITY COLLEGE

KARL VON DER LINDEN, RCDD – P2S ENGINEERING

TERRANCE DEGRAY, PE, CCM – CORDOBA CORPORATION

Page 2: Cordoba Corp: Best  Practices for Security Camera Implementation

2

INTRO AND GOALS OF PRESENTATION

•Learning #1: Initial Project Steps•Learning #2: Define the Scope of Work•Learning #3: Procurement Methods•Learning #4: Construction Phasing

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A

Page 3: Cordoba Corp: Best  Practices for Security Camera Implementation

3

FEASIBILITY AND SPR

•Importance of Security Programming Report (SPR)•Approach and User Group•Standard Operating Procedures•Board Approved Policies and Regulations

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A

Page 4: Cordoba Corp: Best  Practices for Security Camera Implementation

4

PROJECT TEAM

•Identify your core team early

•Campus Communication•Facilities Advisory

Committee•Citizens Oversight

Committee•Board of Trustees

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A

COREGROUP

DESIGNERS CONSTRUCTIONMANAGER

GENETEC

ARECONTSTRUCTURAL

ARCHITECTURAL

Page 5: Cordoba Corp: Best  Practices for Security Camera Implementation

5

DESIGN PARAMETERS•Coverage

Requirements•Visual

Communication with District

•DSA Submission

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A

Page 6: Cordoba Corp: Best  Practices for Security Camera Implementation

6

PACIFIC COAST CAMPUS

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A

Red = Facial recognition / Green = Camera coverage

Page 7: Cordoba Corp: Best  Practices for Security Camera Implementation

7

LIBERAL ARTS CAMPUS

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A

Red = Facial recognition / Green = Camera coverage

Page 8: Cordoba Corp: Best  Practices for Security Camera Implementation

8

DEVELOPMENT OF STANDARD OPERATING PROCEDURES

•Review of other Program SOPs•Prepare our own SOPs•Develop Policies and Regulations for Board Approval

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A

Page 9: Cordoba Corp: Best  Practices for Security Camera Implementation

9

DESIGN PROCESS•Basis of Design (BOD)•As-Built Documentation•Campus Master Plan•Campus Systems Network•Field Investigation

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A

10.9.15 – 1.1.16

100% CONSTRUCTIONDOCUMENTS

1.18.16 – 3.21.16 4.1.16 – 5.16.16 5.16.16 – 8.1.16 7.16.16 – 8.14.16 10.1.16 – 8.1.17

75% CONSTRUCTIONDOCUMENTS

PRELIMINARYDESIGN

DSAREVIEW

PREQUALIFICATION& BIDDING CONSTRUCTION

Page 10: Cordoba Corp: Best  Practices for Security Camera Implementation

10

DESIGN PROCESS

•Analytics•Camera Selection Process •Education of LBCC by Design Team•Design Deliverables

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A

10.9.15 – 1.1.16

100% CONSTRUCTIONDOCUMENTS

1.18.16 – 3.21.16 4.1.16 – 5.16.16 5.16.16 – 8.1.16 7.16.16 – 8.14.16 10.1.16 – 8.1.17

75% CONSTRUCTIONDOCUMENTS

PRELIMINARYDESIGN

DSAREVIEW

PREQUALIFICATION& BIDDING CONSTRUCTION

Page 11: Cordoba Corp: Best  Practices for Security Camera Implementation

11

SYSTEM INTEGRATION WITH LOCAL LAW ENFORCEMENT

•Long Beach Police Department•Video Surveillance Software (Genetec)

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A

Page 12: Cordoba Corp: Best  Practices for Security Camera Implementation

12

DATA SYSTEM INFRASTRUCTURE UPGRADES

•As-Builts and Systems Review•Field Investigation•ITS Knowledge

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A

Page 13: Cordoba Corp: Best  Practices for Security Camera Implementation

13

DISTRICT PROCURED ITEMS

•Security Cameras / CMAS•Network Switches / CMAS•Network Servers and Storage / CMAS•New Computer Workstations / CMAS

• All other items by the Contractor including the VMS Software

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A

Page 14: Cordoba Corp: Best  Practices for Security Camera Implementation

14

BID PROCESS•Prequalification Process•Job Walks•Bid Results

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A

Page 15: Cordoba Corp: Best  Practices for Security Camera Implementation

15

CONSTRUCTION AND PHASING•Methodology to mitigate impacts to the District•Phasing Plan with Bid Documents

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A

Page 16: Cordoba Corp: Best  Practices for Security Camera Implementation

16

CONSTRUCTION AND PHASING

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A

Page 17: Cordoba Corp: Best  Practices for Security Camera Implementation

17

FUTURE PROJECTS AND PLANNING

•District Standards Insert for Upcoming Projects to include design guidelines

•Policies and Regulations are a Living Document•Maintenance and Staffing Requirements

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing Future Projects Q&A

Page 18: Cordoba Corp: Best  Practices for Security Camera Implementation

QUESTIONS

Intro Feasibility & SPR Project Team BODs and SOPs Design Process OFOI and OFCI Bid Process Construction and Phasing

Future Projects Q&A

Medhanie Ephrem – Long Beach City CollegeKarl Von Der Linden, RCDD – P2S Engineering

Terrance DeGray, P.E., CCM – Cordoba Corporation