38
Tel: (+44) 01492 879813 Mob: (+44) 07984 284642 [email protected] www.abrisk.co.uk 1 Task Risk Management Andy Brazier

2015 Trinity Dublin - Task risk management - hf in process safety

Embed Size (px)

Citation preview

Page 1: 2015 Trinity Dublin - Task risk management - hf in process safety

Tel: (+44) 01492 879813 Mob: (+44) 07984 [email protected] 1

Task Risk Management

Andy Brazier

Page 2: 2015 Trinity Dublin - Task risk management - hf in process safety

2

A bit about me

Chemical engineerBSc - Loughborough UniversityPhD - Edinburgh University

19 years working as human factors consultant10 years self-employed

Registered member of the Chartered Institute of Ergonomics and Human Factors (CIEHF)Associate member of Institute of Chemical Engineers (IChemE)

Page 3: 2015 Trinity Dublin - Task risk management - hf in process safety

Experience

Predominantly oil, gas, chemical, power and steel industriesHuman factors in major accident safety

Design assessmentsSafety critical task analysisStaffing and organisational change

Clients include Shell, BP, SSE, Centrica, Tata, Syngenta, Total, Maersk etc.

3

Page 4: 2015 Trinity Dublin - Task risk management - hf in process safety

Places I have works – UK & Ireland

4

Page 5: 2015 Trinity Dublin - Task risk management - hf in process safety

Places I have worked – further afield

5

Page 6: 2015 Trinity Dublin - Task risk management - hf in process safety

Projects I have worked on but not visited

6

Page 7: 2015 Trinity Dublin - Task risk management - hf in process safety

7

Human factors and safety

Up to 80% of accident causes can be attributed to human failuresAll major accidents involve a number of human failuresHuman factors is concerned with

Understanding the causes of human failuresPreventing human failures

An important part of managing ‘major accident safety’

Page 8: 2015 Trinity Dublin - Task risk management - hf in process safety

8

Page 9: 2015 Trinity Dublin - Task risk management - hf in process safety

1. Annulus cement

barrier did not isolate

hydrocarbons

Deepwater Horizon

Explosions & Fire

2. Shoe track barriers did not isolate

hydrocarbons

7. Fire and gas system

did not prevent ignition

3. Negative-pressure test

accepted - integrity not established

4. Influx not recognised

until hydrocarbon

s were in riser

5. Well control

response actions failed

6. Diversion of mud

resulted in gas venting

to rig

8. BOP emergency

mode did not seal well

Why?

Page 10: 2015 Trinity Dublin - Task risk management - hf in process safety
Page 11: 2015 Trinity Dublin - Task risk management - hf in process safety

Initially – did not achieve seal around

drill pipe

Negative pressure test accepted even

though integrity had not been established

Did not follow

agreed test method

Mis-interpreted

data

Crew had preferred method

Operational instruction only broad guidance

Did not recognise

more liquid than

expected

No prediction

available at time

Rig crew expected to know how to perform test

Previous experience

Not aware of specified permit

requirements

Did not realise

constant high

pressure indicated a

problem

Plausible explanation

(bladder effect)

Why?

Why?Why?

Why?Why? Why? Why?

Page 12: 2015 Trinity Dublin - Task risk management - hf in process safety

Crew busy with other activities

Influx not recognised until hydrocarbon was present in riser

Instructions required constant

monitoring - did not specify

how

Crew not monitoring

well

Other activities

interacting with pits

Pits not set-up for combined

activities

Mud pit levels not

available to monitor

Why?

Why?Why?

Page 13: 2015 Trinity Dublin - Task risk management - hf in process safety

Well control response actions failed to regain control of the

well

Slow to detect the problem

Crew not properly

prepared in required actions

Protocols did not cover

the scenario

Crew had not been trained to

deal with the event

Why?

Why?

