12
BURJ DUBAI : Wonder of Civil Engineering

Burj Dubai

Embed Size (px)

DESCRIPTION

Structural engineering

Citation preview

Page 1: Burj Dubai

BURJ DUBAI :Wonder of

Civil Engineering

Page 2: Burj Dubai

General Information Location : Dubai, United Arab Emirates. Construction started: January 2004 Completed :2009 Opening 4 January 2010 Cost $1.5 billion Height Roof 828 m (2,717 ft) Floor count 163 Floor area 309,473 m2 (3,331,100 sq ft)

Page 3: Burj Dubai

BURJ DUBAI

Page 4: Burj Dubai

Civil EngineerAdrian Smith Bill Baker

Architect

Page 5: Burj Dubai

Construction of Burj Dubai

2004 2005

Page 6: Burj Dubai

200

Going to be finished

2006 2008

Page 7: Burj Dubai

It took 6 years, 3900 tonnes of reinforcing steel,

330000 cubic metres of concrete

and 22 million man-hours to complete…

Page 8: Burj Dubai

Opening Ceremony

On 4 January

2010

Page 9: Burj Dubai

Inside The Burj Dubai

Page 10: Burj Dubai

Burj Dubai

Page 11: Burj Dubai

Records:

1.Tallest existing structure

2.Highest elevator system

3.Most floors:163

4.Highest Restaurant :122th floor

5.Highest new-year display on fireworks

6.Second highest swimming pool :76th floor

Page 12: Burj Dubai

Fazlur Rahman KhanThe Greatest Civil Engineer of 20th century

In the world