4
PLAN FOR SECOND DAY OF SHOOTING Halfwit Productions

Plan for day two of shooting

Embed Size (px)

DESCRIPTION

A2 Media Studies

Citation preview

Page 1: Plan for day two of shooting

PLAN FOR SECOND DAY OF SHOOTING

Halfwit Productions

Page 2: Plan for day two of shooting

GENERAL

Date: Tuesday 1st July 2014

Start time: 11:00 am

Shooting crew: Sahra Ahmed – Director,

Camerawoman

Cast crew: Jordan Hewitt & Arran Sharma

Transport/ chauffeur: Train

Equipment: Camera, tripod, SD card, extra battery

Page 3: Plan for day two of shooting

PRE-SHOOTING PLAN

In school:

Pick up the camera from Mr Brown, call sheet has already been filled in and booked for the 1st July

2014.

Before we leave we must make sure that the battery is fully charged and that I have a spare battery

as well as the charger.

Once all the equipment is gathered, it is to be taken home to be practiced with by the

camerawoman so that she is ready for Tuesday.

Once at the locations to film:

Once shooting:

Walk in park scene

Play twister

Ice-Cream in face

Pontoon Dock

Page 4: Plan for day two of shooting

CONTINUED

Photo shoot for pictures for the magazine

Location pictures taken

Costume pictures

Also, try to re-film Toms split screen scenes.

- End of filming session 2