PARK LANE MEWS HOTEL PROJECT 01 WELCOME Welcome to a public exhibition of the proposals for the Park Lane Mews Hotel Project, incorporating 16 Stanhope Row, 16a, 16b & 17 Market Mews, 37 Hertford Street, 36 Hertford Street and 46 Hertford Street. Genting UK, together with architects Stiff + Trevillion, have prepared plans to redevelop the site for a new hotel with an ancillary casino. Genting UK will shortly be submitting a planning application to Westminster City Council. You are invited to view the boards on display, which outline our proposals for the site. We would be grateful if you could complete a feedback form to let us know your views on the scheme. Members of the project team are on hand to answer any questions you may have and provide further information if required. PARK LANE MEWS HOTEL (2 STANHOPE ROW) 16 & 17A MARKET MEWS 36 HERTFORD STREET 37 HERTFORD STREET 46 HERTFORD STREET 8 17a 36 STANHOPE ROW 1 23 46 27 16a 24 17 7 econfield House n Carrington 2 24 10a 21 Bank se 32 11 48 17c 42 15 MARKET MEWS T T 6 BRICK STREET K K 50 Curzon House Bank 10 10 55 6 11 12a 12 DOWN STREET Ga 18 .1m 12 HERTFORD STREET 26 Bank Hotel 49 21 21 Hotel 31 Shepherd Shepherd PH 19 17 17 MEWS 23 SHEPHERD STREE 17 3 17a 37 16 1 37 to 49 11 4 1 to 8 8 47 Vicarage Cinema 15 22 22 to 28 DERBY RBY ST ST Y Y Y Y 6b 1 25 38 Works 6a 37 Interpark House k k 2 5 301 to 311 30 Chy 20 .2m 2 7 2 701 to 05 705 6b 26 36 10 2 to 5 39a 7 to 9 Hotel Hotel TREBECK STREET K K 601 to 60 60 23 2a Market 21a to Christ 16 52 Club 1 38 33 22 8 Church 20 13 9 HERTFORD STREET 44 501 to 511 6 5 16 .9m 14 20 21 29 15 Par 31 to 35 Curzon 17b 20 34 Fig. 1. Site Location Plan Fig. 2. Park Lane Mews Hotel - as Existing Fig. 3. Site Location Satellite Image Fig. 4. Aerial View from South Fig. 5. Aerial View from North
1. PARK LANE MEWS HOTEL PROJECT 01 WELCOME
Welcometoapublicexhibitionoftheproposalsfor the Park Lane Mews
Hotel Project, incorporating 16 Stanhope Row, 16a, 16b & 17
Market Mews, 37 Hertford Street, 36 Hertford Street and 46 Hertford
Street. Genting UK, together with architects Stiff + Trevillion,
have prepared plans to redevelop the site for a new hotel with an
ancillary casino. Genting UK will shortly be submitting a planning
application to Westminster City Council. You are invited to view
the boards on display, which outline our proposals for the site. We
would be grateful if you could complete a feedback form to let us
know your views on the scheme. Members of the project team are on
hand to answer any questions you may have and provide further
information if required. PARK LANE MEWS HOTEL (2 STANHOPE ROW) 16
& 17A MARKET MEWS 36 HERTFORD STREET 37 HERTFORD STREET 46
HERTFORD STREET PARK LANE MEWS HOTEL (2 STANHOPE ROW) 16 & 17A
MARKET MEWS 36 HERTFORD STREET 37 HERTFORD STREET 46 HERTFORD
STREET 8 17a 36 STANHOPEROW 1 23 46 27 16a 24 17 7 Leconfield House
Carrington Carrington House House 2 24 10a 21 Bank House 32 11 48
17c 42 15 MARKET MEWS MARKET MEWS MARKET 6 BRICK STREET BRICK
STREET BRICK 50 Curzon House Bank 10 10 55 6 11 12a12a DOW N STREET
Garage 18.1m 12 HERTFORDSTREET 26 Bank Hotel 49 21 21 Hotel 31
Shepherd Shepherd PH 19 17 17 MEWS 23 SHEPHERD STREET 17 3 17a 37
16 1 37 to 49 11 4 1 to 8 8 47 Vicarage Cinema 15 22 22 to 28 DERBY
DERBYSTST DERBYST DERBY DERBYST DERBY 6b 1 25 38 Works 6a 37
Interpark HouseInterpark HouseInterpark 2 5 301 to 311 30 Chy 20.2m
2 7 2 701 to 705705 6b 26 36 10 2to5 39a 7 to 9 Hotel Hotel
TREBECKSTREET TREBECKSTREET TREBECK 601 to 605605 23 2a Market 21a
to Christ 16 52 Club 1 38 33 22 8 Church 20 13 9 HERTFORD STREET 44
501 to 511 6 5 16.9m 14 20 21 29 15 Park 31 to 35 Curzon 17b 20 34
Fig. 1. Site Location PlanFig. 2. Park Lane Mews Hotel - as
Existing Fig. 3. Site Location Satellite Image Fig. 4. Aerial View
from South Fig. 5. Aerial View from North
2. PARK LANE MEWS HOTEL PROJECT ABOUT THE ARCHITECT
Stiff+Trevillion are an award-winning architectural practice with
over twenty-five years of experience working in the UK and mainland
Europe. The practice is a design-led studio with a varied workload,
ranging from masterplanning and mixed-use new buildings to high
quality interior design and private residential projects. Current
projects in Westminster include: Queens Apartments, W2 Westbourne
House, Westbourne Grove 55 Victoria Street, SW1 Regent House,
George Street, W1 40 Beak Street, Soho Other major London projects
include: 127-135 Sloane Street, Chelsea 15 Bishopsgate, City of
London 10-4 Pentonville Road, Islington Portobello Dock, London W10
One Valentine Place, London, SE1 ABOUT GENTING UK Genting UK is one
of the leading casino operators in the UK with 6 casinos in London.
ThisincludesCrockfordsClubonCurzonStreetinMayfair, which is one of
the oldest and most exclusive casinos in the world and attracts an
international clientele. The company also operates the exclusive
Colony Club on Hertford Street and Maxims Casino Club in
Kensington. Genting operates successfully in the UK in one of the
strictest gambling regimes in the world where security, compliance
and safety are of paramount importance. PROJECT BRIEF Having
acquired the Park Lane Mews Hotel and a number of adjoining
properties, Genting intend to redevelop the site to provide a very
high quality mixed-use development comprising a luxury boutique
hotel with a small exclusive casino, and private residential
apartments. The proposals are an evolution of the already consented
scheme for the redevelopment of the site. Fig. 6. Crockfords, 30
Curzon Street Fig. 7. The Colony Club, 24 Hertford Street Queens
Apartments, W2 10-4 Pentonville Road, Islington 131 Sloane Street
One Valentine Place, SE1 Regent House, George Street / Edgware Road
02 PROJECT TEAM 15 Bishopsgate, City of London
3. PARK LANE MEWS HOTEL PROJECT EXISTING BUILDINGS AND USES
PARK LANE MEWS HOTEL: The existing Park Lane Mews Hotel falls short
of modern day requirements for high-quality hotel accommodation:
Guest rooms are too small Floor-to-ceiling heights are too low
Entrances are cramped, communal dining & bar facilities are
inadequate back-of-house facilities are below standard. The
building fabric does not meet current energy efficiency levels,
while the building services have reached end-of life. The
architectural language is not of high quality, completed in a
pastiche style in the 1980s, and formed of a haphazard composition.
The existing service bay arrangement is inefficient, and forms a
blank section to the facade where there should be active frontage.
16 & 17 A MARKET MEWS 16 & 17 A Market Mews consists of a
series of parking garages at ground level with residential
accommodation above. The residential part of 16 & 17A Market
Mews is in a very poor state of repair. As per the permitted
scheme, It is proposed that this part of the site is redeveloped,
and changed from C3 Residential to C1 Hotel use. As part of this
element of the works, an off-street servicing and delivery area
would be provided at ground level, preferable to the existing
arrangements on Stanhope Row and to the rear of Shepherd Street.
