48
May 2014 1

Trig classroom readiniess 2014 - 15 Tim Hall

  • Upload
    jimwenz

  • View
    413

  • Download
    4

Embed Size (px)

DESCRIPTION

Presentation by Tim Hall on the 2014/2015 Trig program

Citation preview

Page 1: Trig classroom readiniess 2014 - 15 Tim Hall

May 2014

Page 2: Trig classroom readiniess 2014 - 15 Tim Hall

2

Technology Readiness Infrastructure Grant (TRIG)Presenter: Tim Hall, TRIG Project Director

How does Classroom Readiness fit into TRIG?

May 2014

Page 4: Trig classroom readiniess 2014 - 15 Tim Hall

4May 2014

Page 5: Trig classroom readiniess 2014 - 15 Tim Hall

http://sampleitems.smarterbalanced.org/itempreview/sbac/index.htm

May 2014

Page 6: Trig classroom readiniess 2014 - 15 Tim Hall

6

Technology Readiness Infrastructure Grant Overview

Technology Readiness in Michigan

www.22itrig.org

May 2014

Page 7: Trig classroom readiniess 2014 - 15 Tim Hall

7

Technology Readiness Infrastructure Grant

State School Aid 2012-13

Focus:

The development or improvement of a district’s technology infrastructure, including, but not limited

to, hardware and software, in preparation for the planned implementation in 2014-2015 of online

growth assessments

May 2014

Page 8: Trig classroom readiniess 2014 - 15 Tim Hall

8

Technology Readiness Infrastructure Grant Goals

Develop and implement collaborative, purchasing arrangements for statewide network services and personal learning and assessment

devices.

Establish sustainable, cost effective collaborations for sharing technology and data-related services to assist schools and districts to

become “test ready.”

Build the capacity of educators at ISDs, public school districts, and PSAs to effectively plan and implement online assessments and “Any

Time, Any Place, Any Way, Any Pace” learning.

Competitively award a whole-school technology pilot with a focus on economic and demographic diversity.

May 2014

Page 9: Trig classroom readiniess 2014 - 15 Tim Hall

9

• Rural Northern Michigan Consortium (Copper Country ISD)

• Intra-Michigan Consortium (Wexford-Missaukee ISD)

• Greater Michigan Educational Consortium (Genesee ISD)

• Kent ISD Consortium (Kent ISD)

• Southwest Michigan Consortium (Kalamazoo RESA)

Consortium Leadership

May 2014

Page 10: Trig classroom readiniess 2014 - 15 Tim Hall

10

Statewide ActivitiesConnectivity

State Education Network (SEN) Design

SEN Build

Collaborative Services

Data Systems Integration

Device Purchasing

E-Rate

Professional Learning

MI Technology Readiness Assessment Tool (MTRAx)

Assessment and Curriculum

Classroom Readiness

May 2014

Page 11: Trig classroom readiniess 2014 - 15 Tim Hall

Collaborative Services

Data Systems Integration

Device Purchasing

E-Rate

Statewide Activities

11

Connectivity

State Education Network (SEN) Design

SEN Build

Professional Learning

Operations Office

MI Technology Readiness Assessment

Tool (MTRAx)Assessment and

Curriculum

Classroom Readiness

Page 12: Trig classroom readiniess 2014 - 15 Tim Hall

Vision – SEN

To have all of K-12 Buildings in the state have zero limits on bandwidth usage and seamless access to data center services

To make sure all students in the state have the resources needed to be technology ready for their future

May 2014

Page 13: Trig classroom readiniess 2014 - 15 Tim Hall

13

In Progress - SEN

Mapping of interconnected network to support reliable, unencumbered access to online assessments to build network

Establishing a statewide education network entity structure to work collaboratively will all ISD’s in making decisions that are cost effective

