Under Construction:Preservation Concerns During Construction and Renovation

LYRASIS Preservation ServicesFunded in part by a grant from the National Endowment for the Humanities, Division of

Preservation and Access.

Unit 3

Page 2: under construction unit 3

Unit 3– Preparing Materials for Moving– Protecting Collection in Situ– Protecting Buildings and Collections– Collection Dangers

Page 3: under construction unit 3

Preparing Materials for Moving• What supplies you use to prepare your

items for moving will depend in part on how long they will be wrapped around materials and how far you are traveling.

Page 4: under construction unit 3

Preparing Materials for Moving• Are you moving from one floor to another, or

across the country?• Are you moving the materials into a new building,

or are you moving the collections off-site while you renovate the space you are in?

• If the latter, how long will the materials stay wrapped up?

• Moving projects can provide institutions with an opportunity to provide more appropriate housings for their materials.

Page 5: under construction unit 3

Preparing Materials for Moving• Shrink-wrap is a popular method of

protecting materials in transport.– If the items are sealed completely for long

periods of time, they may trap harmful gases and further the deterioration process. If using shrink wrap, be sure to poke a few holes in the wrap to allow for air cirulation.

Page 6: under construction unit 3

Preparing Materials for Moving• There are many options for moving books. If you

are moving them a short distance, it may be easiest just to load them onto book trucks. Some people stretch wrap the book carts to protect against the books falling off in transport. If the volumes are especially fragile, consider boxing them, either in individual boxes to create a protective micro-climate that will be useful long after the move, or in a bigger box with other books. If boxing books into larger boxes, place volumes spine down, and do not stack multiple layers on top of each other. Tie items with detached boards together with cotton twill tape to protect the text block and keep pieces together.

Page 7: under construction unit 3

Preparing Materials for Moving• When moving unbound paper-based

collections, rehouse the items in damaged, acidic or non-standard boxes into boxes that meet the ANSI Z39.48 standard for permanent paper and boards. Tape boxes shut – this will prevent them from falling open in transport. Before taping closed, add any necessary spacers to prevent items from bending or falling out of files. Multiple boxes can be moves at one time using flatbed hand truck, but be careful not to stack them too high – you do not want the lower boxes to be crushed under the excessive weight from the boxes stacked upon them. If you are moving the boxes by truck, you may want to consider stretch wrapping the boxes onto pallets.

Page 8: under construction unit 3

Preparing Materials for Moving• Artifacts may need special protection. Fragile

items may be wrapped in bubble wrap on a temporary basis. If planning on permanently protecting the object, consider polyester batting or polyethylene foam bags that will not off-gas. Some fragile materials may need to be hand-carried.

• Map cases can be moved with oversized materials inside if the items are placed between corrugated cardboard to protect the items from shifting. You may tie or tape the cardboard together. As long as you plan on removing the cardboard immediately, you do not have to worry about using board that meets the Z39.48 standard for permanent paper. The cases can the be wrapped to keep the drawers closed.

Page 9: under construction unit 3

Preparing Materials for Moving• Another option is to put oversized items in large

map folders and place in specially constructed pallet boxes. Rolled items can be stored and moved in rectangular telescoping archival boxes. Through your institution, you may have access to a carpentry shop that may be able to fabricate carts to transport your oversized materials.

• Consider hand-carrying fragile items. Glass plate negatives and lantern slides should be clearly labeled as such. Place sheets of bubble wrap at the beginning and end of boxes of glass plate negatives. Hand carry or stretch wrap to prevent boxes from moving.

Page 10: under construction unit 3

Preparing Materials for Moving• Be especially careful when

handling nitrate materials because they can be flammable. Disposal and transport of nitrate must adhere to local, state, and federal regulations regarding hazardous materials. For more information on storage and handling of nitrate materials see the standard from the National Fire Protection Association. NFPA 40: Standard for the Storage and Handling of Cellulose Nitrate Film.

• http://www.nfpa.org/

Page 11: under construction unit 3

Protecting Collections In Situ• If you decide not to move your collections,

you need to decide early on how your are going to protect them from damage and debris. You have several options.

• Your decision will be influenced by:– the scope and pace of the construction– the need to access the collections during the

construction process– your resources

Page 12: under construction unit 3

Protecting Collections In Situ• One way is to build barriers or temporary

walls around construction zones or around the stack areas to minimize the dust and other construction pollutants. You must make this decision early on in the bid process or it will end up costing you more money.

• Another option is to hang tarps or drapes or sheets – whatever material you use, make sure that they are flame retardant.

Page 13: under construction unit 3

Protecting Collections In Situ• Sealed wraps extend from top of each shell unit

to the floor, and wall-to-wall. You can gain emergency access to volumes on the shelves by slitting the wraps and using duct tape to reseal, but if you choose the method, you should be prepared for reduces access. Slit the wraps too many times and they will no longer function effectively.