Page 14: 2015 Trinity Dublin - Task risk management - hf in process safety

Working in silos

14

QRA

HAZOP

Human factors

Page 15: 2015 Trinity Dublin - Task risk management - hf in process safety

Problem with working in silos

GenerallyRisks not understood fullyControls less effective and/or efficient

Human factorsConsequence of error not recognised in human factors studiesNon-human factors people make inappropriate assumptions about how humans can failureSolutions/risk controls introduce additional human factors problems.

15

Page 16: 2015 Trinity Dublin - Task risk management - hf in process safety

Extracting human factors from HAZOP

Safeguards with human componentMonitoring and controlAlarm responseTraining or procedure???

Safeguard maintenanceTasks considered as potential causes of deviationRecommendations.

16

Page 17: 2015 Trinity Dublin - Task risk management - hf in process safety

Issues with HAZOP and human factors

Not a systematic study of human factors Human factors principles not always applied (correctly)HAZOP is already demanding without adding human factorsBut creating good links between HAZOP and human factors could be very beneficial.

17

Page 18: 2015 Trinity Dublin - Task risk management - hf in process safety

18

Risk profile

Hazard detail

Engineered Human

Hierarchy Task or activity

1. Instrument2. Alarm3. Trip4. Mechanical

Task risk management

1. HMI2. Deviation response3. Emergency4. Generic competence5. One-off risk assessment6. Automated

Prioritise according to risk of MAHQRA, HAZID

Identify deviations leading to MAHHAZOP, PHR

ALARP

Barriers

Bowtie?

Page 19: 2015 Trinity Dublin - Task risk management - hf in process safety

Task Risk Management

Five stage process1. High level screening2. Identify tasks3. Prioritise tasks for analysis4. Analyse the most critical tasks5. Use the findings

19

Page 20: 2015 Trinity Dublin - Task risk management - hf in process safety

1. Screening

The parts of the system to focus your effortHazardous ComplexCritical to production

Systems with potential for Major Accident Hazards (MAH) – all tasks are considered to be “safety critical.”

20

Page 21: 2015 Trinity Dublin - Task risk management - hf in process safety

1. Screening - hypothetical hazardous plant

Process storage – yesReaction plant – yesPipeline – noWater treatment – partlyInstrument air – no

21

Page 22: 2015 Trinity Dublin - Task risk management - hf in process safety

2. Identify tasksPossible approaches

Skip the step – people often want to dive straight into task analysisExisting procedures – assume they cover all tasksStructured brainstorming – process drawing

22

FiltersDuty/standby

PumpsDuty/standby

DP

Alarms

LoLoLo

Hi

Trip

Storage tank

Deliverytanker

Group exercise

Page 23: 2015 Trinity Dublin - Task risk management - hf in process safety

2. Identify tasksThis step is very simple – but encourages a systematic approachUses for task lists

‘Gap analysis’ of procedures, training/competence systems;‘On the job’ training programmes;Workload estimates;Managing organisational changes.

23

Page 24: 2015 Trinity Dublin - Task risk management - hf in process safety

3. Prioritise tasks for analysisPossible approaches

‘Gut feel,’ experience or ‘normal’ risk assessmentHAZOP, Process Hazard Review (PHR) etc.Scoring system (see OTO 092 1999 – HSE)

24

Hazardousness of systemIgnition/energy sourcesChanging configurationError vulnerabilityImpact on safety devicesOverall criticality

Low Medium High

1 2 3 1 2 3 1 2 3 1 2 3 1 2 30-3 4-8 9-15

Page 25: 2015 Trinity Dublin - Task risk management - hf in process safety

3. Prioritise tasks for analysisBenefits of scoring tasks at stage 2

ObjectiveDemonstration of why tasks were selected for analysis – safety reports/casesHighlight ‘anomalies’ without carrying out a detailed task analysis

25

Microsoft Excel Worksheet

Page 26: 2015 Trinity Dublin - Task risk management - hf in process safety

4. Analyse the most critical tasksTask analysis is tried and tested – but negative perceptions

Time and effortOnly doing it to keep the regulator happy

Discoveries from every analysis - if done ‘properly’

