Asmah Bt. Hamim P60159 Noor Hazlin Bt. Abd Rahim P60840 Public Transport Study for Public Transport Study for Kajang Kajang – Bangi Bangi – Putrajaya Putrajaya – Bandar Seri Putra Bandar Seri Putra - Nilai Nilai Group Project: Group Project:

Public Transport Study

Embed Size (px)

DESCRIPTION

Public Transport Study in Kajang - Bangi - Putrajaya - Bandar Seri Putra - Nilai

Citation preview

Page 1: Public Transport Study

Asmah Bt. Hamim P60159Noor Hazlin Bt. Abd Rahim P60840

Public Transport Study for Public Transport Study for KajangKajang–– BangiBangi–– PutrajayaPutrajaya––Bandar Seri Putra Bandar Seri Putra -- NilaiNilai

Group Project:Group Project:

Page 2: Public Transport Study

ObjectivesObjectives To study public transport demand in Kajang – Bangi – Putrajaya – Bandar Seri

Putra – Nilai corridor.

To determine the most desired line for public transport between the zones that

connecting the corridor.

To propose the suitable and sustainable public transportation system in the

corridor.

Page 3: Public Transport Study

Study AreaStudy Area

Page 4: Public Transport Study

Existing Road LinkageExisting Road Linkage

North-South Expressway

(PLUS Highway)

Kajang Silk HighwayLekas Highway

Grandsaga Highway

SKVE Highway

Page 5: Public Transport Study

Existing Public TransportExisting Public Transporta. Bus & Taxi Services

ii) Perhentian Bas & Teksi Nilaii) Hentian Kajang (Jln. Reko)

iii) Putrajaya Sentral

Page 6: Public Transport Study

b. KTM Komuter

Study Area

KTM Komuter Route Map

Page 7: Public Transport Study

c. Taxi

Kajang Taxi Terminal

Page 8: Public Transport Study

Public Transport Problems StatementPublic Transport Problems Statement Lack of public transport integration, existing buses is outdated, have poor-

accessibility especially in the Kajang and Bangi area.

Unsuitable location for Kajang Town bus stop point.

Page 9: Public Transport Study

Public Transport Problems StatementPublic Transport Problems Statement Main public transport terminal is far from komuter station and it’s shared

between Kajang and Bangi.

Putrajaya location is far away from other facilities. No public transport to

connect between nearest places (Kajang and Bangi) and Putrajaya.

Services of KTM Komuter are bad.

KTM Komuter station condition cannot accommodate the increasing

passenger’s demands. It has very limited parking.

Page 10: Public Transport Study

Public Transport Problems StatementPublic Transport Problems Statement Public transportation services unavailable at Bandar Seri Putra.

No public transport services to Nilai 3 and no terminal at Nilai 3 except mini

bus.

Page 11: Public Transport Study

Recommended Action PlansRecommended Action PlansAction 1: Traffic Management

Intersection 2

Intersection 1

Two Intersections at Jalan Reko

Page 12: Public Transport Study

Intersection 1 Intersection 2

Traffic congestion happened at these two intersections especially on peak hours.

Extending the slip road lane to SILK Highway from UKM without using traffic light and

introducing turn left from highway to Kajang without using traffic signal will reduce

the congested and safety to user.

Page 13: Public Transport Study

Roundabout 1

Roundabout 2

Two Roundabouts Nearby Seksyen 15, Bangi

The introduction of traffic signal control at this roundabout, will allow the right turning

maneuvers to be accommodated at this important location especially during evening peak.

It is can reduce the extent of circuitous trips undertaken on this section of the

urban road network.

Page 14: Public Transport Study

Recommended Action PlansRecommended Action PlansAction 2: Central Area Bus Management Scheme

Objectives of scheme

Improve the accessibility of bus services Encourage bus usage

Page 15: Public Transport Study

Recommended Action PlansRecommended Action Plans

Bus lane

Bus Lane Route

Jln. Reko

Jln. Mendaling Jln. Besar

Jln. Stadium

Jln. Cheras

Jln. Sg. Chua Jln. Semenyih

Page 16: Public Transport Study

Recommended Action PlansRecommended Action Plans- Jalan Bukit must restrict to other type of vehicle except bus, school bus

and taxi.