• Polyethylene sheeting will reduce (although probably will not eliminate) dust and protect from potential leaks from sprinklers.– You do not want the sheeting to be too tight, or it could

turn into a breeding ground for mold if there is no air circulation in the area!

Page 14: under construction unit 3

Protecting Collection In Situ• Protective enclosures may be created

for specific items. If there are collections that require boxing, this may be a good time to address those needs. Boxing can protect materials that are being moved as well as provide a good microenvironment for materials near a construction area.

Page 15: under construction unit 3

Protecting Collection In Situ• Be prepared for routine services to

be interrupted so that staff can make time to protect collections. If you are only wrapping the shelves that are in the immediate vicinity of current construction, make sure that construction officials give you advance notice (at least 48 hours) so that you have time to protect the next area before they move into it.

Page 16: under construction unit 3

Protecting Collections In Situ • Do not test your HVAC system without

covering the collections first, or dust, grit, and grime may spread throughout the building. Even with all these protections, construction-related dirt is so pervasive that it is impossible to keep it completely away from your materials, so plan on cleaning the areas regularly.

Page 17: under construction unit 3

Protecting the Building and Collections

• Fire• Water Damage• Environment• Insects and pests• Mold• Interruptions in

service• Theft

ALL of these are concerns during renovation and construction projects. The next slides will examine these potential hazards.

Page 18: under construction unit 3

Protecting the Building and Collections

• The Northeast Document Conservation Center has created a checklist for protecting collections from destructive factors at the end of their Technical Bulletin: Protecting Collections During Renovation.

• http://www.nedcc.org/free-resources/preservation-leaflets/3.-emergency-management/3.9-protecting-collections-during-renovation

Page 19: under construction unit 3

Fire• The prevention of fires begins with fire

safety education, not just for the staff but for the construction crew as well. Make sure that everyone knows where fire extinguishers are located and how to use them.

• Hire construction workers that are certified and follow codes for electricity, HVAC, and other building standards.

Page 20: under construction unit 3

Fire• Inspect alarm systems before

construction begins and test systems weekly during construction. If possible, improve alarm systems and fire suppression equipment before any construction activities begin that use heat-producing or electrical equipment in collection spaces.

• Ensure that interruptions in services (e.g. electrical work) do not interfere with fire detection and suppression.

Page 21: under construction unit 3

Fire• Finally, dust barriers protecting collections

should be fire-retardant in case a fire does break out. For more information on fire protection during construction, see guidelines in the National Fire Protection Association Code 909: Code for the Protection of Cultural Resources Properties – Museums, Libraries, and Places of Worship

• http://www.nfpa.org/codes-and-standards/document-information-pages?mode=code&code=909

Page 22: under construction unit 3

Water• Water damage is a common

occurrence during construction projects.

• The risk of water damage goes up whenever workers are altering water line or using water for some aspect of the construction job, so it is important to identify vulnerable areas and take precautions.

Page 23: under construction unit 3

Water• Bad weather and human error can cause water

damage, and uncontained water in your building can be both the cause and the result of fires. For example, water draining into fixtures can result in a fire.

• Other sources of water damage can come from steam pipes, pressurized water lines, toilet drains, etc. Roof and skylight replacement, installation of pipes, fan coils, sprinklers, the excavation or replacement of plumbing are flooding hazards.

Page 24: under construction unit 3

Water• Before a construction crew begins to work

on a part of the roof, give staff 48 hours notice so that staff can protect areas below by installing water-proof sheeting as temporary barriers to prevent water from draining onto collections or moving collections away from the area. Roofs must be protected against water infiltration at the end of each day by covering the areas they are working on – sheets and tarps do not provide adequate protection unless secured at joints with drainage routes.

Page 25: under construction unit 3

Water• To prevent damage from flooding,

store collections at least four inches off the floor.

• Install water alarms in vulnerable areas. Water alarms are electronic disks or cables that can be laid on floors or attached to walls that are activated when a circuit is completed by moisture. Water alarms should be audible and some can be tied into other alarm systems.

Page 26: under construction unit 3

Water• If a water disaster should occur,

know where the main pipes are located so that they can be turned off in an emergency. Be sure to update the contact information for services that might be useful, such as freezer facilities and dehumidification services. Finally, be sure to hold regular staff training sessions in water salvage procedures.

Page 27: under construction unit 3

Environment• Construction projects can create an

environment that puts your collections at risk. Projects can generate lots of dust, which can abrade collections and speed up the deterioration of materials. HVAC systems can further spread that dust around. Dust can also settle into carpets.