The loss of residential use is proposed to be offset by the
part-conversion to residential use of 46 Hertford Street - please
see details below. 36 HERTFORD STREET 36 Hertford Street as
existing has C3 Residential Use. The property comprises five
storeys plus lower ground, split into 7 no. flats. The building is
Grade II Listed, but is in need of substantial renovation and
refurbishment works. As per the permitted scheme, it is proposed to
undertake these refurbishment works and to provide a number of
high-quality private apartments within. 37 HERTFORD STREET 37
Hertford Street as existing has C3 Residential use. The property
comprises four storeys plus lower ground, split into 6 no. flats.
As per the permitted scheme, it is proposed that this building is
redeveloped, in order that floor levels can be aligned with the
adjacent 36 Hertford Street, and therefore lift access can be
provided to serve all levels of the residential apartments to both
addresses. 46 HERTFORD STREET 46 Hertford Street as existing is a
period property in B1 Office use, converted from residential some
years ago. Comprises five storeys plus lower ground. 03 THE SITE
RENDERRENDER RENDER RENDER STONESTONESTONE SLOPING SLATE ROOF ROOF
LINE DEDUCED CHIMNEY PIPE BALCONY VENT DUCT SIGN HERITAGE SIGN SIGN
VENT VENT VENT VENT VENTVENT VENT VENTVENT VENT VENT VENT VENT VENT
VENT VENT VENTVENT BRICK BRICK BRICK BRICK BRICK VENT ELEVATION A-A
CHANGE OF ANGLE OF ELEVATION BASE LINE CHANGE OF ANGLE OF ELEVATION
BASE LINE BRICKBRICK STR BRICK BRICK BRICK BRICK STONE BRICK BRICK
BRICK BRICK BRICK BRICK RENDER NO VISUAL ACCESS DETAIL DEDUCED
DETAIL DEDUCED NO VISUAL ACCESS BRICK BRICK STONE SHUTTER DOOR VENT
CANOPY STONE STONE BRICK STONE STANHOPE ROW ELEVATION E-E ELEVATION
F-F MARKET MEWS ELEVATION J-J HERTFORD STREET STANHOPE ROW DETAIL
DEDUCED NO VISUAL ACCESS NO VISUAL ACCESS DETAIL DEDUCED BRICK
BRICK BRICKBRICK BRICKBRICK VENT VENT VENT VENT VENT VENT STONE
BRICK BRICK BRICK BRICK VENT VENT BALCONY RAILING PIPE STR STONE
STONE BALCONY PIPE VENT VENT RENDER RENDER RENDERRENDER NO VISUAL
ACCESS DETAIL DEDUCED SLOPING ROOF STACKSTACK RENDER STONE RENDER
RENDER STONE RENDER RENDER STONE NO VISUAL ACCESS DETAIL DEDUCED.
ROOF SLOPING SLOPING ROOFDETAIL DEDUCED. NO VISUAL ACCESS RENDER
RENDER STONE RENDER RENDER RENDER NO. 40 PANAMA HOUSE NO. 41 NO. 39
NO. 38NO. 37NO. 36 HERTFORD STREET ELEVATION G-G STANHOPE ROW
ELEVATION H-H SEE DRAWING 6409/02 FOR DETAILS. CHANGE IN ELEVATION
BASELINE ANGLE. CHANGE IN ELEVATION BASELINE ANGLE. SEE DRAWING
6409/02 FOR DETAILS. Fig. 8. Park Lane Mews Hotel - Elevation as
Existing with adjoining 36 Hertford Street Fig. 9. 36 & 37
Hertford Street - Elevation Fig. 10. 16 & 17 A Market Mews -
Elevation Fig. 11. Existing Park Lane Mews Hotel - View from Pitts
Head Mews Fig. 12. Existing Park Lane Mews Hotel - View from
Shepherd Street Fig. 13. 16 & 17 A Market Mews View as Existing
Fig. 14. 36 & 37 Hertford Street View facing Stanhope Row Fig.
15. 36 & 37 Hertford Street
4. PARK LANE MEWS HOTEL PROJECT Consent was granted on 4 March
2010 for application [09/09841/FULL] submitted by the previous
owner, Premio Group Holdings Ltd. This scheme proposed substantial
redevelopment of the site, Including: Demolition of the existing
buildings to: Park Lane Mews Hotel, 16 & 17 A Market Mews, 37
Hertford Street. New hotel building consisting of 6-storeys plus
lower ground and basement, incorporating larger but fewer hotel
rooms, dedicated restaurant facility, etc. Incorporation of the
rebuilt low-level Market Street block into hotel use, in order to
provide additional rooms plus an off-street servicing and delivery
bay Uppermost storey of the hotel block is a set-back penthouse
residential apartment, accessed from the 37 Hertford Street
entrance. Restoration / renovation / refurbishment and internal
modifications of the Grade II listed 36 Hertford Street to provide
new residential apartments, over five storeys plus lower ground
floor. Redevelopment of the site at 37 Hertford Street, to provide
five storeys plus lower ground floor. Re-built in order to match
the floor levels of the adjacent No. 36, in order to provide shared
accessible passenger lift and stairs to both properties. Associated
Public Realm improvements to Stanhope Row Fig. 16. Park Lane Mews
Hotel - Elevation to Stanhope Row - Permitted Scheme Internal
Arrangements As Permitted Basement Plan As Proposed Lower Ground
Floor Plan As Proposed Ground Floor Plan As Proposed First Floor
Plan As Proposed Second Floor Plan As Proposed Third Floor Plan As
Proposed Fourth Floor Plan As Proposed Fifth Floor Plan As Proposed
Roof Plan As Proposed Residential Hotel SharedHotel Restaurant 04
EXISTING PERMISSION Fig. 17. Park Lane Mews Hotel - Permitted
Scheme - View from Pitts Head Mews Fig. 18. Park Lane Mews Hotel -
Permitted Scheme - View from Hertford Street
5. PARK LANE MEWS HOTEL PROJECT PLANS AS PROPOSED GIA 375.597
sq m: SHARED GIA 181.139 sq m: C3 RESI ANCILLARY INTAKE AIR
BUILDING SERVICES PLANT AREA RESIDENTIAL BUILDING SERVICES - WATER
SERVICES - ELECTRICAL SWITCH ROOM - BOILERS & CALORIFIERS GOODS
LIFT 1600kg Car: 1100 x 2000mm Shaft: 1900 x 2400mm Door Opg:
1100mm GIA 562.688 sq m: BLOCK GEA 648.647 sq m: BLOCK GEA 209.002
