National GuardBlack Belt Training
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Module 19
Document and Analyze the Process
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
CPI Roadmap – Measure
Note: Activities and tools vary by project. Lists provided here are not necessarily all-inclusive.
TOOLS
•Process Mapping
•Process Cycle Efficiency/TOC
•Little’s Law
•Operational Definitions
•Data Collection Plan
•Statistical Sampling
•Measurement System Analysis
•TPM
•Generic Pull
•Setup Reduction
•Control Charts
•Histograms
•Constraint Identification
•Process Capability
ACTIVITIES• Map Current Process / Go & See
• Identify Key Input, Process, Output Metrics
• Develop Operational Definitions
• Develop Data Collection Plan
• Validate Measurement System
• Collect Baseline Data
• Identify Performance Gaps
• Estimate Financial/Operational Benefits
• Determine Process Stability/Capability
• Complete Measure Tollgate
1.Validate the
Problem
4. Determine Root
Cause
3. Set Improvement
Targets
5. Develop Counter-
Measures
6. See Counter-MeasuresThrough
2. IdentifyPerformance
Gaps
7. Confirm Results
& Process
8. StandardizeSuccessfulProcesses
Define Measure Analyze ControlImprove
8-STEP PROCESS
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
3
Learning Objectives
Develop skill with process maps to analyze the process in detail from the process participants‟ and the customers‟ viewpoints
Learn Process Mapping as a critical skill to eliminating waste in the existing process
Learn the features of different approaches to process mapping to enhance team learning
Learn how to develop a detailed, data rich Value-Stream Map from a Process Map
National GuardBlack Belt Training
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Process Mapping
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
5
What Is a Process Map?
A graphical representation of a process flow identifying the steps of the process, displaying the X‟s (inputs) and Y‟s (outputs) of the process and of each individual step
Process maps need to be modified to fit the particular needs of any specific process
Typical Order Fulfillment Process
Customer Places
OrderSend order to
warehouse for picking
Is order
correct?
No
Yes
Call Customer
and make
corrections.
Is
Product
Available?
No
Yes Pick product for order
Does Customer
have other
shipments?
Yes
NoWill product
be available before order
ships?Yes
Place order on hold
until product available
Cancel Order
No Is production
scheduled to
manufacture product?
Can
production manufacture
product in
time for shipping?
No
Yes
No Will Customer accept
backorders?
Yes
Expedite
manufacturing schedule
NoShip Order
Yes
Will Customer
allow
consolidated shipments?
Yes
No
Consolidate Orders
Customer Receives
Order
Order Entry WarehousingSales
Manufacturing
TransportationTypical Order Fulfillment Process
Customer Places
OrderSend order to
warehouse for picking
Is order
correct?
No
Yes
Call Customer
and make
corrections.
Is
Product
Available?
No
Yes Pick product for order
Does Customer
have other
shipments?
Yes
NoWill product
be available before order
ships?Yes
Place order on hold
until product available
Cancel OrderCancel Order
No Is production
scheduled to
manufacture product?
Can
production manufacture
product in
time for shipping?
No
Yes
No Will Customer accept
backorders?
Yes
Expedite
manufacturing schedule
NoShip OrderShip Order
Yes
Will Customer
allow
consolidated shipments?
Yes
No
Consolidate Orders
Customer Receives
Order
Order Entry WarehousingSales
Manufacturing
Transportation
Operations
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
6
Why Process Mapping?
Reasons for Process Mapping:
Analysis yields critical points in the process to measure
Identifies gaps between strategic focus and actual process
Aids in Project charter development… a consensus view
Identifies projects – strategically assign BB/MBB
Drill down to project/process focus areas
Common Elements Depicted on Maps:
Suppliers/Inputs
Customers/Outputs
Process handoffs
Decision points & branches
Value Added/Non-Value Added analysis
Where/when defects occur
Lead times
WIP exists
Using symbols to depict the process
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
7
Typical Process Maps
SIPOC
Process Map• Top-down• Swim-lane or cross functional• Detailed
Value Stream Map
Specialized Maps• Input/Output Analysis• Time/Value Analysis• Defect Fall-Out• Spaghetti Diagram
Outline
Sets the scope of the Value-Steam map
Not all tools are needed for every project!
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
8
Problem Definition and Process Mapping
How do I start mapping a process?
The first step is to have a well-defined problem statement (see the Project Charter module)
Process mapping will illustrate a process or business function with respect to the problem statement
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
9
Process Mapping Hints
Facilitate the team and
Do not try to map EVERY service/process – select a typical service to follow
Map with the team – real place, real people, real work
Identify VA and NVA Activities (more on this later!)
Add project critical metrics as applicable
Do not ask individual area managers to map “their” process and paste these together
Do not map your organization, but rather the flow of products through the organization (“be” the paper, product, etc.)
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
10
Process Map Goals
In capturing the process, the team must depict:
What the process looks like
Where key inputs occur
Depict the key outputs
Decision points
Delays
Hidden rework loops
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
11
High-Level Process View
High-level view is characterized by
The major elements and their interactions
Showing the role of feedback and information flow
In 5 to 9 steps maximum
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
12
Low-Level Process View
Low-Level View is done when
Team reaches the level necessary to address the root cause of the problem and to assure ownership is clear
Remember that
Each process has sub-processes, which have micro-processes, and so on (see the Top-Down model)
Do not try to describe or review the entire process (or system) at this level… too granular
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
13
Current State Hints
Get the current state depicted first, then team needs to validate it
Team should walk the process, gather data
Staple yourself to a request/order
Use paper to draw first drafts, not computer
Clarify process map and scope with the sponsor
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
14
Top-Down Flow Chart / Process Map
A High-Level Chart selectively expands (zooms in) from the highest level down to the level where the root cause is located
To create:
Determine the Start and Finish Points of the broad Process
Define 5 to 9 high level activities between Start and Finish
Expand the high level activity(ies) most likely to contain the root cause into 5 to 9 medium level activities
Choose the medium level activity(ies) most likely to contain the root cause into 5 to 9 lower level activities
Expand again (and again!) until the level at which the cause(s) of the problem is reached
At this level complete detailed process map(s)
Pitfalls…
Top Down Process Maps are tools to aid in focusing flow-charting effort
Do not flow chart a large process in too granular detail, FOCUS!
