PIRANHA
PRODUCT
PRESENTATION
Piranha Range
Piranha Applications• Pumping of faecal matter / heavily polluted sewage• Dewatering tasks using small diameter pipes• Sewage removal in private and communal buildings• Sewage removal from Industrial units• Slaughter houses , food processing plants• Waster removal over undulating terrain
Piranha Advantages
• Piranha system designed by ABS• Vast installation and application experience• Ideal for High head - low flow applications• Pump through small diameter pipe lines• Low installation costs• Shredding system means no blockages
Piranha 08/2• DN 32 threaded discharge• Head Max: H = 21 m• Flow Max: Q = 2 l/s• Single and Three phase
versions• Fixed - Pedestal installation• Free standing installation• Available with float switch• No control box needed
Piranha 08/2 Materials
• Motorhousing - Stainless Steel• Volute/Bottomplate - Cast Iron GG25• Impeller - Plastic• Rotor Shaft - Stainless Steel AISI 420• Fasteners - Stainless Steel AISI 316
• Shredding System - Stainless Steel
Piranha S12 / S26
• DN 32 threaded discharge• Head Max: H = 36 m• Flow Max: Q = 2 l/s• Single or Three phase options• Available in Ex proof version
Performance Curves 50 Hz
Piranha M55- M110
• DN 50 flange discharge• Range of motors• M55/2, M70/2, M85/2, M110/2• Head Max: H = 70 m• Flow Max : Q = 5.5 l/s• Three phase only• Available in Ex proof version
Piranha S12/2-M110/2 Materials
• Motorhousing - Cast Iron GG25
• Volute/Impeller/B’Plate - Cast Iron GG25
• Rotor Shaft - Stainless Steel AISI 420
• Fasteners - Stainless Steel AISI 316
• Shredding System - Hardened Steel
PIRANHA SHREDDING SYSTEM
Shredding Ring
Shredding Rotor
Suction
ShearingMaceration
THE SHREDDING SYSTEMWORKS IN 3 PHASES
Test Procedure as agreed between ABS Wexford and Grontmij Consulting Engineers
Procedure:1. Head is set at 10 metres for Piranha 20 range.
2. The test material is put into the test tank in sequence after the previous item has been shredded.
3. Each full test, (all 13 items), runs for ten minutes in total.
4. Head is measured and recorded at beginning and end of each full test.
5. The volute and back of the Impeller is checked after each full test, photographed and cleaned out.
6. The full test is repeated once more.
Aeration
Rinsing
Blowing Clear ofPressurized sewage pipe lines
COMPRESSOR
Pipe Diameter (mm) 32 50 80 100 150
0.7m/sec Q min in: m3/hr 2.0 4.9 12.7 19.8 44.5 l/s 0.5 1.3 3.5 5.4 12.1
0.5m/sec Q min in: m3/hr 1.4 3.5 9.1 14.0 31.6 l/s 0.35 0.9 2.5 3.8 8.6
MINIMUM FLOW IN PIPE LINES
Pipe Diameter
CONVENTIONAL
PIRANHA
TRENCH SIZE
ORIFACE PLATETo avoid cavitation
New software for Piranha Pressure systems - PAWS
PiranhaVideo Approx 10Duration : mins