sq m: C3 RESI GEA 440.344 sq m: SHARED 20 10m4 6 8BASEMENT PLAN AS
PROPOSED Scale: 1:100 1 Basement Plan As Proposed Lower Ground
Floor Plan As Proposed Ground Floor Plan As Proposed First Floor
Plan As Proposed Second Floor Plan As Proposed Third Floor Plan As
Proposed Fourth Floor Plan As Proposed Fifth Floor Plan As Proposed
Roof Plan As Proposed GIA 156.088 sq m: C1 HOTEL RESI NSA 81.356 sq
m: [2-BED DUPLEX] UNIT 2 RESI NSA 56.15 sq m: [2-BED DUPLEX] UNIT 1
WASTE& RECYCLING WASTE& RECYCLING CYCLE STORE CYCLE STORE
CYCLE STORE CYCLE STORE WASTE & RECYCLING 36HERTFORDSTREET
37HERTFORDSTREET HOTEL STAFF BACK-OF-HOUSE RESIDENTIAL SERVICE
LOBBY GEA 167.715 sq m: C3 RESI GIA 141.681 sq m: C3 RESI GEA
174.703 sq m: C1 HOTEL GIA 156.088 sq m: C1 HOTEL GIA 322.616 sq m:
C1 HOTEL GIA 25.484 sq m: C1 HOTEL GIA 208.287 sq m: SHARED GIA
28.515 sq m: C1 HOTEL SHOWERS NOT IN DEMISE CENTRAL KITCHEN WC'S
INTAKE AIR GIA 599.437 sq m: BLOCK HOTEL BREAKFAST & DINING
ROOM PAVEMENT LIGHTS OVERHEAD GEA 237.969 sq m: SHARED VOID ABOVE
BIKE STORAGE DISPENSEBAR WC'S WS WS GEA 642.604 sq m: BLOCK GEA
30.615 sq m: C1 HOTEL GOODS LIFT 1600kg Car: 1100 x 2000mm Shaft:
1900 x 2400mm Door Opg: 1100mm GEA 25.484 sq m: C1 HOTEL GEA
348.056 sq m: C1 HOTEL RESTAURANT SUBSTATION PLANTACCESS HATCHABOVE
LOWER GROUND PLAN AS PROPOSED Scale: 1:100 1 0 2 4 6 8 10 M
STANHOPE ROW MARKETMEWS HERTFORDSTREET 46 11 15 10 17 37 22 44 14
NIA 80.834 sq m: [2-BED RESI] UNIT 4 NIA 35.81 sq m: [2-BED DUPLEX]
UNIT 3 RESI NSA 53.09 sq m: [2-BED DUPLEX] UNIT 2 RESI NSA 37.877
sq m: [2-BED DUPLEX] UNIT 1 GEA 167.084 sq m: C3 RESI GIA 144.728
sq m: C3 RESI GIA 155.472 sq m: C3 RESI GEA 172.595 sq m: C3 RESI
GIA 104.29 sq m: SHARED GIA 2.38901e-06 sq m: CASINO GIA 15.641 sq
m: CASINO GIA 31.883 sq m: CASINO GIA 157.534 sq m: C1 HOTEL GIA
17.637 sq m: C1 HOTEL GIA 78.022 sq m: HOTEL & CASINO RECEPTION
GIA 19.595 sq m: SHARED GIA 28.832 sq m: SHARED GIA 19.902 sq m:
SHARED HOTEL & CASINO RECEPTION LINK ACCESS STORE EXISTING
GARAGENOT IN DEMISE INTAKE AIR GOODS LIFT 1600kg Car: 1100 x 2000mm
Shaft: 1900 x 2400mm Door Opg: 1100mm SHEPHERD MEWS PASSAGE
CONCIERGE HOTEL LOUNGE DELIVERIES
1280ltrEurobin1260(L)x985(W)1280ltrEurobin1260(L)x985(W) CASINO
LIFTLOBBY HOTEL LIFTLOBBY VOID FIRE EXIT FEATURE STAIR TO CASINO
RECEPTION STAFF GEA 81.02 sq m: HOTEL & CASINO RECEPTION GEA
32.961 sq m: SHARED GEA 166.728 sq m: C1 HOTEL GEA 199.784 sq m:
BLOCK GEA 325.822 sq m: BLOCK GEA 149.925 sq m: SHARED USE GEA
19.337 sq m: C1 HOTEL GIA 273.353 sq m: BLOCK GIA 186.367 sq m:
BLOCK GEA 49.024 sq m: CASINO 1280ltrEurobin1260(L)x985(W)
1280ltrEurobin1260(L)x985(W) 1280ltrEurobin1260(L)x985(W) REFUSE
PLANTACCESS HATCH SUBSTATIONVENT GROUND FLOOR PLAN AS PROPOSED
Scale: 1:100 1 0 2 4 6 8 10 M SHARED GIA 27.333 sq m: CASINO GIA
414.952 sq m: SHARED GIA 19.152 sq m: GIA 3.217 sq m: C1 HOTEL GIA
8.3 sq m: C1 HOTEL SHARED GIA 18.347 sq m: SALLE PRIV BAR GIA
488.688 sq m: BLOCK STORE GEA 8.3 sq m: C1 HOTEL GEA 3.217 sq m: C1
HOTEL GEA 452.261 sq m: CASINO GEA 541.81 sq m: BLOCK GEA 20.601 sq
m: SHARED GOODS LIFT 1600kg Car: 1100 x 2000mm Shaft: 1900 x 2400mm
Door Opg: 1100mm GEA 52.903 sq m: SHARED RESI NSA 52.157 sq m:
[2-BED DUPLEX] UNIT 3 RESI NSA 46.632 sq m: [1-BED RESI] UNIT 6
RESI NSA 109.492 sq m: [2-BED RESI] UNIT 5 36HERTFORDSTREET
37HERTFORDSTREET GEA 136.452 sq m: C3 RESI GIA 122.843 sq m: C3
RESI GIA 143.552 sq m: C3 RESI GEA 167.084 sq m: C3 RESI 20 10m4 6
8FIRST FLOOR PLAN AS PROPOSED Scale: 1:100 1 SHARED GIA 20.58 sq m:
HOTEL GIA 433.517 sq m: CASINOGIA8.5sqm: SHARED GIA 19.152 sq m:
SHARED GIA 10.725 sq m: ROOM AREA: 26m2 ROOM AREA: 27m2 ROOM AREA:
38m2 ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA:
29m2 ROOM AREA: 29m2 ROOM AREA: 31m2 ROOM 2.01ROOM 2.04 ROOM 2.03
SUITE 2.10 ROOM 2.02ROOM 2.05 ROOM 2.06 ROOM 2.07 ROOM 2.08 ROOM
2.09 LIFTLOBBY ROOM AREA: 53m2 STORE GEA 37.695 sq m: SHARED GEA
8.5 sq m: CASINO GIA 488.808 sq m: BLOCK GEA 20.532 sq m: SHARED
GEA 476.225 sq m: C1 HOTEL GEA 543.036 sq m: BLOCK GOODS LIFT
1600kg Car: 1100 x 2000mm Shaft: 1900 x 2400mm Door Opg: 1100mm
RESI NSA 52.551 sq m: [1-BED RESI] UNIT 9 RESI NSA 46.63 sq m:
[1-BED RESI] UNIT 8 RESI NSA 100.629 sq m: [3-BED RESI] UNIT 7 GEA
136.452 sq m: C3 RESI GIA 123.683 sq m: C3 RESI GIA 146.761 sq m:
C3 RESI SECOND FLOOR PLAN AS PROPOSED Scale: 1:100 1 0 2 4 6 8 10 M
HOTEL GIA 384.49 sq m: CASINOGIA8.251sqm: SHARED GIA 10.725 sq m:
SHARED GIA 20.58 sq m: SHARED GIA 19.152 sq m: GIA 442.619 sq m:
BLOCK ROOM AREA: 61m2 ROOM 3.01ROOM 3.02ROOM 3.03ROOM 3.04ROOM
3.05ROOM 3.06SUITE 3.07 SUITE 3.08 ROOM AREA: 53m2 LIFTLOBBY GEA
37.683 sq m: SHAREDGREEN ROOF VOID GEA 8.25 sq m: CASINO GEA 20.601
sq m: SHARED GEA 419.901 sq m: C1 HOTEL GEA 486.482 sq m: BLOCK
GOODS LIFT 1600kg Car: 1100 x 2000mm Shaft: 1900 x 2400mm Door Opg:
1100mm ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA:
29m2 ROOM AREA: 29m2 ROOM AREA: 31m2 RESI NSA 52.412 sq m: [1-BED
RESI] UNIT 12 RESI NSA 46.587 sq m: [1-BED RESI] UNIT 11 RESI NSA
116.617 sq m: [2-BED RESI] UNIT 10 GEA 136.452 sq m: C3 RESI GEA
162.108 sq m: C3 RESI GIA 124.335 sq m: C3 RESI GIA 143.532 sq m:
C3 RESI THIRD FLOOR PLAN AS PROPOSED Scale: 1:100 1 0 2 4 6 8 10 M
CASINOGIA8.251sqm: SHARED GIA 10.725 sq m: SHARED GIA 20.58 sq m:
