30
HYDROGEN PEROXID CHEMICAL PLANT BANGLADESH

Bangladesh Hydrogen Peroxide Chemical Plant

Embed Size (px)

Citation preview

Page 1: Bangladesh Hydrogen Peroxide Chemical Plant

HYDROGEN PEROXIDE CHEMICAL PLANTBANGLADESH

Page 2: Bangladesh Hydrogen Peroxide Chemical Plant

Hydrogen Peroxide Chemical EPC Plant inBangladesh

Tasnim Chemical Complex Limited (TCCL), Bangladesh)

Tasnim Chemical Complex Limited (TCCL) is a part of Meghna Group of Industries (MGI), a leading

conglomerate of Bangladesh. The company has a turnover of USD 2 billion and is currently

operating in 32 companies, 30 Industries with more than 15000 employees, 3000 distributors &

1000 suppliers under its umbrella. 

Tasnim was established by MGI in 2009 to catapult the industry growth, reduce import dependency

of chemicals, manufacture and market world class chemical with outstanding product quality,

product development capabilities and outstanding services.

Nuberg Engineering was awarded EPC Project to build Hydrogen Peroxide Chemical Plant. India

based Nuberg has been chosen as the EPC contractor for the project on EPC – LSTK basis.

Page 3: Bangladesh Hydrogen Peroxide Chemical Plant

Tasnim Chemical Complex Ltd. - Project Details

PROJECT Hydrogen Peroxide – EPC / LSTK Basis

CLIENT Tasnim Chemical Complex Ltd, FRESH VILLA, House # 15, Road # 34, Gulshan-01, Dhaka-1212, Rd No 34, Dhaka 1212, Bangladesh

PRODUCTS Hydrogen Peroxide

EPC CONTRACTOR Nuberg Engineering Limited

PROCESS TECHNOLOGY EB Process, Sweden

NATURE OF PROJECT Engineering Procurement Construction (EPC) – Lump Sump Turnkey (LSTK) Project.

HEAVY FABRICATIONHeavy fabrication for process equipment for chemical plant is done from Nuberg’s state-of-the-art fabrication facility in Gujarat, India. The 115000 sqm facility has ISO, ASME, U Stamp and IBR etc. accreditation.

Page 4: Bangladesh Hydrogen Peroxide Chemical Plant

Tasnim Chemical Complex Ltd – Scope of Work

ENGINEERING

Process Design & Technology

Basic & Detail Engineering

* Civil & Structural

* Static Equipment

* Electrical & Instrumentation Piping

CONSTRUCTION

Construction Project Management

Installation & Erection of Equipment, Piping and

Systems

Mechanical, Instrumentation and Electrical work

Site Inspection & Safety Enforcement

Commissioning

PROCUREMENT & FABRICATION

Vendor Development & Qualification

Cost Estimation & Purchase

Supplier Capability Assessments

Quality Inspection & Surveillance

Fabrication of Heavy Process Equipment, Pressure

Vessels, Heat Exchangers, Boilers, Columns & Towers,

Tanks etc.

PROJECT MANAGEMENT

Technical & Commercial Documentation

Site Survey & Project Schedule

Engineering Drawing Approval

Vendor Screening and Qualification

Material Management & Dispatch

Erection and Commissioning

Training and Hand Holding

Page 5: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Hydrogen Plant

Page 6: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Natural Gas Reforming System

Page 7: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Boiler Feed Water Pumps

Page 8: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Natural Gas Compressor TCCL

Page 9: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Air Pre Heater System

Page 10: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Natural Gas Compressor System

Page 11: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Hydrogen Plant

Page 12: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Natural Gas Reforming System

Page 13: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Working Solution Circulation Pump

Page 14: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Working Solution Secondary & Pollishing Filter Section

Page 15: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

TCCL Hydrogen Reformer

Page 16: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Hydrogen Peroxide Plant

Page 17: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Oxidation & Extraction Towers

Page 18: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Hydrogen Plant view

Page 19: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Hydrogen Peroxide Plant View

Page 20: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Hydrogen Plant Night View

Page 21: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Hydrogenation System Working Solution Primary Filtration system

Page 22: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Secondary & Safety Filter Sed

Page 23: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

UPS For H2 Plant

Page 24: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Utility For H2 & H2O2

Page 25: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

MCC Panel

Page 26: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Process Air Compressors

Page 27: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Process Tanks Reformer Chimney

Page 28: Bangladesh Hydrogen Peroxide Chemical Plant

ENGINEERING | PROCUREMENT | FABRICATION | CONSTRUCTION | PROJECT MANAGEMENT SERVING IN 30+ COUNTRIES 750+ PROFESSIONALS 115000 SQM FABRICATION FACILITY

Process Air Compressors

Page 29: Bangladesh Hydrogen Peroxide Chemical Plant

NUBERG EPC – Company Profile

Nuberg Engineering is a global Engineering, Procurement & Construction (EPC), Fabrication and Project Management company. We are reckoned as trusted turnkey project contractor for Chemical Plants, Hydrogen Generator Gas Plants in strategic collaboration with PERIC and PSA Nitrogen Gas Plants in technical association with Carbotech GmbH. As a leading EPC contractor for chemical and specialty chemical plants, Nuberg has set up more than 40 chemical plants from scratch in over 30 countries so far, on EPC basis.

As one of the fastest growing EPC companies in Chlor Alkali / Caustic Soda, Hydrogen Peroxide, Sulfuric Acid and Calcium Chloride, we serve across Chemical Process Plants & Fertilizer Plants, Hydrocarbons (Oil & Gas) Plants, Steel Plants and Nuclear & Defence Plants. With state-of-the-art heavy fabrication facility in Gujarat in India and R&D center in Sweden, Nuberg firmly believes in following stringent global engineering and project management standards. We take pride in serving our esteemed customers across Middle East, Latin America, Africa, Asia, America and Europe including countries like USA, Oman, Canada, Abu Dhabi, Saudi Arabia, Qatar, Algeria, Ethiopia, Paraguay, Egypt, Australia, Turkey, Iran, Iraq and Bangladesh.

We have specialized heavy fabrication facility for manufacturing of process equipment for chemical plants. Nuberg's state-of-the-art heavy fabrication facility for chemical plants is located in Gujarat, India. The fabrication facility is very well certified with ISO, ASME, U Stamp and IBR etc. accreditation and is spread across an area of 115000 square meter. Having in house fabrication capability helps us to deliver our EPC projects with better quality and in timely manner.

Page 30: Bangladesh Hydrogen Peroxide Chemical Plant

NUBERG – SOCIAL MEDIA LINKS

•Linkedin https://www.linkedin.com/company/nuberg-engineering-limited

•Flickr https://flic.kr/ps/2Wkqud

•Slideshare http://www.slideshare.net/Nuberg

•Youtube https://www.youtube.com/user/nuberggroup

• Google Plus https://plus.google.com/+NubergEngineeringNoida

• Contact us : www.nubergindia.com, [email protected]