May 2014

Page 14: Trig classroom readiniess 2014 - 15 Tim Hall

14

Map – ISDs

May 2014

Page 15: Trig classroom readiniess 2014 - 15 Tim Hall

15

Map – ISD’s Connect

May 2014

Page 16: Trig classroom readiniess 2014 - 15 Tim Hall

16

Map – Districts Connect

May 2014

Page 17: Trig classroom readiniess 2014 - 15 Tim Hall

17

Map - Schools Connect

May 2014

Page 18: Trig classroom readiniess 2014 - 15 Tim Hall

Collaborative Services

Data Systems Integration

Device Purchasing

E-Rate

Statewide Activities

18

Connectivity

State Education Network (SEN) Design

SEN Build

Professional Learning

Operations Office

MI Technology Readiness Assessment

Tool (MTRAx)Assessment and

Curriculum

Classroom Readiness

Page 19: Trig classroom readiniess 2014 - 15 Tim Hall

Vision – Data Integration

To streamline the use of educational information statewide related to common data & common solutions

May 2014 19

Page 20: Trig classroom readiniess 2014 - 15 Tim Hall

Successes – Data Integration

Identified pilot hosting locations

Trained ISD/Vendor programmers to create connectors

Selected Ed-Fi as a common exchange format and data hub database

Identified 26 pilot locations

May 2014 20

Page 21: Trig classroom readiniess 2014 - 15 Tim Hall

21

Data Service Integration Pilot District Locations

May 2014

Page 22: Trig classroom readiniess 2014 - 15 Tim Hall

22

Ed Fi

Dashboard

Data Warehouses

SIS Systems

PowerSchool

MISTAR/Zangle

Skyward

Edupoint Synergy

Infinite Campus

SunGard eSchoolPlus

MEAP / ACT / MME / Online State Assessments

Ancillary Systems

LibraryFood Service

TransportationDirectory Services

EmailAlert Systems

State ReportingUIC

Special EducationSystems

Import Assessments Directly 22

Cockpit

Data Hub

Data Hub Conceptual Model

May 2014

Page 23: Trig classroom readiniess 2014 - 15 Tim Hall

Vision – Device Purchasing

To make instructional technology affordable for all MI K-12 districts through a Statewide Device Purchasing Program

To ensure that all have the capability to participate in online assessments and high quality online learning experiences

To develop a self-sustaining program by 2016

May 2014 23

Page 24: Trig classroom readiniess 2014 - 15 Tim Hall

Successes – Device Purchasing

Generated over $15,000,000 in savings through 2013 statewide Device Purchasing• Reduced cost over educational list price• Incentive payment• Vendor sponsored professional development

Provided $30,000,000 in direct benefits such as:• Direct funds• Cost savings• Incentives on devices

May 2014 24

Page 25: Trig classroom readiniess 2014 - 15 Tim Hall

25

In Progress - Device PurchasingNext purchase window April 2014 – July 2014

Devices eligible for incentives finalized $7,000,000 has been set aside for incentives

May 2014

Page 26: Trig classroom readiniess 2014 - 15 Tim Hall

Vision – E-Rate

To provide cost savings for districts to acquire the Internet Access bandwidth needed for online assessments

May 2014 26

Page 27: Trig classroom readiniess 2014 - 15 Tim Hall

Benefits – E-Rate

Drive costs down as low as possible

Simplify E-Rate filing

Make sure all legal assurances are met

Maximize E-Rate benefits for schools

May 2014 27

Page 28: Trig classroom readiniess 2014 - 15 Tim Hall

Successes – E-Rate

Produced Michigan Fall NSLP E-Rate report

Supplied program integrity insurance for MI School districts

Provided Statewide E-Rate Training for Local Districts and Consultants

May 2014 28

Page 29: Trig classroom readiniess 2014 - 15 Tim Hall

Collaborative Services

Data Systems Integration

Device Purchasing

E-Rate

Statewide Activities

29

Connectivity

State Education Network (SEN) Design

SEN Build

Professional Learning

Operations Office

MI Technology Readiness Assessment

Tool (MTRAx)Assessment and

Curriculum

Classroom Readiness

Page 30: Trig classroom readiniess 2014 - 15 Tim Hall

Vision – MI Technology Readiness Assessment (MTRAx)

To provide districts a method to measure their readiness for

online testing

For MTRAx to become the Technology Planning Tool Statewide• Infrastructure• Instructional and• Other data required to facilitate meaningful technology plans