HOTEL GIA 359.328 sq m: ROOM AREA: 24m2 GEA 37.748 sq m: SHARED
SHARED GIA 19.152 sq m: ROOM 4.2 ROOM 4.1 LIFTLOBBY ROOM 4.6ROOM
4.7 SUITE 4.9 ROOM AREA: 52m2 ROOM AREA: 31m2 ROOM AREA: 29m2 GEA
8.251 sq m: CASINO ROOM 4.3ROOM 4.4ROOM 4.5 GEA 20.601 sq m: SHARED
ROOM 4.8 ROOM AREA: 27m2ROOM AREA: 24m2 ROOM AREA: 24m2ROOM AREA:
24m2ROOM AREA: 24m2 GIA 417.776 sq m: BLOCK GEA 461.369 sq m: BLOCK
GEA 406.407 sq m: C1 HOTEL GOODS LIFT 1600kg Car: 1100 x 2000mm
Shaft: 1900 x 2400mm Door Opg: 1100mm NSA 145.091 sq m: [3-BED
RESI] UNIT 13 PENTHOUSE TERRACE GEA 131.578 sq m: C3 RESIDENTIAL
GEA 66.946 sq m: C3 RESIDENTIAL GIA 120.833 sq m: C3 RESI ENSUITE
BATH LIVING/ DINING BED 2 BED 3 BED 1 GIA 58.886 sq m: C3 RESI 20
10m4 6 8FOURTH FLOOR PLAN AS PROPOSED Scale: 1:100 1 HOTEL GIA
143.033 sq m: SHARED GIA 31.199 sq m: EXT TERRACE 69.642 sq m:
CASINO GIA 117.107 sq m: SHARED GIA 10.843 sq m: GIA 8.25 sq m: C1
HOTEL SHARED GIA 19.152 sq m: TERRACE GEA 356.95 sq m: BLOCK ROOM
AREA: 45m2 ROOM AREA: 53xm2 SALLE PRIV SUITE 5.1 SUITE 5.2 BLOCK
GIA 329.031 sq m: GEA 151.56 sq m: HOTEL GEA 137.506 sq m: CASINO
SALLE PRIV GEA 48.544 sq m: SHARED GEA 8.25 sq m: C1 HOTEL GEA
20.676 sq m: SHARED GREEN ROOF GOODS LIFT 1600kg Car: 1100 x 2000mm
Shaft: 1900 x 2400mm Door Opg: 1100mm GREEN ROOF GREEN ROOF
RESIDENTIAL PLANT ROOFLIGHT LIFT OVERRUN AOV/ ROOF ACCESS
MECHANICAL SMOKE VENT FIFTH FLOOR PLAN AS PROPOSED Scale: 1:100 1 0
2 4 6 8 10 M GREEN ROOF GREEN ROOF RESIDENTIAL PLANT ROOFLIGHT LIFT
OVERRUN AOV/ ROOF ACCESS MECHANICAL SMOKE VENT AOV AOV / ROOF
ACCESS HATCH BOILER FLUE DISCHARGES ABOVE ROOF LEVEL VIA ROOF COWL
KITCHEN EXTRACT DUCT DISCHARGES TO ATMOSPHERE AT ROOF LEVEL VIA
HIGH VELOCITY JET COWL ROOF MOUNTED LOW NOISE DRY AIR COOLER SKY
SATELLITE DISH 800MM ARABIC SATELLITE DISH 1200MM LIFT OVERRUN
PLANT ENCLOSURE GREEN ROOF GREEN ROOF GREEN ROOF 20 10m4 6 8ROOF
PLAN AS PROPOSED Scale: 1:100 1 Residential Hotel SharedHotel
Restaurant Casino PARK LANE MEWS HOTEL PROPOSALS The scheme as now
proposed is intended to match the high quality of the permitted
scheme. The design retains the overall massing and height of the
permitted scheme, with minor amendments to suit the new internal
layouts. The scheme as now proposed will also seek to retain the
philosophy of providing fewer, but larger high-quality hotel rooms,
with the inclusion of an improved hotel restaurant, and active
street frontage. The provision of residential apartments is
intended to match the unit type and size of the permitted scheme.
The works to 36 Hertford Street retain the existing features of the
listed building, while carrying out the necessary repairs and
refurbishment to provide residential accommodation to modern
standards. AMENDMENTS FROM PERMITTED SCHEME Incorporation of
ancillary casino use to the hotel. This includes making associated
internal arrangement alterations to suit the necessary licensing
requirements, including a separate public entrance and segregated
circulation. Number of hotel guest rooms is correspondingly reduced
from 44 to 29. Reduction in the amount of basement excavation
required. Provision of hotel use (lounge bar & external
terrace) to the set-back top storey of the hotel block, in place of
the residential penthouse apartment to the consented scheme.
Elevational changes to Park Lane Mews Hotel building Provision of
an enclosed external courtyard at first floor level to Market Mews,
to provide external space to the casino, while preventing any noise
breakout associated with an open terrace. The inclusion of
residential use within 46 Hertford Street to provide the required
additional residential area to meet Westminster policy. Some
amendments to the residential layouts and unit sizes within 36
& 37 Hertford Street. The unit numbers and mix will be
augmented through the inclusion of residential apartments to 46
Hertford Street. 05 PROPOSALS
6. PARK LANE MEWS HOTEL PROJECT Park Lane Mews Hotel -
Elevation to Stanhope Row - As Proposed AS EXISTING AS PERMITTED 1
2 34 5 6 5 7 8 MATERIALS KEY 1. 2. 3. 4. 5. 6. 7. 8. GLAZED
TERRACOTTA PLINTH BLACK ANODISED ALUMINIUM GLAZING PROJECTING
WINDOWS TO GUEST AREAS HAND-MADE FACING BRICKWORK PROFILED GLAZED
TERRACOTTA CLADDING DECORATIVE SPANDREL PANEL PPC ALUMINIUM BLACK
HORIZONTAL LOUVRES PPC ANODISED ALUMINIUM COPING AS EXISTING AS
PERMITTED 1 2 34 5 6 5 7 8 MATERIALS KEY 1. 2. 3. 4. 5. 6. 7. 8.
GLAZED TERRACOTTA PLINTH BLACK ANODISED ALUMINIUM GLAZING
PROJECTING WINDOWS TO GUEST AREAS HAND-MADE FACING BRICKWORK
PROFILED GLAZED TERRACOTTA CLADDING DECORATIVE SPANDREL PANEL PPC
ALUMINIUM BLACK HORIZONTAL LOUVRES PPC ANODISED ALUMINIUM COPING
Park Lane Mews Hotel - Elevation to Market Mews - As Proposed AS
EXISTING AS PERMITTED 2 2 4 4 5 6 8 9 MATERIALS KEY 1. 2. 3. 4. 5.
6. 7. 8. 9. GLAZED TERRACOTTA PLINTH BLACK ANODISED ALUMINIUM
GLAZING PROJECTING WINDOWS TO GUEST AREAS HAND-MADE FACING
BRICKWORK PROFILED GLAZED TERRACOTTA CLADDING DECORATIVE SPANDREL
AN BAY WINDOWS SIDE PANELS PPC ALUMINIUM BLACK HORIZONTAL LOUVRES
PPC ANODISED ALUMINIUM COPING SUBSTATION LOUVRES Park Lane Mews
Hotel - Elevation to Shepherd Mews - As Proposed AS EXISTING AS
PERMITTED 1 2 3 4 5 7 8 MATERIALS KEY 1. 2. 3. 4. 5. 6. 7. 8.
