049 Communication, Constructability and high productivity

Embed Size (px)

Citation preview

Page 1: 049 Communication, Constructability and high productivity

[email protected]://www.construction-productivity.co.uk

Page 2: 049 Communication, Constructability and high productivity
Page 3: 049 Communication, Constructability and high productivity
Page 4: 049 Communication, Constructability and high productivity

There are different communication instruments, such

as: e-mail document telephone meeting contracts specifications reports manuals schedules calculations

Page 5: 049 Communication, Constructability and high productivity

drawings computer files Disks print-outs photographs agenda’s and minutes of meetings The management of documentation and

communication used in a project is used by a number of subcontractors, the storage and retrieval thereof for further use.

Page 6: 049 Communication, Constructability and high productivity

STANDARDISATION OF COMMUNICATION The main purpose of standardisation is to

develop a specific level of conformity. This process of standardisation has certain

advantages for the management of a project, such as:

Less different documents. Revised drawings overtake the other

drawings. Records are easy to handle.

Page 7: 049 Communication, Constructability and high productivity

Standardisation contributes to increased productivity.

The documents and communication from one project to the next are the same or similar.

Therefore less confusion is created.

Page 8: 049 Communication, Constructability and high productivity

Constructability is the integration of construction expertise into all phases of the project.

For Improving factors such as: cost schedule quality and overall project objectives.

Page 9: 049 Communication, Constructability and high productivity

The proper use of the knowledge gained by participants such as:

managers designers site workers other contributors Learning from their past experience

increases the level of productivity/project success.

Page 10: 049 Communication, Constructability and high productivity

Constructability must be used at key points in the project life cycle. This includes:

in the planning phase; early in the design phase; prior to the procurement phase; prior to the mobilization phase for construction.

Page 11: 049 Communication, Constructability and high productivity

Constructability is defined as-the use of construction knowledge and experience in areas such as:

Planning; Design; Procurement; and site operations.

To achieve overall project objectives.

Page 12: 049 Communication, Constructability and high productivity
Page 13: 049 Communication, Constructability and high productivity
Page 14: 049 Communication, Constructability and high productivity

HighProductivity

Page 15: 049 Communication, Constructability and high productivity

SinglePoint

ofcontactDrawings

Page 16: 049 Communication, Constructability and high productivity
Page 17: 049 Communication, Constructability and high productivity

Constructability

Remove

Riskcontrol Conflict

Longdurationsactivities

DisruptionsDelays

Finderrors

etc.

Strategy

Schedulelogic

Mistakes inconstruction

sequence

Projectcomplexity

Projectfutures

Dimensions

Marital

Standardize

Activitieshard

tocontrol

Information(MIS )

Communication at all levels

Strategy

Schedulelogic

PlanningDesign-prefabrication

procurementSite operation