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
15
Top Down Flowchart - DAC Hiring Process
RequestPrep
UnitReview
FunctionReview
InternalSourcing
ExternalSourcing
Interview Offer
New DAC Employee
Orientation
Review“Short”
List
Review SearchData
Post Job on CPO site
ReviewCPO siteResponses
CoordinateWith
Current Sup.
ChooseJob
Class
EnterDescrip.
EnterDetails
EnterCloseDate
Submitto
publish
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
16
:
Swim Lane” Cross Functional Map
Use for large, complex processes when:
Multiple departments/functions are involved, including outside the firm
Sequence and time of processes is important (as in lead time reduction)
You need to shows handoffs in the process
By convention, the top lane is typically reserved for the customer
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
17
Swim Lane ExampleCouncil Advanced Quality Healthcare CAQH Application Process
NG
BS
tate
Su
rge
on
Pro
vid
ers
CA
QH
MC
S
Request ListStart
Supply List
List OK?
Request Paper
Credential Files
PCFs
Notify Provider
Supply
PCFs
Y
Roster: Create
Acct
Notify CAQH
Fax Docs CAQH a
b
Revise List
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
18
Example-NCOES Scheduling
SGT Counseled
Initial:
-DA 2166-8-1
Addresses:
-Attendance
-Completion
-Timeframe (AR 350-1)
-Total AT time available for that TY
Secondary Counseling:
Addresses:
-Reduction
-Rescheduling
-Evaluation Comment
(NCOER)
SGT Scheduled
in First Available Course
(ATRRS Op/Trng NCO)
Approval Hierarchy
(May be multiple levels)
Approve
Deny
Deny
Approval
School
Request
Order Cut
Order Cut
Wait
Request
Amend
Original
Original
Amend
SGT Notified
(Certified Mail or
Document Reciept)
TASS
Ck ListPass
SGT
Attends
School
Fail
REDUCTION
Reschedule
Fail
SGT GraduatesPass
ATRRS Update
RLAS Update
SGT annotated as
NCOES trained in
ITRS, RLAS, 2-1
FL
LA
TT
RS
Op
/
Trn
g N
CO
Ap
pro
va
l
Hie
rarc
hy
Qu
ota
Mg
rS
old
ier
Sc
ho
ol
NC
OIC
Un
it
Ad
min
X1
X2
X3
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
19
More Helpful Hints
Now that you have seen some examples, here are some more hints:
Interrogate the process by watching in many different conditions. You must watch the process as it happens to see the detail you need.
Do not let space be an issue. Consider using sticky notes as the process steps and post on a wall to get your initial ideas across.
If your map does not have enough space to list all the information, use numbered reference sheets as attachments.
Maintain your Process and Value-Stream Maps with dates and update them maintaining version control.
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
20
Process Mapping Tips
It should illustrate both the work flow and the organizational interaction
It should use a common language (symbology) which is understood by everyone
It should capture all multiple paths, decisions, and rework loops
It should contain adequate detail Too much detail is
incomprehensible
Too little detail has no analytical value
Connector
Process Step or Operation
Decision
Directional Flow
Storage, Waiting Time
Delay
National GuardBlack Belt Training
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Value Stream Mapping
For Deeper Analysis
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
A Value Stream – A Definition
“All actions, both value-creating and non value-
creating, required to bring a product or service
from concept to launch and from order to delivery.
These include actions to process information from
the customer and actions to transform the product
on its way to the customer”
Lean Enterprise Institute – Prof. Dan Jones
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Value Stream Mapping Benefits
Methodology for documenting process flow
Details / defines activities through the business processes
Helps to identify waste & value
Assists with identifying and communicating activities from current state (As-Is) to the future state (To-Be)
Value stream mapping is the start to any Lean transformation
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Value Stream MappingWhat VSM can show
Material flow / movement
Information flow
People movement
Tools and equipment movement
Inventory levels
Machine utilization
Value added times versus lead time
Level of rework at each step
All wastes including
Storage
Waiting time
Scrap Levels
Overproduction
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Key Advantages of Value Stream Mapping
VSM is effective because it Provides overview of the whole Value Stream
Links information and material flows
Depicts waste within the system with visual symbols
Allows clear targeting of waste elimination
Is an excellent communication technique for any operation
Provides framework for conversations
Shows in a concise way how operation functions
Prevents focusing on large improvement opportunities with little impact
SuppliersTransformation
ProcessesCustomer
Value Stream
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
26
Value Stream Mapping Steps
Step 1: Create a SIPOC Chart
Step 2: Map the Current State with a “Top Down” or “Swim Lane” Flow Chart
Step 3: Determine Service/Product Family to Value Stream Map (Scoping!)
Step 4: Draw the Process Flow
Step 5: Add the Material Flow
Step 6: Add the Information Flow
Step 7: Add Process Data Collection boxes
Step 8: Add Lead Time data
Step 9: Verify Current State Map
Step 10: Create Future State Map
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Value Stream Mapping – Useful Tips
Agree on standard measurements before you start.
Walk the actual process, don‟t rely on what people think.
The whole process should be mapped by the same persons.
Level of detail should be appropriate for activities captured.
Establish the best direction for mapping - sometimes from the customer and working backwards.
Observe the actual times, distances and inventory levels.
Capture the movement of information as well as materials.
A pencil and paper can be used to illustrate the process quickly and effectively.
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
• Diagram needs to be on one sheet of paper
• Use the standard format for the diagram
• Use the standard symbols for the diagram
• Capture all of the data yourself
• Walk, Understand and Validate the process
• Involve as many people as practical
• Use paper and pencil
Principles for Creating a Value Stream Map
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Factory
DATA BOX
I
Delivery
Times
Process
Information
Inventory
Shipping
Movement of
Finished Goods
Information Flow
Electronic
Information Flow
Push Movement
Withdrawal
Production Kanban
Withdrawal Kanban
Value Stream Mapping – The Symbols
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
30
Sample Value Stream Mapping Symbols
Machining C/T = 36 Sec
Set Up Time 7 Min
Uptime 86%
Process Box
Data Box
I
Queue/Inventory
1
Personnel
Flow(Information)
Electronic Information
Sign Off Point
Push Systems
Truck Shipment
Quotes
Supplier/Customer
Flow(Physical)
Physical Pull
ProjectBurst
SupermarketReplenishment
KanbanStation
PaperKanban
ElectronicData
System F I F OFIFO Lane
PhysicalTransport
“Go See”Monitoring
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Identify the CustomerCustomers
Start with the customer requirements to
ensure the VSM reflects the customers
needs.