GLAZED TERRACOTTA PLINTH BLACK ANODISED ALUMINIUM GLAZING
PROJECTING WINDOWS TO GUEST AREAS HAND-MADE FACING BRICKWORK
PROFILED GLAZED TERRACOTTA CLADDING DECORATIVE SPANDREL PANEL PPC
ALUMINIUM BLACK HORIZONTAL LOUVRES PPC ANODISED ALUMINIUM COPING
Park Lane Mews Hotel - Short Section As Proposed Park Lane Mews
Hotel - Long Section As Proposed AS EXISTING AS PERMITTED 1 2 34 5
6 5 7 8 MATERIALS KEY 1. 2. 3. 4. 5. 6. 7. 8. GLAZED TERRACOTTA
PLINTH BLACK ANODISED ALUMINIUM GLAZING PROJECTING WINDOWS TO GUEST
AREAS HAND-MADE FACING BRICKWORK PROFILED GLAZED TERRACOTTA
CLADDING DECORATIVE SPANDREL PANEL PPC ALUMINIUM BLACK HORIZONTAL
LOUVRES PPC ANODISED ALUMINIUM COPING AS EXISTING AS PERMITTED 1 2
34 5 6 5 7 8 MATERIALS KEY 1. 2. 3. 4. 5. 6. 7. 8. GLAZED
TERRACOTTA PLINTH BLACK ANODISED ALUMINIUM GLAZING PROJECTING
WINDOWS TO GUEST AREAS HAND-MADE FACING BRICKWORK PROFILED GLAZED
TERRACOTTA CLADDING DECORATIVE SPANDREL PANEL PPC ALUMINIUM BLACK
HORIZONTAL LOUVRES PPC ANODISED ALUMINIUM COPING As Existing As
Proposed 235022502500 2850 2250 2600 2350 2350 26002600 44392170
400350350 15004900 2850 400 2600 35024005002400500 600
32508004003600 1500 BASEMENT 10.000 LOWER GND 14.000 GND (STANHOPE
ROW) 18.450 1ST FLOOR 21.750 2ND FLOOR 25.050 3RD FLOOR 28.050 4TH
FLOOR 31.050 5TH FLOOR 34.250 PARAPET 37.500 28502600257528502600
33003300300030003200 2600 PLANT ENCL. 38.500 GND (MARKET STREET)
17.500 335044504000 950 1500 36003500425 2300700 GND (STANHOPE ROW)
18.450 GND (SHEPHERD ST) 17.660 SECOND FLOOR GUEST ROOMS FIRST
FLOOR CASINO GROUND FLOOR RECEPTION LOWER GROUND HOTEL RESTAURANT /
LOUNGE BAR BASEMENT PLANT AREA THIRD FLOOR GUEST ROOMS FOURTH FLOOR
GUEST ROOMS FIFTH FLOOR SALLES PRIVES GUEST SUITES TERRACE ROOF
PLANT BASEMENT 10.000 LOWER GND 14.000 GND (STANHOPE ROW) 18.450
1ST FLOOR 21.750 2ND FLOOR 25.050 3RD FLOOR 28.050 4TH FLOOR 31.050
5TH FLOOR 34.250 PARAPET 37.500 28502600257528502600
33003300300030003200 2600 PLANT ENCL. 38.500 GND (MARKET STREET)
17.500 335044504000 950 1500 36003500425 2300700 18.560 - GND (36
HS) 22.260 - 1ST (36 HS) 26.000 - 2ND (36 HS) 29.150 - 3RD (36 HS)
32.100 - 4TH (36 HS) 16.000 - LOWER GND EXISTING 15.500 - LOWER GND
PROPOSED 35.590 - PARAPET 36.153 - PLANT ENCLOSURE 35.265 - RIDGE
33.400 - PARAPET (36 HS) ELECTRICAL SUBSTATION SHARED PLANT ROOM
HOTEL RESTAURANT STAFF FACILITIES DELIVERY BAY HOTEL / CASINO
RECEPTION CASINO PASSAGE TO MARKET MEWS HOTEL ROOMS CASINO SALLES
PRIVE HOTEL ROOMS STORAGE BACK-OF HOUSE HOTEL LOUNGE HOTEL ROOMS
HOTEL ROOMS 20 10m4 6 8 SECTION AA Scale: 1:50 HOTEL CASINO
RESIDENTIAL SHARED / ANCILLARY EXISTING OUTLINE PERMITTED OUTLINE
USE CLASSES Residential Hotel SharedHotel Restaurant Casino Park
Lane Mews Hotel Sections As Proposed 06 DESIGN
7. PARK LANE MEWS HOTEL PROJECT 1 2 3 5 6 7 PARK LANE MEWS
HOTEL BAY STUDY AS PROPOSED The facade design for the project is
intended to reference the surrounding fabric of Mayfair, through
the use of brickwork as the main material. The brickwork is
supplemented by the use of shaped glazed terracotta bays, which
will lend colour, luxury and interest to the facade. The window
bays are tall and generous, mimicking the proportions of the
surrounding historic Georgian fabric.
Decorativemetalworkisaddedtothewindowbaystogiveinterestandrichness.
A ground floor level plinth of glazed terracotta gives strength and
robustness at street level. WINDOW BAY STUDY ROOF: PRE-PATINATED
ZINCFACING BRICKWORK : LIGHT-COLOURED CHARCOAL-FIRED BRICK GLAZING
FRAMING: PATINATED METAL INSET PANELS: PROFILED GLAZED TERRACOTTA
GLAZED TERRACOTTA: DETAILED TEXTURE GROUND FLOOR PLINTH: GLAZED
TERRACOTTA FAIENCE DECORATIVE SPANDREL PANEL 1 2 3 4 5 6 7 1 3 7 6
6 5 PARK LANE MEWS HOTEL WINDOW BAY STUDY AS PROPOSED PLMH GUEST
ROOMS: WINDOW SEAT WITH SHUTTERS SKETCH FAADE DETAILS 07 FACADE
DESIGN 36 Hertford Street is a listed building. The proposals
include retaining and refurbishing the existing fabric - in
particular the decorated plaster of the internal grand stair. To
the facade, the existing render is to be removed, and the brickwork
to be repaired and blackened, as per some typical Mayfair
townhouses. 37 Hertford Street is not listed, and is to be rebuilt,
as per the existing consent. The new frontage is to be in-keeping
with the surrounding buildings, mimicking the door and windows. The
rebuilding is necessary to enable disabled access and building
services to be provided to both buildings, and to bring the
building fabric up to modern standards.
8. PARK LANE MEWS HOTEL PROJECT PARK LANE MEWS HOTEL: VIEWS
FROM STANHOPE ROW AS EXISTING AS PROPOSED AS EXISTING AS PROPOSED
PARK LANE MEWS HOTEL: VIEWS FROM PITTS HEAD MEWS 08 PERSPECTIVE
VIEWS 1
9. PARK LANE MEWS HOTEL PROJECT PARK LANE MEWS HOTEL: VIEWS
FROM SHEPHERD STREET AS EXISTING AS PROPOSED AS EXISTING AS
PROPOSED PARK LANE MEWS HOTEL: VIEW FROM MARKET MEWS 09 PERSPECTIVE
VIEWS 2
10. PARK LANE MEWS HOTEL PROJECT AERIAL VIEW FROM SOUTH-WEST
AERIAL VIEW FROM NORTH-WEST AERIAL VIEW FROM NORTH-EAST AERIAL VIEW
FROM SOUTH-EAST 10 AERIAL VIEWS
11. PARK LANE MEWS HOTEL PROJECT Park Lane Mews Hotel Access
Routes Diagram As Proposed DRAWING NU SCALES: DRAWN: DRAWING TIT
PROJECT: CLIENT: REV. Notes: 151605/A/01 . DRAWING NUMBER: SCALES:
DRAWN: CHECKED: REVISION: DATE: DRAWING TITLE: PROJECT: CLIENT:
REV. DETAILS DRAWN DATECHECKED Notes: Servicing Vehicle Routes
Vehicle Drop-off Pedestrian Access ACCESS & SERVICING Access
for hotel residents and casino guests will by via the main entrance
on Stanhope Row there will be no rear entrance on Shepherd Street.