- Relocation of the bus station and taxi stand from Jalan Besar to Jalan

Bukit nearby Kajang KTM Station

Proposed new location for BRT Transit Central and taxi stand

Page 17: Public Transport Study

Traffic ModellingTraffic ModellingTrip Generation

Trip Distribution

Modal Split

Trip Assignment

Page 18: Public Transport Study

Trip AssignmentTrip Assignment

Kajang-Bangi

(87,824)/

(100,164)

Bangi-Putrajaya

(59,585)/

(74,651)

Putrajaya-Bdr Seri Putra

(32,250)/

(42,313)

Bdr Seri Putra-Nilai

(16,251)/

(11,717)

Page 19: Public Transport Study

Long Term Public Transport PlanLong Term Public Transport Plan

Light Rail Transit (LRT)

- Double-line LRT from Kajang to

Bandar Baru Bangi, Putrajaya,

Bandar Seri Putra and Nilai.

Page 20: Public Transport Study

LLiight Rapid Transit (LRT)ght Rapid Transit (LRT)At Kajang KTM Komuter

Station

Near Seksyen 7

Near Hulu Langat District

Office

Near Sg. Merab

NearAlamanda, Putrajaya

Near Kg. Teras Jernang

Near Pekan Bangi

Near Bandar Seri Putra

At Batang Benar KTM Komuter

Station

At Nilai KTM Komuter Station

LRT Route and Stations

Page 21: Public Transport Study

Bus Rapid Transit (BRT)Bus Rapid Transit (BRT)

Near Kajang KTM Komuter(proposed BRT Transit

Central)

Near Satay Hj. Samuri

At Hentian Kajang, Jln. Reko

In front Plaza Metro Kajang

Near intersection Jalan7/1

Near Metro Point

Near Kajang Police Station

Near Kajang Specialist Hospital

BRT Route and Stations at Kajang Town

Page 22: Public Transport Study

Bus Rapid Transit (BRT)Bus Rapid Transit (BRT)

BRT Route and Stations at Nilai

Near Nilai KTM KomuterStation

Near Nilai 3

Near Nilai Impian

Near NilaiIndustrial Area

Page 23: Public Transport Study

Bus Rapid Transit (BRT)Bus Rapid Transit (BRT)

BRT Stop

BRT Transit Central

Page 24: Public Transport Study

Feeder BusFeeder BusFeeder bus services are designed to pick up passengers in a certain locality, and

take them to a transfer point where they make an onward journey on a trunk service.

Provide bus service to LRT and KTM station. In this study, feeder bus proposed to

zones that have LRT services; Nilai, Bandar Sri Putra, Putrajaya, Bandar Baru Bangi

and Kajang. Feeder buses may act as part of a wider local network, or a regional

coach network.

Page 25: Public Transport Study

3. near Hulu Langat District

Office

5. near Sg. Merab

4. nearAlamanda, Putrajaya

6. near Kg. Teras Jernang

7. near Pekan Bangi

8. Near Bandar Seri Putra

9. at Batang Benar KTM Komuter Station

10. at Nilai KTM Komuter

Station

2. near Nilai Industrial Area

1. near KTM Komuter Station

3. near Nilai Impian

4. near Nilai 3

1. at Kajang KTM Komuter Station

2. near Seksyen 7, Bangi

1. at Hentian Kajang, Jln. Reko

2. in front Plaza Metro Kajang

4. near Satay Hj. Samuri5. near Kajang Specialist Hospital

3. near intersection Jln. 7/16. near Kajang Police

Station7. near Metro Point

8. near Kajang KTM Komuter Station

Legend:-

Proposed Location of LRT Station

Proposed Location of BRT Station at Nilai

Proposed Location BRT Station at Kajang Town

BRT Station

LRT Station

LRT Line

BRT Line at Nilai

BRT Line at Kajang Town

Overall Layout of Proposed Public Transport in Study Area

Page 26: Public Transport Study

Cost EstimationCost EstimationCost Estimation for Action Plans

1) 2 Intersections at Jalan Reko

Cost estimation for extend and add lane for 1 intersection

Length = 300 m

Width = 3 m

Excavation depth = 0.3 m

Area volume = 270 m3

Sand/Crusher Run = 25.00 RM/m3

Pavement = 30.00 RM/m3

Compaction = 30.00 RM/m3

Excavation work = 25.00 RM/m3

= 110.00 RM/m3

Others (kerb, lanscape, signboard)