Identify the Suppliers Suppliers
Identify the major suppliers, their
locations and their products.
Identify the major
processes
Keep the processes top level to keep
the VSM simple.
Process 1
Creating the Value Stream Map
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Supplier
Metal
Components
Ltd
Production Control
Customer
ANG
Refueling
Wing
Salesg
Goods Inwards Process A Assembly Process B Treatments Dispatch
Creating the Value Stream Map
Example: Refueling Wing Widgets
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
6
Items
Supplier
Metal
Components
Ltd
Production Control
Customer
Sales
Goods Inwards Machine A Assembly Machine B Treatments Dispatch
Prod
Schedule
2 Deliveries
per week.
5 items each1 Delivery
per week
of 2 items
Order
2
Items
Order
4
Items
3
Items2
Items
9
Items
5
Items4
Items
4
Items
1
Items
200m 400m 400m 300m 200m
60 miles 90 miles
8 per
month
Creating the Value Stream Map
ANG
Refueling
Wing
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
• Complete process
details
The information box can contain any
relevant details such as: type of operation,
cycle times (c/t), batch sizes (b/s), number
of operators, number of shifts, available
working time, scrap rates, set-up times.
Process 1
• Capture push
systems
Push systems tend to occur where
material moves in accordance with
schedules / MRP.
• Capture pull / Kanban
systems
Pull systems and true kanbans only occur
where movement of material is directly
related to customer orders. Production
should stop unless there is a Kanban
signal.
Creating the Value Stream Map
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
35
Step 3. Process/Service Matrix
We need to first determine what process or service offering we want to map
Sometimes this is obvious
Hiring employees and paying invoices are clearly different processes which would require separate process maps
Sometimes it is unclear - and a Process/Service Matrix will help us clarify
Do new home applications, student loans, refinancing loans, car loans, and home equity loans use similar processes? We need to investigate.
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Delivery
Times
I
Movement of Goods Capture the direction and flow of goods
internal and external.
Capture transportation
events
Note the frequency and quantities of
deliveries shipped in and out of the
company.
Document Information
Flow
Observe Inventory
Levels
Capture the transfer of information as
well as materials. Distinguish between
electronic and paper-based systems.
Note the amount of inventory in terms
of the number of pieces and/or the
number of days of inventory
represented.
Creating the Value Stream Map
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
37
Step 3. Process/Service Matrix
Service and Process Matrix
Determine a process or service to map
Create a matrix of services and processes through which they pass
Group similar services togetherRefueling Wing Widgets Product Process Matrix
Process Steps
Goods Inwards Process A Assembly Process B Treatments Dispatch
Boom fastener 4567 X X X
Boom gasket kit 5668 X X X X
Boom potentiometer bracket 8907 X X X X X
Boom PCB environmental enclosure 7800 X X X X X
Boom frame positioner 67-8989 X X
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
38
Step 4. Draw the Process FlowBegin with the Customer
1 Delivery
per week
of 2 items
90 miles
ANG
Refueling
Wing
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
39
Step 4. Draw the Process Flow Add the Process Boxes
1 Delivery
per week
of 2 items
90 miles
ANG
Refueling
Wing
Goods Inwards
C/T 40 mins
SUT 5 mins
B/S 1
Machine A
C/T 245 mins
SUT 35 mins
B/S 1
Assembly
C/T 150 mins
SUT 0 mins
B/S 1
Machine B
C/T 65 mins
SUT 120 mins
B/S 2
Treatments
C/T 140 mins
SUT 2 mins
B/S 2
Dispatch
C/T 15 mins
SUT 0 mins
B/S 2
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
40
Step 5. Add the Material FlowAdd Inventory, Approvals, and Flow
1 Delivery
per week
of 2 items
90 miles
ANG
Refueling
Wing
6
Items
Goods Inwards
C/T 40 mins
SUT 5 mins
B/S 1
Machine A
C/T 245 mins
SUT 35 mins
B/S 1
Assembly
C/T 150 mins
SUT 0 mins
B/S 1
Machine B
C/T 65 mins
SUT 120 mins
B/S 2
Treatments
C/T 140 mins
SUT 2 mins
B/S 2
Dispatch
C/T 15 mins
SUT 0 mins
B/S 2
2
Items
4
Items
3
Items2
Items
9
Items
5
Items4
Items
4
Items
1
Items
200m 400m 400m 300m 200m
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
41
Step 5. Add the Material FlowAdd Major Supplier
1 Delivery
per week
of 2 items
90 miles
ANG
Refueling
Wing
6
Items
Goods Inwards
C/T 40 mins
SUT 5 mins
B/S 1
Machine A
C/T 245 mins
SUT 35 mins
B/S 1
Assembly
C/T 150 mins
SUT 0 mins
B/S 1
Machine B
C/T 65 mins
SUT 120 mins
B/S 2
Treatments
C/T 140 mins
SUT 2 mins
B/S 2
Dispatch
C/T 15 mins
SUT 0 mins
B/S 2
2
Items
4
Items
3
Items2
Items
9
Items
5
Items4
Items
4
Items
1
Items
200m 400m 400m 300m 200m
Supplier
Metal
Components
Ltd
2 Deliveries
per week.
5 items each
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
42
Step 6. Add Information/Monitoring Flow
6
Items
Supplier
Metal
Components
Ltd
Production Control
Customer
Sales
Goods Inwards
C/T 40 mins
SUT 5 mins
B/S 1
Machine A
C/T 245 mins
SUT 35 mins
B/S 1
Assembly
C/T 150 mins
SUT 0 mins
B/S 1
Machine B
C/T 65 mins
SUT 120 mins
B/S 2
Treatments
C/T 140 mins
SUT 2 mins
B/S 2
Dispatch
C/T 15 mins
SUT 0 mins
B/S 2
Prod
Schedule
2 Deliveries
per week.