• In order to protect collections, you may need to adjust current housekeeping procedures to compensate. After each section is completed, plan for a complete shelf-by-shelf, item-by-item clean-up.

Page 28: under construction unit 3

Environment• A related environmental concern is

damage and inconveniences of noise.

• Pavement breakers, jack hammers, and circular saws can not only disrupt patrons and staff, but also create vibrations that can cause materials to move off of shelves and allow dust, plaster, and sawdust to fall onto collections.

Page 29: under construction unit 3

Environment• Institutions need to compensate for

extremes in temperature that might occur during construction projects. Contracts should stipulate requirements for temporary heat if working in subzero climates to keep space a few degrees above freezing; if painting, the temperature should be increased to 60-65 degrees F. Temporary heat must be created to prevent freezing of building materials that contain moisture, such as concrete, mortar, plaster, and adhesives, as well as to reduce the chance that pipes will freeze.

Page 30: under construction unit 3

Environment• Other ways to compensate against the

cold include using insulating blankets and space heaters, although you will have to be careful that the latter will not start fires.

• Covering exposed areas can help compensate against both hot and cold temperatures.

Page 31: under construction unit 3

Environment• Some problems can be reduced by

stipulating requirements in your contract to minimize their effect on people and collections. Be aware that you do not want specifications so tight that the contract is too expensive.– For example, it may be better to clean a few

thousand books than stipulate a dust-free environment that requires a much higher bid; just make sure you budget for the cleaning. Or budget to protect the books in the first place, by removing them or placing them in protective enclosures.

Page 32: under construction unit 3

Insects and Pests• It is especially important that you practice

integrated pest management during construction and renovation. Doors will be open more than usual; there may be temporary walls and holes providing pests with easy route into the building. Therefore, regular monitoring is needed so that you can contain a problem before it gets out of control. Peat strips should be placed at all entry points and monitored weekly.– Regular housekeeping is an essential

component of integrated pest management.

Page 33: under construction unit 3

Insects and Pests• Make sure that food containers are

disposed of promptly and not left overnight in construction areas. Trash may fill up and need to be emptied more often.

• Openings should be screened with mesh fine enough to keep out small rodents.

• Consider exterior building treatments. They may be slightly hazardous within the outside environment, but it may also reduce the need for inside treatments, which could harm collections and people.

Page 34: under construction unit 3

Mold: the Three Main Components • High Temperature

• High Humidity

• Poor Air Circulation

You never want to see this in your collection!!

Page 35: under construction unit 3

Mold• Construction projects can leave collections

vulnerable to mold, especially when an institution suffers from water damage. Mold thrives in areas with sustained high temperatures, high humidity, and poor air circulation. Although you may not be able to control the temperature or humidity during renovation, you may be able to stop mold growth by ensuring that the collections areas have good air circulation.

Page 36: under construction unit 3

Mold• If the HVAC system is shut off during

construction, as long as you have electricity in the area you set up fans to help circulate air. This will prevent mold spores from settling and growing on your collections.

Page 37: under construction unit 3

Unit 3 QuizWhat Have You Learned?

Page 38: under construction unit 3

Unit 3• Question 1: What is a popular and most

cost effective method of protecting books during transport?– A: Custom Enclosures– B: Shrink Wrap– C: Security Guards– D: Moving Truck

Page 39: under construction unit 3

Unit 3• Question 1: What is a popular and most

cost effective method of protecting books during transport?– Answer: B: Shrink Wrap

• Shrink wrapping material is a low-expense method of protecting books, and thus, quite popular! Just be sure there are some vents in the shrink wrap to prevent off-gassing build up.

Page 40: under construction unit 3

Unit 3• Question 2: What’s wrong with this

picture?

Page 41: under construction unit 3

Unit 3• Question 2: What’s wrong with this

picture?– Answer: Overloaded outlet

• As much as 25% of fires at cultural institutions are caused by construction or renovation. Bad wiring, welding or cutting torches, temporary electrical connections, or even the smoking habits of contractors are common sources of construction-related fires. Other sources include heaters, mechanical equipment, installation of HVAC systems, roof replacement, plumbing, paint removal, masonry removal, and duct work. Smoke and soot can chemically damage collections – often it is impossible to remove all residual soot, so working to prevent the fires from happening in the first place is an important activity in safeguarding your collections.

Page 42: under construction unit 3

Unit 3• Question 3: Water leaks are the most

common occurrence during construction, resulting in damage and even fire.– True or False?

Page 43: under construction unit 3

Unit 3• Question 3: Water leaks are the most

common occurrence during construction, resulting in damage and even fire.– Answer: True

• Risk of water damage is high during construction. Look to take preventative steps and remain alert of the risks during the project.