Project Life Cycle
Design Construction
Conceptual Idea
Tender Tenancy & Occupation
Procurement Method
Procurement❏ Definition : The act of obtaining something.
❏ Process of preparing and processing a demand.
❏ Calling of tender and appointment of main contractor to execute the works.
Traditional Procurement Method❏ Most commonly used and long established
❏ Appoint consultants
❏ Suitable for those who are unfamiliar with the industry.
Advantages❏ Less Parties to Deal With
❏ Full Control of Design
❏ Cost Certainty
❏ Ability to Introduce Changes
❏ Cheaper Tender Price
Disadvantages❏ Longer Overall Development Time
❏ Lack of Single Point of Responsibility
❏ Full Design with Minimal Variation
Tendering Method
TWO STAGE SELECTIVE TENDERING
FIRSTSTAGE
SECONDSTAGE
ADVANTAGES❏ Reasonably Transparent
❏ Eliminate non-performing contractors
❏ Fixed Contract Sum
TENDERING PROCEDUREInvitation
Tender
Tender Document Collection
Tender Closing
Tender Opening
Tender Evaluation
Tender Report
Notifying The
Tenderers
Tender Interview
Tender Award
Contract Arrangement
Type Of ContractRecommendation: Lump Sum ContractWhat is Lump Sum Contract?❏ Most Common❏ Define Contractor’s responsibility to
complete a set amount of work for a fixed sum
❏ Sum is according to BQ, drawings & specifications
Type Of ContractWhy choose lump sum?❏ Minimum variation❏ Easy to manage❏ Payments are based on percentage of
completed work
Why choose PAM 2006 (with Quantities)?❏ more suitable for larger scale projects❏ one of the most often used❏ reduce any possible risks like FIDIC’s Red
Book Sub-Clause 13.8 (Adjustments for Changes in Cost) fluctuation of cost or Sub-Clause 16.1 (Contractor’s Entitlement to Suspend Work) which may incur more cost due to any delays.
Importance of Form of Contract❏ leads to lesser number of disputes and
misunderstandings❏ reduce the cost linked to tendering
and contract administration❏ leads to higher degree of certainty and
fairness during tendering process
Time, Quality, Health & Safety
Quality ❏ Clause 6.0 Materials, Goods and
Workmanship To Conform To Description, Testing And Inspection
Time❏ Clause 21.0 Date Of Commencement,
Postponement and Completion Date❏ Clause 22.0 Damages for
Non-Completion
Health and Safety ❏ Occupational Safety and Health Act
1994 (OSHA)❏ To advise contractors, site workers
their interests of health & safety
Health and Safety File What is Health and Safety File?❏ Construction (Design and
Management) Regulations 2015❏ Contains relevant safety and health
information to be taken into account during any subsequent project.
Health and Safety File Description of the project
Residual hazards that remain and how it is dealt
Key structural principles & Safe working loads for floors and roofs
Information as in built drawings
Information on removal or dismantling of installed plant & equipment
Hazardous material used
Health & Safety File about equipment provided for cleaning or maintaining
Nature, location and markings of significant services
Health and Safety File ❏ Regularly updates, reviews the file on
changes occurred.❏ Health & Safety File will be pass to
client when the work is finished.