Hotel guests arriving by vehicle will be via Pitts Head Mews and
Stanhope row, involving a drop-off zone outside the hotel frontage,
as per the existing arrangements. The exit route is via Hertford
Street, connecting back to the inner ring road at Park Lane. Hotel
deliveries are to be made via Market Mews. A dedicated off-street
servicing bay is to be built to replace the garages to the existing
mews building. The delivery bay will cater for 2no. panel vans or
Luton-type box vans. Refuse collection for the hotel will also be
made via Market Mews. A dedicated off-street refuse and recycling
store will be incorporated into the design. OPERATION &
MANAGEMENT The casino operation will be governed by a stringent
Operation Management Plan. Genting have considerable experience of
operating casinos in residential areas, and we pay great respect to
the needs of the local residents. Entry to the casino will be
controlled and limited to members, their guests, hotel residents
and guests of the management. All members will receive a copy of
the management plan in their welcome packs and are required to
adhere to it. The anticipated volume of members and guests will be
very low as it will be an exclusive venue. The casino will run a
complimentary valet service, allowing cars to be parked in local
car parks. The drivers of these vehicles are trained to deliver an
efficient and discrete service. A small discreet smoking area has
been included in the building design for members and guests to use
when required and will prevent anyone smoking outside of the
building. 5.885 0.72 3.7 4.6t Light Van Overall Length 5.885m
Overall Width 2.000m Overall Body Height 2.526m Min Body Ground
Clearance 0.299m Track Width 1.765m Lock to Lock Time 4.00s Kerb to
Kerb Turning Radius 6.000m DRAWING NUMBER: SCALES: DRAWN: CHECKED:
REVISION: DATE: DRAWING TITLE: PROJECT: CLIENT: REV. DETAILS DRAWN
DATECHECKED Notes: 151605/AT/A01 . Swept Path Analysis - Panel Van
Entry 5.885 0.72 3.7 4.6t Light Van Overall Length 5.885m Overall
Width 2.000m Overall Body Height 2.526m Min Body Ground Clearance
0.299m Track Width 1.765m Lock to Lock Time 4.00s Kerb to Kerb
Turning Radius 6.000m 151605/AT/A02 . DRAWING NUMBER: SCALES:
DRAWN: CHECKED: REVISION: DATE: DRAWING TITLE: PROJECT: CLIENT:
REV. DETAILS DRAWN DATECHECKED Notes: 8.01 1.21 4.25 7.5t Box Van
Overall Length 8.010m Overall Width 2.100m Overall Body Height
3.556m Min Body Ground Clearance 0.351m Track Width 2.064m Lock to
Lock Time 4.00s Kerb to Kerb Turning Radius 7.400m 151605/AT/C02 .
DRAWING NUMBER: SCALES: DRAWN: CHECKED: REVISION: DATE: DRAWING
TITLE: PROJECT: CLIENT: REV. DETAILS DRAWN DATECHECKED Notes: 10.4
1.25 5 1.4 10.4m Large Refuse Vehicle (3 axle) Overall Length
10.400m Overall Width 2.500m Overall Body Height 3.814m Min Body
Ground Clearance 0.366m Track Width 2.500m Lock to Lock Time 4.00s
Kerb to Kerb Turning Radius 9.350m DRAWING NUMBER: SCALES: DRAWN:
CHECKED: REVISION: DATE: DRAWING TITLE: PROJECT: CLIENT: REV.
DETAILS DRAWN DATECHECKED Notes: 151605/AT/D01 . 10.4 1.25 5 1.4
10.4m Large Refuse Vehicle (3 axle) Overall Length 10.400m Overall
Width 2.500m Overall Body Height 3.814m Min Body Ground Clearance
0.366m Track Width 2.500m Lock to Lock Time 4.00s Kerb to Kerb
Turning Radius 9.350m 151605/AT/D02 . DRAWING NUMBER: SCALES:
DRAWN: CHECKED: REVISION: DATE: DRAWING TITLE: PROJECT: CLIENT:
REV. DETAILS DRAWN DATECHECKED Notes: 5.885 0.72 3.7 4.6t Light Van
Overall Length 5.885m Overall Width 2.000m Overall Body Height
2.526m Min Body Ground Clearance 0.299m Track Width 1.765m Lock to
Lock Time 4.00s Kerb to Kerb Turning Radius 6.000m DRAWING NUMBER:
SCALES: DRAWN: CHECKED: REVISION: DATE: DRAWING TITLE: PROJECT:
CLIENT: REV. DETAILS DRAWN DATECHECKED Notes: 151605/AT/A01 . Swept
Path Analysis - Panel Van Exit 5.885 0.72 3.7 4.6t Light Van
Overall Length 5.885m Overall Width 2.000m Overall Body Height
2.526m Min Body Ground Clearance 0.299m Track Width 1.765m Lock to
Lock Time 4.00s Kerb to Kerb Turning Radius 6.000m 151605/AT/A02 .
DRAWING NUMBER: SCALES: DRAWN: CHECKED: REVISION: DATE: DRAWING
TITLE: PROJECT: CLIENT: REV. DETAILS DRAWN DATECHECKED Notes: Swept
Path Analysis - Refuse Van Entry 10.4 1.25 5 1.4 10.4m Large Refuse
Vehicle (3 axle) Overall Length 10.400m Overall Width 2.500m
Overall Body Height 3.814m Min Body Ground Clearance 0.366m Track
Width 2.500m Lock to Lock Time 4.00s Kerb to Kerb Turning Radius
9.350m DRAWING NUMBER: SCALES: DRAWN: CHECKED: REVISION: DATE:
DRAWING TITLE: PROJECT: CLIENT: REV. DETAILS DRAWN DATECHECKED
Notes: 151605/AT/D01 . Swept Path Analysis - Refuse Van Exit 10.4
1.25 5 1.4 10.4m Large Refuse Vehicle (3 axle) Overall Length
10.400m Overall Width 2.500m Overall Body Height 3.814m Min Body
Ground Clearance 0.366m Track Width 2.500m Lock to Lock Time 4.00s
Kerb to Kerb Turning Radius 9.350m 151605/AT/D02 . DRAWING NUMBER:
SCALES: DRAWN: CHECKED: REVISION: DATE: DRAWING TITLE: PROJECT:
CLIENT: REV. DETAILS DRAWN DATECHECKED Notes: 11 OPERATIONAL
MANAGEMENT Prepared by Vectos
12. PARK LANE MEWS HOTEL PROJECT STANHOPEROW
CHESTERFIELDGARDENS H ALF M O O N STR EET MARKET MEWS STANHOPE GATE
WHITEHORSESTREET Shepherd Hire CURZON GATE C LAR G ES STR EET
HAMILTON MEWS Shepherd Market Horse Ride PARK LANE HAMILTONPLACE
Broad PARK LANE OLD PARK LANE GRANTHAM PLACE SQUARE QUEENSTREET PAR
K TREBECKSTREET LANE CURZON SQUARE Market SOUTHAUDLEYSTREET MARKET
HERTFORD STREET PARKLANE PITT'S HEAD BRICK STREET SHEPHERD
HERTFORDSTREET MEWS DOW N STREET AUDLEY M EW S ACHILLES WAY DEANERY
MEWS CARRINGTONSTREET TILNEY STREET YARMOUTH PLACE PARKLANE
CHESTERFIELDSTREET DOW N STREET CURZON STREET Cycle SHEPHERD STREET
DEANERYSTREET DERBYST Station PICCADILLY Cycle Hire Station Subway
Posts CURZON STREET ACCESS ROUTE 1 ACCESS ROUTE 2 EXIT STANHOPEROW
CHESTERFIELDGARDENS H ALF M O O N STR EET MARKET MEWS STANHOPE GATE
WHITEHORSESTREET Shepherd Hire CURZON GATE C LAR G ES STR EET
HAMILTON MEWS Shepherd Market Horse Ride PARK LANE HAMILTONPLACE
Broad PARK LANE OLD PARK LANE GRANTHAM PLACE SQUARE QUEENSTREET PAR
K TREBECKSTREET LANE CURZON SQUARE Market SOUTHAUDLEYSTREET MARKET
HERTFORD STREET PARKLANE PITT'S HEAD BRICK STREET SHEPHERD
HERTFORDSTREET MEWS DOW N STREET AUDLEY M EW S ACHILLES WAY DEANERY
MEWS CARRINGTONSTREET TILNEY STREET YARMOUTH PLACE PARKLANE
CHESTERFIELDSTREET DOW N STREET CURZON STREET Cycle SHEPHERD STREET
DEANERYSTREET DERBYST Station PICCADILLY Cycle Hire Station Subway
Posts CURZON STREET ACCESS ACCESS ROUTE 2 EXIT ROUTE1 PEROW H ALF M
O O N STR EET MARKET MEWS WHITEHORSESTREET Shepherd Hire C LAR G ES
STR EET Shepherd Market CE QUEENSTREET TREBECKSTREET Market MARKET
HERTFORD STREET BRICK STREET SHEPHERD HERTFORDSTREET DOW N STREET M
EW S CARRINGTONSTREET YARMOUTH PLACE CHESTERFIELDSTREET DOW N
STREET CURZON STREET Cycle SHEPHERD STREET Station PICCADILLY BO
LTO N STREET ACCESS ROUTE 2 Issues & Revisions Rev Date Details
of issue / revision RevDrw Birmingham | 0121 233 3322 Leeds | 0113
233 8000 Manchester | 0161 233 4260 London | 020 7407 3879
