Aim

The aim of my presentation is to briefly

discuss about the building construction

and management function and

recommendation for future progress.

5

Page 6: Construction work of a multi storied residential building

Contents

Introduction

Company Overview

Study Carried Out

Problems Identification and Suggestion

Conclusions

Recommendation

6

Page 7: Construction work of a multi storied residential building

Introduction

An eight storied residential building have two parts. These are

sub-structure and super-structure.

In a construction process both theoretical knowledge and practical work

are equally important.

The longevity of construction work depends on monitoring of a ‘Site

Engineer’. So he is an important person of a project.

7

Page 8: Construction work of a multi storied residential building

Objective

The main objective of this project is to plan over constructionand to progress the construction process.

To acquire practical knowledge.

To increase monitoring work during construction process.

To decrease amount of wastage materials.

To optimum use of time and manpower.

To make the project economical.

8

Page 9: Construction work of a multi storied residential building

Company Overview

Nirapad Real Estate & Development Ltd. is located, House # 9,Road# 9,Sector # 9, Uttara, Dhaka. Honorable Managing Director JashimUddin Kobir is owner of this Organization.

Nirapad Real Estate & Development Ltd. is a promising name thathas already marked its success as one of the distinct Real EstateCompanies.

Established in 2003.

This Organization has initiated and already handed over severalprojects in different locations of Uttara in Dhaka city.

9

Page 10: Construction work of a multi storied residential building

The Project of Nirapad Real Estate &

Development Ltd.

Handed Over Projects:

NIRAPAD NILIMA NIRAPAD LUPIN

House #01, Road #12, House # 04, Road # 07,

Sector # 10, Uttara , Dhaka. Sector # 09, Uttara, Dhaka.

10

Page 11: Construction work of a multi storied residential building

Project Brief

Project name: NiRApad oasis lodge

Address: House# 32, Road# 12,

Sector# 10, Uttara, Dhaka.

Land area: 5 katha or 3600 sft.

Number of building: 01(One).

Number of apartment: 12(Twelve).

Size of apartment: 1225 sft.

11

Page 12: Construction work of a multi storied residential building

Site Survey

Observed the location of site.

Site is West and North face.

Identified the access to the site.

Measured the length and breath.

Earth filling not required.

12

Page 13: Construction work of a multi storied residential building

Organization Structure 13

Page 14: Construction work of a multi storied residential building

Job Responsibility

Daily work schedule.

Estimate.

Preparing materials requisition.

Monitoring the total construction work.

Inform the top management about daily work progress.

Quality control of during construction work.

Labour maintaining.

14

Page 15: Construction work of a multi storied residential building

Employed Designer & Architect

After the site survey Nirapad Real Estate & Development Ltd.

employed a designer and architect, from:

‘Talukder Designer & Consultant’.

House# 11, Road# 08, Sector# 09, Uttara, Dhaka.

Structural Designer:

Eng. Kawser Talukder

B.Sc. Engg. (BUET)

Architect:

Mahmud-Ul-Aziz

15

Page 16: Construction work of a multi storied residential building

DIT Plan16

Page 17: Construction work of a multi storied residential building

17

Page 18: Construction work of a multi storied residential building

Use of Materials

Reinforcement

Stone

Cement

Brick

Sand

Sylhet sand (F.M. 1.8-2.5)

Fine sand (F.M. 1.1-1.4)

Plumbing and Sanitary Fittings and Fixtures

Electrical Fittings and Fixtures

Tiles

Paint

18

Page 19: Construction work of a multi storied residential building

Estimate

SI Description Unit Qty Rate(TK.) Total Cost

01 Reinforcement

a. 20 mm (60 grade) kg 5600 53.00 296800

b. 16 mm (60 grade) kg 7134 53.00 378102

c. 12 mm (60 grade) kg 31050 53.00 1645650

d. 10 mm (60 grade) kg 1750 53.00 92750

e. 10 mm (40 grade) kg 6550 52.00 340600

02 Shah Special Cement bag 6515 360.00 235400

03 First Class Bricks nos 173400 7.00 1213800

04 Fine Sand cft 17890 14.00 250460

05 Sylhet Sand cft 5682 28.00 159096

06 Stone Chips cft 3984 110.00 438240

19

Page 20: Construction work of a multi storied residential building

20

SI Description Unit Qty Rate(TK.) Total Cost

07 Brick Chips cft 12782 65.00 830830

08 Grill Works - - - 150,900

09 Tiles Works - - - 160,700

10 Paint Works - - - 145,080

11 Wooden Work - - - 702,147

12 Electrical Work - - - 799,543

13 Lift + Generator

+Substation

- - - 2,300,000

14 Plumbing Cost - - - 1,123,238

15 Labor - - - 2,000,000

Total Cost 14,940,117

Page 21: Construction work of a multi storied residential building

SlabForm work procedure:

After completed the column casting work, start slab with beam centering.

Use bamboo posts @ 2' c/c for slab centering.

After that use timber for slab centering.

Fixed the end of steel sheet with wood by nails.

Level the form of slab.

21

Figure: Centering of slab

Page 22: Construction work of a multi storied residential building

Reinforcement placing:

Bottom layer:

Binding for bottom layer

reinforcement, mainly use two

categories.

First one is short direction

reinforcement.

Second one is long direction

reinforcement.

22

Figure: Slab reinforcement placing

Page 23: Construction work of a multi storied residential building

Crank bar :

Crank bar should be used in both way of slab.