= 20,000.00 RM

Sum of cost = 49,700 RM X 2 = RM 99,400.00

Page 27: Public Transport Study

Cost EstimationCost EstimationCost Estimation for Action Plans

2) 2 Roundabout Nearby Seksyen 15, Bangi

Estimate for traffic light at 2 roundabout = 12nos x RM 300,000.00 = RM

3,600,000.00

3) Bus lanes at Kajang Town

- Use existing asphalt on bus way = 20km x RM 450,000.00 = RM 9,000,000.00

- New asphalt on single lane busway = 4km x RM 2,200,000.00 = RM

8,800,000.00

- Bus way with fully colorized lanes = 24km x RM 150,000.00 = RM 3,600,000.00

Total Cost Estimation for Bus Lanes at Kajang Town = RM 21,400,000.00

4) BRT Transit Central and Taxi Stand

Built BRT Transit Central = RM 7,000,000.00

Total of Cost Estimate for Action Plans = RM 32,099,400.00

Page 28: Public Transport Study

Cost EstimationCost EstimationCost Estimation for Long Term Plans

1) Light Rapid Transit

- Railway = 60km x RM 50,000,000.00 = RM 3,000,000,000.00

- Station = 10nos x RM 5,000,000.00 = RM 50,000,000.00

Total Cost Estimation for LRT = RM 3,050,000,000.00

2) BRT at Kajang

- Station (3m wide) = 14nos x RM 600,000.00 = RM 8,400,000.00

- Air conditioned inside station = 14nos x RM 100,000.00 = RM 1,400,000.00

- Sliding door (8 door per station) = 14nos x RM 120,000.00 = RM 1,680,000.00

- Station identification post = 14 nos x RM 2,500.00 = RM 35,000.00

- Fare system (complete set) = 14nos x RM 1,500,000.00 = RM 21,000,000.00

- Pedestrian crosswalk with signal = 7nos x RM 60,000.00 = RM 420,000.00

Page 29: Public Transport Study

- GPS system = RM 3,000.000.00

Total Cost Estimation for BRT at Kajang = RM 32,935,000.00

3) BRT at Nilai

- Use existing asphalt on busway = 20km x RM 450,000.00 = RM 9,000,000.00

- New asphalt on single lane busway = 5km x RM 2,200,000.00 = RM

11,000,000.00

- Busway with fully colourised lanes = 25km x RM 150,000.00 = RM 3,750.000.00

- Station (3m wide) = 8nos x RM 600,000.00 = RM 4,800,000.00

- Air conditioned inside station = 8nos x RM 100,000.00 = RM 800,000.00

- Sliding door (8 door per station) = 8nos x RM 120,000.00 = RM 960,000.00

- Station identification post = 8nos x RM 2,500.00 = RM 20,000.00

- Fare system (complete set) = 8nos x RM 1,500,000.00 = RM 12,000,000.00

- Pedestrian crosswalk with signal = 4nos x RM 60,000.00 = RM 240,000.00

- GPS system = RM 3,000.000.00

Total Cost Estimation for BRT at Nilai = RM 45,570,000.00

Page 30: Public Transport Study

4) Feeder Bus

Feeder bus = 50nos x RM 700,000.00 = RM 35,000,000.00

Total of Cost Estimate for Long Term Plans = RM 3,163,505,000.00

Page 31: Public Transport Study

ConclusionConclusion1) LRT for Kajang - Bandar Baru Bangi – Putrajaya – Bandar Seri Putra - Nilai

2) BRT for Nilai – Nilai 3 and Kajang Town

- The public’s attitude and willingness to shift to different modes of transport have

been identified as an important step in the improvement process.

- Financial backing and support from the government is also important in ensuring

the success of the public transport network in this area.

Page 32: Public Transport Study