Nottingham | 0115 924 1100 www.bwbconsulting.com BWB Ref: Date:
Scale@A0: Drawn: Reviewed: Drawing Status Project - Originator -
Zone - Level - Type - Role - Number Status
P1PLMH-BWB-SGN-ZZ-DR-S-0001 PRELIMINARY R Gokool R Lowenthal
LNS2157 ACCESS ROUTE FOR SITE A PARK LANE MEWS HOTEL GENTING UK PLC
NTS06.07.15 P1 06.07.15 Preliminary Issue RLRSG Notes 1. Do not
scale this drawing. All dimensions must be checked/ verified on
site. If in doubt ask. 2. This drawing is to be read in conjunction
with all relevant architects, engineers and specialists drawings
and specifications. 3. All dimensions in millimetres unless noted
otherwise. All levels in metres unless noted otherwise. 4. Any
discrepancies noted on site are to be reported to the engineer
immediately. Key Plan Legend SITE A - PARK LANE MEWS HOTEL SITE B -
46 HERTFORD STREET
AdraftConstructionManagementPlanhasbeendevelopedtoaddress the
Health & Safety, Environmental and Quality Requirements for the
construction phase of the project. The plan will be developed to
consider all necessary measures required to minimise the effect of
the construction works on the surrounding buildings, roads and to
the public, to include: Adequate signage Parking restrictions
Phasing of deliveries Restricting noise and dust Planning and
Environmental Officers will be consulted to discuss and agree
traffic management and logistics, and for granting of the necessary
licenses. Programme and phasing requirements will be finalised
prior to works commencing. Newsletters will be prepared and
circulated to local residents and businesses to introduce the
construction team, and provide key contact details, and set out key
work activities in order to promote good local relationships.
OUTLINE METHODOLOGY The key challenges of the project are: Safe
demolition with consideration to neighbours Construction within
tight site constraints Management of ground water due to high water
table Delivery of materials, distribution & craneage
Installation of major plant and timing of such installs There is a
double-level basement which will involve specialised temporary
works. These will be designed by specialist engineers, and be
undertaken by suitably experienced contractors. SITE SET UP An
application will be made to create site accommodation within a
portion of the retained building. SECURITY Site hoardings, fencing
and lockable gates will be erected in accordance with the site
logistics plan, subject to approval. Safety and directional signage
will be appropriately erected to warn pedestrians and motorists of
construction activity PEDESTRIAN ACCESS Site pedestrian access and
egress routing will be clearly signed and segregated from all site
hazards. The footpath on the east side of Stanhope Row will be
closed off and alternative routing clearly signed. DELIVERIES AND
TRANSPORT Access and egress from the site will be via Pitts Head
mews from the A4142 (Park Lane) and via Down Street from the A4
(Piccadilly). A primary loading area has been identified on
Stanhope Row. Construction traffic will be carefully managed and
controlled in Stanhope Row at all times by marshalling staff. The
existing circular one-way system will be utilised to ensure ease or
traffic flow and avoidance of congestion. Loading and unloading
during these stages will mainly be in Stanhope Row, whilst
maintaining through-access for other vehicles and reducing impact
to surrounding residential properties on other roads. The
refurbishment of 46 Hertford Street involves significantly less
work with smaller vehicles and far fewer deliveries. Similar access
points can be used as for the main redevelopment but will utilise
an alternative egress route via Curzon Street. Unrestricted access
and egress is to be maintained at all times for local residents.
Deliveries will be scheduled so as not to arrive during school
start and home times, nor during the peak traffic hours of between
0800-0900 and 1700-1800. SUBSTRUCTURE / BASEMENT CONSTRUCTION The
ground floor slab will be progressively removed and the existing
basement backfilled to provide a level platform for piling works.
Piles will be installed around the perimeter to support retained
earth and to enable the reduced level dig. Internal columns will be
supported on bored concrete piles within the basement footprint.
Following installation of waterproofing, works can commence
installingthebasementslab,columnsandbasementperimeterwalls, which
will then support the Ground Floor Slab and superstructure.
Vehiclescarryingdemolitionandexcavationmaterialsshallbesuitably
sheeted to minimise dust being released. Additional measures such
as water spraying may be deployed to reduce dust from site being
blown around. Vehicle wheel / body washing facilities will be
provided and used as required. STRUCTURAL FRAME The frame
construction will be reinforced concrete with post- tensioned
slabs. This technique minimises the quantity of concrete required
and reduces the number of deliveries. The uppermost level will be
constructed using a structural steel frame which can be pre-
fabricated off-site to minimise installation time. ENVELOPE AND
ROOF The installation of the external facade will be completed
floor by floor moving up the building. The external envelope will
be installed early in the programme to provide weatherproofing and
so that internal fitout works will be able to proceed unhindered.
The roof installation will be commenced as soon as the roof slab is
complete. Prepared by BWB Consulting Construction Vehicles Access
Routes - Main Site Construction Vehicles Access Routes - Site B
Fig. 19. Structural zones Fig. 20. Street zones 12 CONSTRUCTION
MANAGEMENT MARKETMEWS HERTFORDSTREET STANHOPE ROW No 36 HERTFORD
STREET LISTED GRADE II BUILDING TO BE RETAINED AND REFURBISHED
EXISTING BUILDINGS TO BE DEMOLISHED SITE BOUNDARY STRUCTURAL ZONES
NOT TO SCALE MARKETMEWS HERTFORDSTREET STANHOPE ROW No 36 HERTFORD
STREET LISTED GRADE II BUILDING TO BE RETAINED AND REFURBISHED
EXISTING BUILDINGS TO BE DEMOLISHED SITE BOUNDARY STANHOPE ROW
MARKETMEWS HERTFORDSTREET MOTORCYCLE PARKING BAYS VEHICLE LOADING /
UNLOADING AREA CAR PARKING BAYS PAVEMENT CLOSURE / HOARDING AREA
CAR PARKING BAYS Issues & Revisions Rev Date Details of issue /
revision ww BWB Ref: Date: Drawn: Re Drawing Status Project -
Originator - Zone - Level - Type - R PLMH-BWB-SGN-ZZ-D PRELIMINARY
R Gokool LNS2157 ACCESS ZONES PARK LANE ME GENTING UK PL 06 P1
06.07.15 Preliminary Issue Notes 1. Do not scale this drawing. All
dimensio on site. If in doubt ask. 2. This drawing is to be read in
conjuncti engineers and specialists drawings an 3. All dimensions
in millimetres unless no metres unless noted otherwise. 4. Any
discrepancies noted on site are to immediately. Key Plan Legend
STRUCTURAL ZONES NOT TO SCALE STREET ZONES NOT TO SCALE P2 07.07.15
Parking bay annotations rev
13. PARK LANE MEWS HOTEL PROJECT GENTING ENVIRONMENTAL POLICY
Genting is committed to proactively managing and minimising its
environmental impact through the adoption of a corporate strategy.