5 items each1 Delivery
per week
of 2 items
Order
2
Items
Order
4
Items
3
Items2
Items
9
Items
5
Items4
Items
4
Items
1
Items
200m 400m 400m 300m 200m
60 miles 90 miles
8 per
month ANG
Refueling
Wing
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
6
Items
Supplier
Metal
Components
Ltd
Production Control
Customer
Sales
Goods Inwards
C/T 40 mins
SUT 5 mins
B/S 1
Machine A
C/T 245 mins
SUT 35 mins
B/S 1
Assembly
C/T 150 mins
SUT 0 mins
B/S 1
Machine B
C/T 65 mins
SUT 120 mins
B/S 2
Treatments
C/T 140 mins
SUT 2 mins
B/S 2
Dispatch
C/T 15 mins
SUT 0 mins
B/S 2
Prod
Schedule
2 Deliveries
per week.
5 items each1 Delivery
per week
of 2 items
Order
2
Items
Order
4
Items
3
Items2
Items
9
Items
5
Items4
Items
4
Items
1
Items
200m 400m 400m 300m 200m
60 miles 90 miles
8 per
month
Creating the Value Stream Map
ANG
Refueling
Wing
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
• Withdrawal Pull of material, usually from a
supermarket
• Production Kanban
The “one-per-container” kanban, card or
device that tells a process how many of
what can be produced and gives permission
to do so.
• Withdrawal KanbanCard or device that instructs the material
handler to get and transfer parts i.e. from
a foot print to the consuming process.
Creating the Value Stream Map
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
What to measure?
Should support a company‟s objectives for cost, service, and quality
Should highlight waste
Be flexible
Revise as necessary as the process tasks are defined
Select ones you may already be using
If there is time, seek out some baseline measures
Value Added Time
Inventory
Inspection
Set-Up
Distance
Non-value
added time
Rework
Creating the Value Stream Map
MeasurementTo support any improvement we have to understand the current
“as-is” process with the key measures.
Waiting
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
6
Items
Supplier
Metal
Components
Ltd
Production Control
Customer
Sales
Goods InwardsC/T 40 minsSUT 5 mins
B/S 1
Machine AC/T 245 minsSUT 35 mins
B/S 1
AssemblyC/T 150 minsSUT 0 mins
B/S 1
Machine BC/T 65 mins
SUT 120 minsB/S 2
TreatmentsC/T 140 minsSUT 2 mins
B/S 2
DispatchC/T 15 minsSUT 0 mins
B/S 2
Prod
Schedule
2 Deliveries
per week.
5 items each
1 Delivery
per week
of 2 items
Order
2
Items
Order
4
Items
3
Items2
Items
9
Items
5
Items4
Items
4
Items
1
Items
200m 400m 400m 300m 200m
60
miles
90
miles
8 per
month
Creating the Value Stream Map
ANG
Refueling
Wing
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
47
Step 7. Add Process Data Collection Boxes
Walk the Value Stream and see the flow
Gather significant data for each step in the flow
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Cycle Time:
Takt Time:
Number of People:
Number of Approvals:
Items in Inbox:
% Rework:
# of Iterations (cycles):
# of Databases:
Top 3 Rework Issues:
1.
2.
3.
Manufacturing Transactional / Office
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Step 7. Add Process Data Collection Boxes
6
Items
Supplier
Metal
Components
Ltd
Production Control
Customer
Sales
Goods InwardsC/T 40 minsSUT 5 mins
B/S 1
Machine AC/T 245 minsSUT 35 mins
B/S 1
AssemblyC/T 150 minsSUT 0 mins
B/S 1
Machine BC/T 65 mins
SUT 120 minsB/S 2
TreatmentsC/T 140 minsSUT 2 mins
B/S 2
DispatchC/T 15 minsSUT 0 mins
B/S 2
Prod
Schedule
2 Deliveries
per week.
5 items each
1 Delivery
per week
of 2 items
Order
2
Items
Order
4
Items
3
Items2
Items
9
Items
5
Items4
Items
4
Items
1
Items
200m 400m 400m 300m 200m
60
miles
90
miles
8 per
monthANG
Refueling
Wing
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Dividing the value added time by the total elapsed time gives an
indication of waste levels (Efficiency of Process / Value Added
Ratio)
A similar process can be used to capture other information e.g.
inventory levels and distance travelled.
Value Added
Elapsed Time
Total Value
Added Time =
Total Elapsed
Time =
Creating the Value Stream Map
Timeline
A timeline shown below the process map helps us to illustrate
Value added versus non value added time.
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
50
Step 8. Add Lead Time Data
Graphical display of time factor of value stream
Times on top = Queue time
Base on historical data if possible, observation otherwise
May be calculated from inventory amounts (Inventory/takt time)
Times on bottom = Processing time
May include wait times within process step
Base on historical data if possible, observation otherwise
Summary box on right
Total queue time in top
Total processing time in bottom
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Step 8. Add Lead Time Data
6
Items
Supplier
Metal
Components
Ltd
Production Control
Customer
Sales
Goods InwardsC/T 40 minsSUT 5 mins
B/S 1
Machine AC/T 245 minsSUT 35 mins
B/S 1
AssemblyC/T 150 minsSUT 0 mins
B/S 1
Machine BC/T 65 mins
SUT 120 minsB/S 2
TreatmentsC/T 140 minsSUT 2 mins
B/S 2
DispatchC/T 15 minsSUT 0 mins
B/S 2
Prod
Schedule
2 Deliveries
per week.
5 items each
1 Delivery
per week
of 2 items
Order
2
Items
Order
4
Items
3
Items2
Items
9
Items
5
Items4
Items
4
Items
1
Items
200m 400m 400m 300m 200m
60
miles
90
miles
8 per
month
975
40 + 40
5 + 5
245 + 245
35 + 353360 1900 2300 1775
150 + 150
0
130
120
140
21140
15
0
Value Added
Time = 1155
Elapsed Time
= 12807 (6 wks)
VAR = 9%
6 9 2 4 2 3 4 5 4 1
200m 400m 300m 300m 200m
Total Distance
= 1500m
Total Inventory
= 40
ANG
Refueling
Wing
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
52
Step 9. Verify the Current State VSM
Peer Review
Use non-team members who know the process
Review process both internally and “at its edges” (the interfaces)
Simulation
Use Excel and a static format
Use simulation software (i.e., ProModel) and a dynamic approach
Piloting
Pick a part of the organization that is a good representation of the rest
Committed upper management, enthusiastic operations personnel
Implement and observe the improvement. Be prepared to evaluate.
