PRABODHANKAR KESHAV SITARAM
THACKERAY NATYA MANDIR
LOCATION
850 m
INTRODUCTION
INFORMATION OF ACTIVITIES CARRIED OUT AT PRABODHANKAR K. S. THACKAREY NATAYAMDNIR
• 1. MAIN AUDITORIUM • 2. MINI AUDITORIUM • 3. ART GALLERY • 4. CONFERENCE HALL • 5. COMMUNITY HALL • 6. REHEARSAL ROOM • 7. RESIDENTIAL ROOM • 8. PAY & PARK .
• STARTING OF CONSTRUCTION – 1994• YEAR OF COMPLETION – 2000• INAUGURATION – 11TH MARCH 2001• CLOSED FOR RENEWATION – FEBRUARY 2009• REOPENING – NOVEMBER 2009
PLAN
SECTION
MAIN AUDITORIUM
• THIS AUDITORIUM IS AIR CONDITIONED.
• SEATING CAPACITY OF 1026, 726 FOR STALL AND 300 FOR BALCONY.
• MAIN STAGE DIMENSION – 40*58 FT
• BACK STAGE DIMENSION – 10*12 FT• CLEAR HEIGHT ABOVE STAGE – 25
FT• CLEAR HEIGHT OF AUDITORIUM
HALL – 30 FT• STAGE IS EQUIPPED WITH
ADVANCED ELECTRIC SYSTEM.
1 m
FLOORING
MINI AUDITORIUM• THIS AUDITORIUM IS AIR
CONDITIONED• SEATING CAPACITY OF 211. • MAIN STAGE DIMENSION – 25*40
FT• BACK STAGE DIMENSION – 8*10 FT• CLEAR HEIGHT ABOVE STAGE – 15
FT• CLEAR HEIGHT OF AUDITORIUM
HALL – 20 FT• STAGE IS EQUIPPED WITH
ADVANCED ELECTRIC SYSTEM.• THIS AUDITORIUM IS PROVIDED
FOR DRAMAS, SCHOOL ANNUAL FUNCTIONS, CHILDREN’S DRAMA, GET-TOGETHER, SEMINARS, ORCHESTRAS, ANNUAL MEETINGS ETC.
• ACOUSTICS SPECIALLY DESIGNED KEEPING AN AIM TO AVOID ECHO AND REFLECTION OF SOUND.
• IRREGULAR SURFACE FINISHES CREATED TO ABSORB THE SOUND AND NOT TO REFLECT.
• POROUS PLASTER BOARDS USED IN FALSE CEILING.
• THE MATERIAL USED ON THE SIDE WALLS IS AN INSPIRATION FROM JUTE.
• WOODEN FLOORING WITH SCREEDING TO BLOCK UNNECESSARY SOUND OF FEET.
• COCONUT POPSICLES (KATHYA) IS USED FOR ACOUSTIOCS ON THE WALL TO AVOID SOUND REFLECTION.
BACKSTAGE
• 2 CHANGING ROOMS AND 2 MAKE-UP ROOMS.
• SPACE FOR LOADING-UNLOADING OF THEATRE EQUIPMENTS.
• BACK SATGE ENTRY FOR ARTIST.
• STAIRCASE FOR REHEARSAL ROOM (FIRST FLOOR).
GREEN ROOMS
• 4 GREEN ROOMS.• EACH MEASURING 10*12
FT.• SEPARATE TOILET FOR
EACH GREEN ROOM.• DRESSERS WITH SPOT
LIGHTS.• IRONING TABLE.• CENTRAL SPACE FOR
REHEARSAL.
REHEARSAL ROOMS
• WOODEN FLOORING WITH SAND BELOW• MIRRORS ON ONE WALL• ROOM DIMENSION – 15*30 FT
CONTROL ROOM
• ELECTRICITY COMES FROM POWER SUPPLIER TO SITE SUBSTATION.
• THEN IT COMES TO CONTROL ROOM IN THREE PHASE OR ONE PHASE SYSTEM.
• FURTHER DIRECT SUPPLY TO THEATRE EQUIPMENTS.
• MAIN SWITCH OF DIESEL GENERATOR.
SITE SUBSTATION
AIR CONDITIONING• CENTRALISED AIR
CONDITIONING SYSTEM
CHILLER PUMP
CONDENSOR PUMP
AHU
FIRE FIGHTING
PAY & PARK
BASEMENT
CONFERENCE HALL
• IT IS DIVIDED IN THREE PARTS WITH SLIDING PARTITIONS AND CAN BE PROVIDED SEPARATELY FOR SMALL ACTIVITIES LIKE MEETINGS, SEMINARS, REHEARSALS ETC.
COMMUNITY HALL• THIS HALL IS SITUATED AT 3RD FLOOR
OF ‘A’ WING HAVING CAPACITY TO ACCOMMODATE ABOUT 300 PERSONS WHICH IS FOR PUBLIC FUNCTIONS
RESIDENTIAL ROOM
ART GALLERY
GUIDE: VASUDEV SALUNKHE
SHUBHAM DANDEKAR
YASH DEOKAR
HIMANSHU DHOTRE
AMIT JADHAV
YASH SALI
VISHAL SHINKAR
PRANAY MULYE
GAURAV DAMBE
IES COAT.Y B.Arch