26

Page 27: 2015 Trinity Dublin - Task risk management - hf in process safety

27

Connect tanker to delivery

point

27272727272727

Transfer fuel from road-tanker to storage

Preconditions•Delivery from approved supplier•Tanker located in unloading bay

Transfer fuel using

tanker’s pump

Disconnect tanker from

delivery point

Confirm tanker is OK

to offload

Connect earth to tanker

Connect vapour

recovery hose

Connect delivery

hose between tanker & delivery

point

Open valves Check for leaks

Start tanker’s pump

Standby & monitor

throughout

When complete, stop pump and close

valves

Page 28: 2015 Trinity Dublin - Task risk management - hf in process safety

4. Analyse the most critical tasksGroup exercise – use a data projector

People share experiences and concernsAccept procedure may not reflect realityBuy in to new methodsAn excellent training exercise for people involved

Human error analysisLook at the task with ‘new eyes’Identify where issues have been ‘glossed over’

28

Page 29: 2015 Trinity Dublin - Task risk management - hf in process safety

Consider consequence for each step if

Omitted (not carried out)IncompletePerformed on the wrong objectMistimed (too early or late)Carried out at the wrong speed (too fast or slow)Carried out for the wrong duration (too long or too short)Performed in the wrong direction.

29

Page 30: 2015 Trinity Dublin - Task risk management - hf in process safety

30303030

Task Step Possible error Existing risk control measuresConsequence Additional

measures

30

Connect earth to tanker

Action omitted -

Potential for static discharge to act as source of ignition

Failure to achieve an earth before starting transfer.

Standard practice for all tanker operations.

Consider installing interlocked earth connection.Earth

connection readily available.

Page 31: 2015 Trinity Dublin - Task risk management - hf in process safety

5. Use the findings‘Engineer out’ error potential

New projects – human factors integration planDesign reviews and system modifications

ProceduresHigh criticality – print, follow and sign every timeMedium criticality – reference proceduresLow criticality – generic procedures and guidance

How do you manage the risks the risks of critical tasks that are performed frequently?Competence system

How to perform tasksUnderstanding the risks

31

Page 32: 2015 Trinity Dublin - Task risk management - hf in process safety

5. Use the findings

Continuous review – proactive and reactiveConsider all stages when examining failures

1. Why is a task missing from the list?2. Why was criticality not assessed correctly?3. Was the task analysis correct?4. Were the findings used?

32

Page 33: 2015 Trinity Dublin - Task risk management - hf in process safety

Differential tasks vs activities

Safety Critical Task (SCT)There is a clear start and finishThere are discrete stepsA change of status occurs

Safety Critical Activity (SCA) where the critical aspects are:

Timing (when to perform the task)Tools and equipment to be usedInformation presentationDecision making

33

Page 34: 2015 Trinity Dublin - Task risk management - hf in process safety

Examples of SCT

Node start-up and shutdownStarting main items of equipment

Stopping same equipment often simpler

Remove, calibrate and replace relief valve or bursting diskLeak or pressure test.

34

Page 35: 2015 Trinity Dublin - Task risk management - hf in process safety

Examples of SCA & how to address

Control/optimise process Human Machine Interfaces (EEMUA 191/201)

Emergency responseEmergency planning/staffing assessment

Routine maintenance/inspection Planning and schedulingCompetence of personnel, permit to work

One-off tasks (e.g. temporary repair)Risk assessment and management of change.

35

Page 36: 2015 Trinity Dublin - Task risk management - hf in process safety

SCT or SCA depends on circumstance

Changing operating modeManual stop or tripCheck/calibrate transmitterFunction test tripMaintain process equipment

Contractor management

Prepare plant for maintenanceNormal shutdown?

36

Page 37: 2015 Trinity Dublin - Task risk management - hf in process safety

Conclusions

Linking human factors with other process safety activities has great benefits

Linking all process safety activities should be the aim

Differentiating SCT and SCA helps clarify the way forwardNeeds to be continuous and iterative

Changing the approach to human factors is not the only requirementProcess safety studies need to be modified to provide better date for human factors studies.

37

Page 38: 2015 Trinity Dublin - Task risk management - hf in process safety

38