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
53
The Future State
When to complete the „Future State‟ map? Often done in Improve Phase for 3 to 5 month long DMAIC projects
Done much sooner in an RIE (more on this later)
Map the Future State to Prioritize Improvement Opportunities: Utilize Takt calculations
Have a goal of continuous flow
Establish queue programs (utilizing Kanbans) where continuous flow is not possible
Find opportunities to shorten/reduce defects, downtime, setup time, value-add time
Do not try to change service designs, technology, or facility locations on first iterations of your future state design
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
54
Questions About Future State
What is the Takt Rate?
Will I have a queue system or ship direct?
Where can I utilize continuous flow?
Where will I need replenishment pull systems?
At what single point will I schedule services?
How will I level the service mix at the Bottleneck (also referred to as a Time Trap) or Constraint?
What will be my project priority?NOTE: Definitions for unfamiliar terms will be covered later in the course.
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
55
Use of Future State Map
Prioritize Opportunities
“See” and Manage the Overall Material Flow
Communication of “the Future”
Create a Plan with Timeframes
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Future State VSM (Refueling Wing Widgets)
6
Items
Supplier
Metal
Components
Ltd
Production Control
Customer
Sales
Goods InwardsC/T 40 minsSUT 5 mins
B/S 1
Machine AC/T 245 minsSUT 35 mins
B/S 1
AssemblyC/T 150 minsSUT 0 mins
B/S 1
Machine BC/T 65 mins
SUT 120 minsB/S 2
TreatmentsC/T 140 minsSUT 2 mins
B/S 2
DispatchC/T 15 minsSUT 0 mins
B/S 2
Prod
Schedule
2 Deliveries
per week.
5 items each
1 Delivery
per week
of 2 items
Order
2
Items
Order
4
Items
3
Items2
Items
9
Items
5
Items4
Items
4
Items
1
Items
200m 400m 400m 300m 200m
60
miles
90
miles
8 per
month
975
40 + 40
5 + 5
245 + 245
35 + 353360 1900 2300 1775
150 + 150
0
130
120
140
21140
15
0
Value Added
Time = 1155
Elapsed Time
= 12807 (6 wks)
NVA-R = 9%
ANG
Refueling
Wing
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
Trigger:
Completion Criteria:
Lead Time:
Cycle Time:
Takt Time:
Number of People:
WIP Pieces:
C/O Time:
Distance Item Travels:
% Rework:
Top 3 Defects:
1.
2.
3.
AutomateMonitoring
Use non ToxicTreatment
Pull SinglePiece Flow
Use Visual Mgmt for Parts Tray
Experiment Different Couriers
6 9 2 4 2 3 4 5 4 1
200m 400m 300m 300m 200m
Total Distance
= 1500m
Total Inventory
= 40
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
57
Future State VSM (an Ordering Example)
57
Order Mgmt System
CUSTOMER
DISTOrder MgmtOrder MgmtOrder Mgmt Order Mgmt
Option Tree
Automated Operator
P/T = 2 min
Error Rate=2%
Volume=800
P/T = 5 Min
Error Rate=0%
Volume=800
P/T = 2 Min
Error Rate=2%
Volume=800
P/T = 2 Min
Error Rate=1%
Volume=800
2 min
Phone Call
Large
Business
Home
5 Customers
3 Customers
3 Customers
Small
Business
Customer
Info4
Product
Need4Pricing
4
Shipping
Info4
P/T = 2 min
Lost calls=1%
Volume=1200
Pick
Pack & Ship
P/T = 120 Min
Error Rate=1%
Volume=1200
10
2 min 5 min 2 min 2 min 120 min
240 min2 min
Customer call time = 15 min
Service lead time = 375 min
SUPPLIERS
Daily Update
Real-time Update
Real-time Update
Automated Phone
System
Order Mgmt
System
Frequency
of Information
Queue
Management
Mistake
Proofing
Value Add
Reduction
Mistake
Proofing
20
Orders
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
58
Future State VSM (a Hiring Example)
HAL(Hiring Accountability Lister)
Management
Ext. Source
Internet
1
Int. Source
JobNet
1
Request Prep
Input to HAL
1
Unit Review
In HAL
Serial5
Funct. Review
HAL
HRS1
Interview
HAL
Complex4
Offer
HAL
Serial5
NEO
HAL
HRS3
Trigger
Process lead Time
Rework %
# of Approvals
Need a person
6 days
87%
0
Request Completed
11 days
44%/52% scrap
4
Received in Funct.
4 days
23%
1
Int. Cand. Avail.
17 days
0%
0
Rec. by Sourcer
8 days
0%
0
Resumes to H Mgr
14 days
11%
1 (Meeting)
Candidate Chosen
7 days
8%
4
Accept received
18 days
36%
0
New EmployeesReport Weekly
HAL(Hiring Accountability Lister)
Management
Ext. Source
Internet
1
Int. Source
JobNet
1
Request Prep
Input to HAL
1
Unit Review
In HAL
Serial5
Funct. Review
HAL
HRS1
Interview
HAL
Complex4
Offer
HAL
Serial5
NEO
HAL
HRS3
New EmployeesReport Weekly
Ext. Source
Internet
1
Int. Source
JobNet
1
Request Prep
Input to HAL
1
Unit Review
In HAL
Serial5
Funct. Review
HAL
HRS1
Interview
HAL
Complex4
Offer
HAL
Serial5
NEO
HAL
HRS3
New EmployeesReport Weekly
Various methods
Ext. Source
Internet
1
Int. Source
JobNet
1
Request Prep
Input to
HAL1
Unit Review
In HAL
Serial5
Funct. Review
HAL
HRS1
Interview
HAL
Complex4
Offer
HAL
Serial5
NEO
HAL
HRS3
New EmployeesReport Weekly
Task Manager Task Manager
6 dy 10 dy 2 dy 17 dy 5 dy 14 dy 7 dy 14 dy
10 days
75 days
1 dy 2 dy 0 dy 3 dy 0 dy 0 dy 4 dy
Simplify/ Mistake Proof
AutomateMonitoring
ForecastImprovement
ImproveVisibility
ReducePLT
ImproveVisibility
Simplify/Combine
ReduceNo-Shows
Simplify/Reduce PLT
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
59
Exercise: Create a Value Stream Map
Objective
Create a Value Stream Map for GGA's Budget Department Simulation
Instructions
1. Start with SIPOC – already created
2. Create the Process Flow
3. Add the necessary elements to make it a Value Stream Map Estimate lead time for each step (touch time to process 1 budget
document) and put on the sticky note Tape the paperwork necessary to complete the job BELOW the sticky
note Tape the outputs/reports for each job Add inventory information and any other information deemed useful
Time: 30 Minutes
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
60
Process and Value-Stream Map Benefits
Initially, serve to clarify the problem and possible causes
Gain agreement on current operations:
Who are the current customers of the process, and by customer set?