As a minimum, Genting will meet all legislative environmental
targets and will endeavour to adopt best practice wherever
practicable. We have always believed that it is the responsibility
of the corporate and individual citizen to play their part and we
want and will make every effort to ensure we protect our
environment for our local communities and beyond and in doing so we
can make a positive contribution to a sustainable future both
locally and nationally The Park Lane Mews Hotel project aims to
consider environmental issues and translate them into construction
with the intention to provide an efficient building with minimal
energy demand and low pollution levels. The aim is to provide
facilities which support the needs of the current population,
without hindering both the natural and existing built environment,
for future populations. CLIMATE CHANGE The Proposed Development
aims to achieve a reduction in CO2 emissions by enhancing the
thermal performance of the building and by using low or zero carbon
technologies wherever possible. POLLUTION Actions shall be
implemented throughout construction to reduce the potential
negative impacts on water, and air, to minimise disturbance to the
surrounding areas. In addition, the design of the building shall be
undertaken in a way which negates or reduces the impact of
pollution during its operation. DESIGN The Proposed Development
shall be designed in a manner which minimises the risk of crime.
The site shall be designed securely and advice shall be sought from
a Security Officer. This seeks to ensure a safe working environment
and ensure that the site is safe and accessible. The layout of the
site shall be designed to provide safe access for pedestrians and
cyclists and cycle storage facilities shall be provided that are
safe and secure. Delivery vehicles shall have dedicated access
areas to avoid disruption to the local transport network. OPERATION
AND MANAGEMENT It is inevitable that any new building, throughout
both construction and occupation, will impact upon the existing
natural and built environment. The development aims to control this
impact through careful monitoring of energy and water consumption
and waste production throughout both construction and operation
phases. A management strategy shall be established at the handover
of the development to ensure the correct operation and use of the
building, so that it is used in the most effective and efficient
manner. This strategy shall include training and walk-rounds, as
well as the production of a non-technical user guide, alongside the
technical manuals provided in accordance with the building
regulations. The critical part of any low energy building is to see
the occupier is fully cognisant with the means of controlling
energy use. BREEAM BREEAM is the worlds leading and most widely
used environmental assessment method for buildings. It sets the
standard for best practice in sustainable design and has become the
de facto measure used to describe a buildings environmental
performance. The Proposed Development aims to use BREEAM to qualify
its environmental and sustainable performance. Credits are then
awarded and added together to produce a single overall score. A
rating is then achieved based on a scale of Pass, Good, Very Good,
Excellent and Outstanding. BREEAM aims are to: To mitigate the
impacts of buildings on the environment; To enable buildings to be
recognised according to their environmental benefits; To ensure
best environmental practice is incorporated in buildings; The
development aims to achieve BREEAM certification and a rating of
Excellent, the equivalent to a score of 70 %. THE LONDON PLAN The
London Plan is the overall strategic plan for London, setting out
an integrated economic, environmental, transport and social
framework for the development of London over the next 2025 years.
The London Plan establishes the framework for the development and
use of land in London,
linkinginimprovementstoinfrastructure;settingoutproposalsforimplementation,coordination
and resourcing; and helping to ensure joined up policy delivery by
the Greater London Authority Group of organisations. The London
Plan promotes the principle that there should be equality of
opportunity for all people, and to: Reducing health inequality and
promoting Londoners health Climate change and the consequences of
climate change Achieving sustainable development in the United
Kingdom The London Plan deals only with things of strategic
importance to Greater London however Local councils are encouraged
to follow the policies set out in the London Plan. BUILDING DESIGN
The London Plan requirements utilise the strategy detailed in the
Chartered Institution of Building Services Engineers Design Guide
A, which details the Fabric First approach to constructing
intrinsically low energy buildings. The fabric first approach
examines both the thermal energy use and the regulated electrical
energy use, determining the optimum performance of the building
fabric in combination with the electrical energy used to light the
internal space and provide power for the mechanical systems
controlling temperature and air quality within the building.
Computational Fluid Dynamic (CFD) modelling software will be used
as the design tool to determine the optimum thermal performance of
the building, balancing heat losses, heat gains and indoor air
quality with the construction of the building envelope and the
extent of renewable technologies used. RENEWABLE TECHNOLOGIES
Westminster City Council requires all major developments to
maximise on-site renewable energy generation to achieve a 20%
carbon emission reduction, via its policy S40. For the proposed
development there are a number of strategies available to utilise
such as: Solar Thermal for domestic hot water production Combined
Heat and Power (CHP) systems Photovoltaic Panels for electricity
production One or more of these renewable energies shall be
selected based on optimising the carbon emission reduction of the
proposed development. Park Lane Mews Hotel - Thermal Simulation
Model Sample Energy Performance Certificate / BREEAM 13
SUSTAINABILITY Prepared by Engineering Services Consultancy Ltd The
fabric first approach examines both the thermal energy use and the
regulated electrical energy use, determining the optimum
performance of the building fabric in combination with the
electrical energy used to light the internal space and provide
power for the mechanical systems controlling temperature and air
quality within the building. Computational Fluid Dynamic (CFD)
modelling software will be used as the design tool to determine the
optimum thermal performance of the building, balancing heat losses,
heat gains and indoor air quality with the construction of the
building envelope and the extent of renewable technologies used. R
E N E W A B L E T E C H N O L O G I E S Westminster City Council
requires all major developments to maximise on-site renewable
energy generation to achieve a 20% carbon emission reduction, via
its policy S40. For the proposed development there are a number of
strategies available to utilise such as: Solar Thermal for domestic
hot water production Combined Heat and Power (CHP) systems
Photovoltaic Panels for electricity production One or more of these
renewable energies shall be selected based on optimising the carbon
emission reduction of the proposed development. Baseline Building,
built to exceed the requirements of Building Regulations,
maximising the building envelope performance. Utilise systems to
service the building which are highly energy efficient and which
are controlled to suit the use pattern of the building. Consider
the use of renewable energy equipment to generate some or all of
the resulting energy demand of the building Fig. 21. Indicative
roof-mounted photovoltaic array Fig. 23.Indicative solar thermal
collectors Fig. 22.Indicative semi-intensive green roof
14. PARK LANE MEWS HOTEL PROJECT THANK YOU Thank you for
attending this public exhibition. We hope that you have found this
information useful. To summarise, these proposals will: Provide a
finely designed building that responds to the architectural
character of the Mayfair. Re-provide a high-quality hotel suitable
for the requirements of the West End hotel trade. Provide a
well-managed entertainment use that is respectful of the
residential nature of the area. Improve the infrastructure of the
hotel, ensuring it meets environmentally sustainable for years to
come. NEXT STEPS: We will shortly be submitting a planning
application to Westminster City Council to seek permission to
redevelop the site. PROGRAMME: The timetable below sets out the
anticipated key dates for the project: Summer 2015: Planning
application submitted to Westminster City Council Winter 2015:
Anticipated date for a planning decision Summer 2016: Construction
work starts Winter 2018: Construction period complete Park Lane
Mews Hotel & No. 36 Stanhope Row: View from Hertford Street As
Proposed 14 THANK YOU FEEDBACK To ensure that we understand the
views of the local community, we would be grateful if you could
take a few moments to fill in a feedback form to let us know your
thoughts. The feedback form can be completed and left with staff or
sent back to us later using the FREEPOST address. CONTACT DETAILS
If you have any further questions or would like more information,
please contact us at: T: 020 3697 4385 E:
[email protected] Westminster City Council
will also consult residents, businesses and the local community as
part of the application process. Westminsters officers will collate
all feedback received to form part of their report to the planning
committee any feedback given here will be passed to Westminster
City Council as part of the application.