Extra top bar:

Extra top bar are to be used on every crank bar.

23

Page 24: Construction work of a multi storied residential building

Clear cover:

Clear cover 1" was taken

in every slab.

Figure: Clear cover of slab

24

Page 25: Construction work of a multi storied residential building

Slab Casting:

At first slab casting by

concrete.

After that concrete place in

column and beam joint,

then concrete place over whole

slab.

Carefully compaction of concrete

by Vibrating machine.

25

Figure: Compaction of concrete

Page 26: Construction work of a multi storied residential building

Brick WorkWorking procedure of brick

wall:

Select the first class bricks.

Chipped and cleaned the

surface and made layout.

Joint mortar was proper compacted by steel

trowel.

26

Figure : Brick work

Page 27: Construction work of a multi storied residential building

English bond was ensured.

Vertical and horizontal alignment was maintained.

1st lift brick work was, for 5" wall 4' and 10" wall 5'.

Curing for 14 days was ensured.

27

Page 28: Construction work of a multi storied residential building

Lintel Work

Working procedure of lintel:

After completed 7' height brick wall,

lintel mainly made above the door and

window.

For large span lintel used bamboo

posts.

According to wall wide, completed the

centering and shattering.

28

Figure: Lintel centering and shattering

Page 29: Construction work of a multi storied residential building

Fixed the end of wood with brick wall

by nails.

Used reinforcement in lintel.

Casting properly, ratio is 1:2:4.

Properly curing at least 7 days.

29

Figure : Reinforcement place in lintel work

Page 30: Construction work of a multi storied residential building

Preparation of background:

At first clean the masonry and RCC surface properly.

If any part of the walls so high, then cut the high part.

The surface of wall kept moist for at lest 6 hours before plaster is started.

30

Figure : Preparation of background

High part

Page 31: Construction work of a multi storied residential building

Preparation of mortar:

Different works proportion were

different.

For RCC ceiling surface proportion

was 1:4, brick wall surface

proportion was 1:5.

Cement and sand mixture were

uniform.

31

Figure: Mortar mixture work

Page 32: Construction work of a multi storied residential building

Application of mortar:

Made pia of plaster 5˝x 5˝,

according to wall area was

divided into a number of

strips as reference level of

plaster.

Applied the mortar

masonry wall surface and

RCC ceiling surface.

32

Figure: Plaster work

Page 33: Construction work of a multi storied residential building

Did not apply sand cement dry mix on the prepared

surface.

If required plaster thickness more than 1". Did the plaster in 2 coats

(scratch and finish coat).

Finished the surface with Gauging trowel, Wooden float and Floating rule.

33

Page 34: Construction work of a multi storied residential building

Sanitary & Plumbing

Purpose of sanitary and plumbing:

Conveying drinking water.

Conveying wastewater.

Conveying rain water.

Waste disposal.

34

Page 35: Construction work of a multi storied residential building

PVC/U-PVC pipe work procedure:

At first made 4" hole in toilet floor.

Then joint the sewerage and waste water pipes in

to the hole.

Stand the pipes vertically from ground floor to

roof.

Fixed the pipes on wall with vertically U-clamp

each 4' interval.

35

Page 36: Construction work of a multi storied residential building

Help to the pipe rain water & waste water

come directly in waste water pit & convey to

the city corporation drain.

Similarly excreta directly come from toilet in

sewerage pit & go to the septic tank.

36

Figure: Sewerage and drainage work

waste water

pit

Sewerage pit

Page 37: Construction work of a multi storied residential building

GI pipe work procedure:

Did not start groove cutting for pipes

in wall, which is not cured for more

than 24 days.

Make groove cutting straight

by groove cutting machine.

37

Figure: GI pipe

Page 38: Construction work of a multi storied residential building

Problems Identification & Suggestion

SL

.

Problem Identified Suggestion

0

1

In my working site, there

weren’t reputed

contractor and experience

full subcontractor.

I informed project manager.

Then he changed them and also

employed new contractor and

subcontractor.

0

2

Contractor didn’t

maintained proper work

schedule.

I regularly communicated with

them and increased observation.

0

3

So many unskilled mason

and labour were in my

construction site.

So, I have tried to handle

unskilled labour and mason and

sometime trained them.

38

Page 39: Construction work of a multi storied residential building

SL. Problem Identified Suggestion

04 Building project neighbor

side there were no proper

safety of during construction

time.

I used Hessian cloth with

bamboo bracing to project

neighbor side, from the brick

bats, plaster mortar etc.

05 Suppliers didn’t supply

good quality sand, during

plastering work.

I have informed to the top

management and they

supplied good quality sand.

39

Page 40: Construction work of a multi storied residential building

Conclusion

Durability of a building depend mainly on proper construction process and

proper use of materials.

I have supervised slab work, brick work, plaster work, sanitary & plumbing

work etc.

After supervision of my construction site, I have learned a lot about

theoretical background and achieve practical experience. It seems to me

that the practical knowledge is essential to be an efficient engineer.

40

Page 41: Construction work of a multi storied residential building

Recommendation

Standard quality of material should be ensured first

Leakage into joint of formwork should not allowed

Unclean reinforcement should not used

During casting vibrator should be straight instead of inclined

Before casting vertical and horizontal level should be checked for all

formwork

Every day before closing of works, the site should be cleaned