What is currently being delivered – what is value added, what is not?
Show relationships/interfaces between disparate elements –where are the disconnects in service or information flow?
Determine where the process is most likely to give the most pertinent information:
What do we need to know?
Where are we going to get it?
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
61
Process and Value-Stream Map Benefits
Utilize map as a template for gathering data and showing data relationships
Use as a skeleton to display relevant data
Maps assist the improvement discussions and implementation planning as well as the actual implementation
Show results of “what if” exercises
Additionally, use maps on long term basis to communicate the process performance to the organization
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
62
Takeaways
Process/Value Stream Maps are valuable for describing the current situation and establishing requirements
Process/Value Stream Maps are one of the MOST important deliverable for the Measure Phase
It is important to match the tool used (the type of Map) to the needs – there may even be multiple maps used in one project
Important to show both the flow of services as well as the flow of the data and information necessary for success
National GuardBlack Belt Training
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Value Added/Non-Value Added Analysis
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
64
Value Added/Non-Value Added Analysis
The process used to identify steps in a process for which the customer is willing to pay, and those for which the customer is unwilling to pay
All processes are made up of three types of activities:
1. Customer Value Added
2. Non-Value Added Required
3. Non-Value Added
The objective of non-value added analysis is to:
Eliminate the hidden costs that do not add value to the customer
Reduce unnecessary process complexity, and thus errors
Reduce the process lead time
Increase capacity by better utilizing resources
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
65
Start With A Good Process Map
Start
Stop
Customer*
Order Entry
Administration
Warehouse
Customer Service
Start
End
Place Bill
Under Door
Is the Bill
Accurate
YES
NO
Retrieve &
Review Bill
Go To
Front Desk
Adjust
the Bill
Settle / Pay
the Bill
Use Video
CheckoutYES
NO
Go To
Front Desk
Exit the
Hotel
ProcessSupplier
ProcessCustomer
Activity
1
Activity
1Activity
2
Activity
2Activity
4
Activity
4Activity
5
Activity
5
Activity
3
Activity
3
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
66
Classify Activities into Three Categories
1. Customer Value Add (CVA)
Sometimes referred to as only true Value Add (VA)
2. Non-Value Add Required (NVA-R)
Sometimes referred to as Value Enabling (VE) and Business Value Add (BVA)
3. Non-Value Add (NVA)
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
67
Customer Value Add (CVA) Definition
Any activity in a process that is essential to deliver a product or service to the customer and meets all 3 criteria:
1. Must be performed to meet customer needs
2. Adds form, function or feature to the service or product
Enhances service quality, enables on time or more competitive delivery, or has a positive impact on price competition
3. Is done right the first time
Those tasks which the customer would be willing to pay for if he/she knew you were doing it (i.e., has value to the customer)
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
68
Non-Value Add-Required (NVA-R) Definition
Activities that allow greater effectiveness or efficiency in a process
Activities that are required by the business but add no real value from a customer standpoint (e.g.: obtain the order, provide a bill, safety activities, regulatory compliance activities)
Questions that can be asked to determine Non-Value Add-Required activities:
Does this task reduce owner financial risk?
Does this task support financial reporting requirements?
Would the process break down if this task were removed?
Is this task required by law or regulation?
Non-Value Add-Required tasks should be questioned and, where possible, reduced
These are NOT activities which we currently perform because „that is just the way we do it today!‟
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
69
Non-Value Add (NVA) Definition
Activities that are not Customer Value Add or Non-Value Add Required
Activities which are not required to meet or exceed customer needs and are not required by the business
Non-Value Add activities add waste to the process
Non-Value Add (NVA) tasks typically include:
Handling
Inspecting
Transporting
Non-Value Add activities should be eliminated
Storing
All Rework Loops
Multiple Signatures
Moving
Counting
Delaying
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
70
Note: Some references refer to “TIMWOOD” instead:
1. Transportation (moving material/product from one place to another)
2. Inventory (material/product waiting to be processed)
3. Motion (excess movement and/or poor ergonomics)
4. Waiting (delays caused by shortages, approvals, downtime)
5. Overproduction (producing more than is needed)
6. Over processing (adding value for which the customer is not willing to pay)
7. Defects/Rework (correcting mistakes)
Lead Time can only be minimized by the elimination of the Eight Types of Waste (“Downtime”)
Waste Increases Lead Time
1. D - Defects2. O - Overproduction3. W - Waiting4. N - Nonstandard/Overprocessing5. T - Transportation6. I - Intellect7. M - Motion8. E - Excess Inventory
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Process Step
Time (Hours)
Value-Added
Non-value-added
Fixing errors
Control/Inspection
Delay
Prep/Set-up
Transporting/Motion
Total
1 2 3 4 5 6 7 8 9 10 Total %Total
12 10 1 10 20 6 10 1 10 20 100 100%
2
6
52
30
100
10
2%
6%
52%
30%
10%
100%
Value Analysis Matrix
You can track specific types of non-value-added time with a value analysis matrix. This helps clarify not only the types of waste present in the process, but also the percentage of the overall process each non-value-added step adds.
MEASURE: Create Detailed Process Maps
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Design Refinement: Productivity Analysis
Step P R I M E D O T S Action(s)Step 1 X Action 1
Step 12 X Action 5
P = Personnel efficiency possible D = Delays can occur in this step
R = Rework created O = Overproduction caused
I = Indirect cost reduction T = Transportation of materials, personnel,
information is unnecessaryM = Mistake earlier in the process causes this step
E = Eliminate this step? S = Simplification of overly-complicated step
possible
P R I M E D O T S Actions1 Update of EMS with new plant information X Quarterly review and update plant information on EMS
2 Determine number of plants to be audited (EMS)
3 Request information on plant maturity, risk and audit timing
4 Evaluate every plant against agreed criteria (DIVISION)
5 Prioritize based on risk and audit timing (DIVISION)
6 Comunicate prioritized plant list to audit group (DIVISION) X Ask for required information in advance and frequent follow up.