May 2014 30

Page 31: Trig classroom readiniess 2014 - 15 Tim Hall

Successes – MTRAx

Implemented the statewide roll out of the Michigan Technology Readiness Assessment Tool - MTRAx

May 2014 31

Page 32: Trig classroom readiniess 2014 - 15 Tim Hall

In Progress - MTRAx

State Technology Plans• Design new

process• Develop

enhancements• Pilot testing• Statewide

rollout

Low Effort Data Collection• Selection of

Toolset• Integrate into

MTRAx• Pilot testing• Statewide

rollout

Functional/Usability Enhancements• Identification of

functional requirements

• Develop enhancements in MTRAx

• Pilot testing• Statewide

rollout

Enhancement Reporting• MTRAx reporting

capabilities• Independent

survey and analysis

• Budget reporting to TRIG Operations Office

May 2014 32

Page 33: Trig classroom readiniess 2014 - 15 Tim Hall

Vision – Assessment and Curriculum

Provide Schools with knowledge, skills, and resources to use data from assessment to inform instructions and support

student learning.

May 2014 33

Page 34: Trig classroom readiniess 2014 - 15 Tim Hall

Successes – Assessment and Curriculum

Working with Michigan Assessment Consortium (MAC)

Facilitated webinars showing teachers’ strategies to improve instruction by using student data

May 2014 34

Page 35: Trig classroom readiniess 2014 - 15 Tim Hall

In Progress – Assessment and CurriculumWebinars are being housed on mistreamnet.org and the links are also available on 22itrig.org

May 2014 35

Page 36: Trig classroom readiniess 2014 - 15 Tim Hall

Vision – Classroom Readiness

Prepare MI Educators to increase their technology proficiency

Plan and implement online assessments

Provide “Any Time, Any Place, Any Way, Any Pace” learning

May 2014 36

Page 37: Trig classroom readiniess 2014 - 15 Tim Hall

37

Classroom Readiness

May 2014

Page 38: Trig classroom readiniess 2014 - 15 Tim Hall

38

5-4-3-2-1

The pieces needed to facilitate anytime, any place, anyway, any pace learning.

The five innovations needed to facilitate technology based initiatives that will transform Michigan’s education system for long

term success.

May 2014

Page 39: Trig classroom readiniess 2014 - 15 Tim Hall

39May 2014

Page 40: Trig classroom readiniess 2014 - 15 Tim Hall

40May 2014

Page 41: Trig classroom readiniess 2014 - 15 Tim Hall

41May 2014

Page 42: Trig classroom readiniess 2014 - 15 Tim Hall

42May 2014

Page 43: Trig classroom readiniess 2014 - 15 Tim Hall

43May 2014

Page 44: Trig classroom readiniess 2014 - 15 Tim Hall

44

Teacher Technology Training (T3) Course

May 2014

Learning Objectives:Know how to access the resources available to educators in

MI to assist with tech readiness

Understand how to use the materials and resources available in this course

Make connections with a variety of educational portals and experts to enhance classroom instruction and online test

readiness

Transfer the learning to professional practice by ensuring educators in MI are improving technology proficiency and

local district readiness for online assessments

Page 45: Trig classroom readiniess 2014 - 15 Tim Hall

Statewide ActivitiesConnectivity

State Education Network (SEN) Design

SEN Build

Collaborative Services

Data Systems Integration

Device Purchasing

E-Rate

Professional Learning

MI Technology Readiness Assessment Tool (MTRAx)

Assessment and Curriculum

Classroom Readiness

May 2014 45

Page 46: Trig classroom readiniess 2014 - 15 Tim Hall

Questions?

May 2014 46

Page 47: Trig classroom readiniess 2014 - 15 Tim Hall

Contact Information:

Tim HallTechnology Readiness Infrastructu re Grant Project

Directorthall@ gomasa.org

Jan VogelTechnology Readiness Infrastructure Grant

Project Coordinatorjvogel@ gomasa .org

May 2014

Page 48: Trig classroom readiniess 2014 - 15 Tim Hall

May 2014