19
A Seminar On Practical Training Undergone At “GANDHINAGAR THERMAL POWER STATION” RAJASTHAN TECHNICAL UNIVERSITY For the partial fulfilment of the requirement of the degree of BACHELOR OF TECHNOLOGY IN (ELECTRICAL ENGINEERING) 2013-14 Submitted to: Submitted By : Department of electrical Department (CIT) PARTH VYAS (B.Tech. IV year) 11ECAEE241 DEPARTMENT OF ELECTRICAL ENGINEERING CHARTERED INSTITUTE OF TECHNOLOGY (CIT)ABU ROAD

Parth Gandhinagar TPS

Embed Size (px)

Citation preview

A

Seminar

On

Practical Training Undergone At

“GANDHINAGAR THERMAL POWER STATION”RAJASTHAN TECHNICAL UNIVERSITY

For the partial fulfilment of the requirement of the degree of

BACHELOR OF TECHNOLOGY

IN

(ELECTRICAL ENGINEERING)2013-14

Submitted to: Submitted By :

Department of electrical Department (CIT) PARTH VYAS (B.Tech. IV year)11ECAEE241

DEPARTMENT OF ELECTRICAL ENGINEERING

CHARTERED INSTITUTE OF TECHNOLOGY (CIT)ABU ROAD

METHOD TO PRODUCED METHOD TO PRODUCED ELECTRICITYELECTRICITYFUEL WISE CAPACITY OF POWER PLANTFUEL WISE CAPACITY OF POWER PLANTPRINCIPAL OF THERMAL POWER PLANTPRINCIPAL OF THERMAL POWER PLANTCONCEPTCONCEPTABOUT TPS GANDHINAGARABOUT TPS GANDHINAGARCOMPONENTS OF THERMAL POWER PLANTCOMPONENTS OF THERMAL POWER PLANTLAY OUT OF TPSLAY OUT OF TPSCOAL CYCLE COAL CYCLE STEAM CYCLE STEAM CYCLE WATER CYCLEWATER CYCLESWITCH YARD SWITCH YARD INTERNAL GTPS POWER LAY-OUT INTERNAL GTPS POWER LAY-OUT

Electricity Generated In Large Power Plants. Prime Mover Converts One Form Of Energy Into Mechanical Energy. This Mechanical Energy Drives The Rotor Of The Alternator In Which Electricity Is

Generated.

THERMAL POWER PLANTTHERMAL POWER PLANT

HYDRO POWER PLANTHYDRO POWER PLANT

NUCLER POWER PLANTNUCLER POWER PLANT

GAS TURBINE POWER PLANTGAS TURBINE POWER PLANT

DIESEL POWER PLANT,DIESEL POWER PLANT,

SOLAR POWER PANT ETCSOLAR POWER PANT ETC 

THERMAL POWER PLANT

Electrical Energy

Total Installed Capacity 870 MW. The TPS has 10 outgoing lines of 220 kV each.

ABOUT TPS GANDHINAGARABOUT TPS GANDHINAGAR

Sr.no

Date of Starting

Capacity

1 13 March, 1977

120 MW

2 10 April, 1977

120 MW

3 22 March, 1990

210 MW

4 20 July, 1991 210 MW

5 17 March, 1998

210 MW

Coal storage Coal handling plant Boiler Boiler furnace Super heater Economizer Air-Preheater Chimney Induced draught

fan

Forced draught fan

Turbine Alternator Exciter Condenser Cooling tower Pumps Ash storage Ash handling

plant

ID Fan

COAL STORAG

E

Coal Handling

Plant

Ash Handling Plant

Ash Storag

e

Air Preheate

r

Economizer

Super Heate

rEXCITER

Condenser

Condenser

Boiler

PumpPump

Cooling

Tower

Cooling

Tower

FD Fan

GN

CHIMNEY

TURBIN

RIVER

RIVER

GNRTR

Bus bar

Conveyor

Coal Hopper

Crushing Mill

Wagon Unloading

Boiler Turbine

Generator

POWER TRANSFORMER

ISOLATORS

LIGHTING ARRESTORS

WAVE TRAP(PLCC)

BUSBARS RELAY

C.T. INDICATING & METERING EQUIPMENTS

P.T.

C.B.