7 Collect prioritized list from divisions
8 Any new process identified in the prioritized list?
9 Request information regarding new process
10 Provide information regarding new process
11 Development and inclusion of the new module X Quarterly survey with Division to identify new processes.
12 Update prioritized list
13 Compare mandays required with mandays available
14 Are sufficient auditors available within SBU? X X Identify and prepare an external pool of auditors
15 Are there auditors available in other SBU´that can be used? X Get access to information on auditors in other SBU´s
16 Re-evaluate prioritized list to focus on risk priority X Ensure there are sufficient trained auditors availab le with the required skills
17 Do auditors have required process knowledge? X Ensure there are sufficient trained auditors availab le with the required skills
18 Do auditors have required language skill? X Ensure there are sufficient trained auditors availab le with the required skills
PRODUCTIVITY ANALYSIS
STEP
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
73
Goal Is to Reduce Lead Time
For each activity, step, or task in the process, classify it as:
Customer Value Add
Non-Value Add Required
Non-Value Add
Brainstorm ways to:
Eliminate Non-Value Add activities (typically 80+% of the Lead Time
reduction opportunity)
Improve Customer Value Add activities
Reduce NVA-R activities
Value Add Non Value AddValue Enabling
Activity/Task
No
Yes No
Yes Yes
No
Optimize Reduce Eliminate
Necessary toProduce Output?
Contribute toCustomer Needs?
Contribute to theBusiness Owners?
No
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
74
How Does Lead Time Affect Quality?
Reduce cost through better utilization of resources
Improve customer satisfaction
Reduce inventory
Reducing Lead Time benefits quality
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
75
Typically the largest contributor to process lead time is non-value add activities, while the smallest contributor is Customer Value Add activities
Process Lead Time
Process Lead Time (PLT) is the total time to complete an activity or process.
E.g. order entry, create purchase order, hotel check in
CVA NVA-
RequiredNon-Value Add
PLT
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
76
Non-Value Added Analysis Approach
Reduce Lead Time By Eliminating Waste!
Customer Value AddedNon-Value Add NVA - Required
Non-Essential (Waste)
2. Reduce1. Eliminate 3. Improve
Essential (NVA)
Lead Time Reduction
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
77
CVA, NVA-R, and NVA Activities
Customer Value Add (CVA)
Any step in a process that is essential to deliver a service to the customer
Must be performed to meet customer needs
Adds function, form or feature to the service
Enhances service quality, enables on time or more competitive delivery, or has a positive impact on price competition
Those tasks which the customer would be willing to pay for
Non-Value Add Required (NVA-R)
Activities that allow greater effectiveness or efficiency in a process
Activities that are required by the business but add no real value from a customer standpoint
NVA-R tasks should be questioned: Does it reduce financial risk? Does it support financial
reporting requirements? Would the process break down
if this task were removed? Is it required by law or
regulation?
Non-Value Add (NVA) Activities that are not value
add or NVA-R
Activities which are not required to meet or exceed customer needs and are not required by the business
Non-Value Add activities add waste to the process
Non-Value Add (NVA) tasks typically include: Handling Inspecting Transporting Moving Counting
Non-Value Add activities should be eliminated
Delaying Storing Rework Loops Multiple
Signatures
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
78
Exercise: Conduct a VA/NVA Analysis
Objective
Conduct a NVA Analysis for GGA's Budget Department
Instructions
For each step in the Value Stream Map, determine if it is:
1. Customer Value Added (put a Green X above the sticky note)
2. Non-Value Added Required (put a Yellow X above the sticky note)
3. Non-Value Added (put a Red X above the sticky note)
Time = 15 Minutes
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
- Example -
Detailed “As Is” Process Map Template
Required Deliverable - VSM or Process Map or Both
78
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Order Mgmt Supervisor
CUSTOMER
DISTOrder MgmtOrder MgmtOrder Mgmt Order Mgmt
Screen for Acct Mgr
Order Mgmt
P/T = 2 min
Error Rate=2%
Volume=800
P/T = 6 Min
Error Rate=0%
Volume=800
P/T = 6 Min
Error Rate=2%
Volume=800
P/T = 2 Min
Error Rate=1%
Volume=800
20 Orders
3 min
Phone Call
Large
Business
Home
6 Customers
5 Customers
3 Customers
Small
Business
Customer
Info4
Product
Need4Pricing
4
Shipping
Info4
P/T = 3 min
Lost calls=10%
Volume=1200
Pick
Pack & Ship
P/T = 120 Min
Error Rate=1%
Volume=1200
10
2 min 6 min 6 min 2 min 120 min
240 min5 min
Customer call time = 24 min
Service lead time = 384 min
SUPPLIERSManual Update
Weekly Update
Phone Call
Trigger:
Completion Criteria:
Cycle Time:
Takt Time:
Number of People:
Number of Approvals:
Items in Inbox:
% Rework:
# of Iterations (cycles):
# of Databases:
Top 3 Rework Issues:
1.
2.
3.
- Example -
Required Deliverable - VSM or Process Map or Both
Value Stream Map Template
79
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
Process Constraint ID Analysis Template
Takt Rate Analysis compares the task time of each process (or process step) to other steps and customer demand to determine if the time trap is the constraint
Value Add Analysis - Current State
0
10
20
30
40
50
60
70
80
1 2 3 4 5 6 7 8 9 10
Task #
Task T
ime (
seco
nd
s)
CVA Time NVA-R Time NVA Time
Takt Time = 55
Takt Rate = Customer Demand Rate =Net Process Time AvailableNumber of Units to Process
Takt Time = Number of Units to ProcessNet Process Time Available
- Example -
BB Optional Deliverable80
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
81
Takeaways
Value Added/Non-Value Added (VA/NVA) analysis is essential to process improvement
It reduces process Lead Time, reduces process complexity and thus errors
VA/NVA can be used on any process flow which has been mapped
VA/NVA typically occurs in the Analyze Phase on our detailed „As-Is‟ process map or value-stream map
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
What other comments or questions
do you have?
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
84
References
Visio Software
Harrington, H. James, Business Process Improvement,McGraw Hill, Inc. 1991, ISBN # 0-07-026768-5
ABC Flowchart 4.0
Rother, M., & Shook, J. (1999). Learning to see: Value stream mapping to add value and eliminate muda. Brookline, MA: The Lean Enterprise Institute
National GuardBlack Belt Training
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
APPENDIX A
Specialized Process Mapping Tools
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
86
Input/Output Analysis
Time/Value Analysis
Defect Fall-Out Sheet
Spaghetti Chart
Specialized Process Mapping Tools
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
87
Input/Output Analysis
Product Need PricingCustomer Info
7
Validate6 64
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
88
How do little y‟s relate to big Y‟s? What if they don‟t?
List Output Variables (“y”) for Each Step (Process and Product)
Standard Product or Custom?Complete History? Discounted Price?
Product Need PricingCustomer Info
7
Validate6 64
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
89
List Inputs (“x”) for Each Process Step
How do the x‟s relate to big Y‟s and small y‟s?
Customer Input Screen
Customer Account Number
Customer Data
Product Catalog
Options List
Pricing List
Customer Discount List
Standard Product or Custom?Complete History? Discounted Price?
Product Need PricingCustomer Info
7
Validate6 64
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
90
X Critical
N Noise
S Standard Operating Procedure (SOP)
C Controllable
Characterize the Inputs (“x”)
S Customer Input Screen
X Customer Account Number
X Customer Data
N Attention/Attitude of Rep
C Product Catalog
X Options List
C Pricing List
X Customer Discount List
C Training on Discounts
Standard Product or Custom?Complete History? Discounted Price?
Product Need PricingCustomer Info
7
Validate6 64
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
91
SOP
Critical
Key Process Input Variables (KPIVs)
Noise Inputs (N): Input variables (X‟s) that impact the output variables (Y‟s) but are difficult, impossible or we choose not to control. Example: Environmental variables such as regulations, humidity, temperature.
Standard Operating Procedures (SOP): A standard procedure for running the process
Controllable Inputs (C): X‟s that can be changed to see the effect on Y‟s. Sometimes called “Knob” Variables.
Critical Inputs (X): X‟s that have been statistically shown to have a major impact on the variability of the Y‟s
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
92
Input/Output Analysis
Time/Value Analysis
Defect Fall-Out Sheet
Spaghetti Chart
Specialized Process Mapping Tools
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
93
Time/Value Analysis
Determine process lead time
Determine queue times between steps and task time
Create step segments proportional to the task times
Place steps, queue's along the line segment in the order that they happen
Place VA steps above the line
Place NVA-R & NVA steps below the line – can be different
The white space between boxes for queue time
Draw in feedback loops and label yield percentages
Sum activity/non-activity times
Sum value/non-value times
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
94
Example Time/Value Analysis
25%
Queue = 60 m
Activity = 45 m
CVA = 5 m
NVA-R = 25 m
NVA = 60 m
PLT = 105 m
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
95
Input/Output Analysis
Time/Value Analysis
Defect Fall-Out Sheet
Spaghetti Chart
Specialized Process Mapping Tools
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
96
Defect Fall-Out Sheet
Step 1 Step 2 Step 3 Step 4 Step 5 Step 6
Defect Services: 0.5 0.2 0.7 0.1 14% rewkd. 12.0 0.3Embodied 71% successCosts* Each: 0.14 0.22 0.28 0.34 0.22(rw)** 1.32 1.72
1.54 (sc)
Rework
Note: Per 100 services released:
• Cost of each defect, to this point in the process, including supply cost** • Per 100, 14 are reworked: 10 are “saved” at cost of 0.22 each; 4 are lost at cost of 1.54 each
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
97
Input/Output Analysis
Time/Value Analysis
Defect Fall-Out Sheet
Spaghetti Chart
Specialized Process Mapping Tools
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
98
Spaghetti Chart
Purchasing
Accounting
Scheduling
ChemicalWarehouse
VP Conference Room
General Office Staff
Sales
CustomerService
Conf RoomL
ogistics
Bathroom
1
2
5
9
8
76
3
4
11
14
1312
10
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
99
Example:
Completed Current State VSM
99
Order Mgmt Supervisor
CUSTOMER
DISTOrder MgmtOrder MgmtOrder Mgmt Order Mgmt
Screen for Acct MgrOrder Mgmt
P/T = 2 min
Error Rate=2%
Volume=800
P/T = 6 Min
Error Rate=0%
Volume=800
P/T = 6 Min
Error Rate=2%
Volume=800
P/T = 2 Min
Error Rate=1%
Volume=800
20
Orders
3 min
Phone Call
Large
Business
Home
6 Customers
5 Customers
3 Customers
Small
Business
Customer
Info4
Product
Need4Pricing
4
Shipping
Info4
P/T = 3 min
Lost calls=10%
Volume=1200
Pick/Pack & Ship
P/T = 120 Min
Error Rate=1%
Volume=1200
10
2 min 6 min 6 min 2 min 120 min
240 min5 min
Customer call time = 24 min
Service lead time = 384 min
SUPPLIERSManual Update
Weekly Update
Phone Call
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
100
Example: Time Study FormFor Deeper Understanding of Lead Time of Each Step
Date Date Observer
1 2 3 4 5 6 7 8 9 10
Clock
Elapsed
Clock
Elapsed
Clock
Elapsed
Clock
Elapsed
Clock
Elapsed
Clock
Elapsed
Clock
Elapsed
Remarks
Subprocess
Task Description
Be
st
Re
pe
ata
ble
Tim
e
Sta
nd
ard
De
via
tio
nProcess
Observed Cycles
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
101
Flow Process Chart
C hart: She et: Su mmary
Produ ct or Output: Activi ty Present Prop osed Saving
Wo rk ¡
Activity: Tra nsport à
De lay
Method: Inspection �Storag e Ñ
Distance (m)
Location: Time
Worke rs: Wo rk shift no: Co st
Prepa re d b y:
App ro ve d b y: Da te: Labour expenses
Ma terial co st
Total
Symb olD escripti on Quantities
Distance
(m)
Time
(dm)¡ à � Ñ
Remarks
1
2
3
4
5
6
7
8
9
1 0
1 1
1 2
1 3
1 4
1 5
1 6
1 7
1 8
1 9
2 0
2 1
2 2
2 3
2 3
2 4
2 5
2 6
2 7
2 8
2 9
From: 100 Management Charts,by Soichiro Nagashima, www.apo-tokyo.org
Example:
Process Flow Data Gathering Template
Templates (like at left), or just Paper & Pencil, can be used to get started
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
102
Example:
Process Observation Form
From: ACTION Field Manual, © 2003 Malcolm T. Upton, University of Phoenix Doctor of Management Candidate