From the Basement to the West WingThe Talking Book & Braille Service’s New Space
Lower level space
• Occupied for 20 years
• Housed most of talking books collection, tape duplication, recording studios, meeting room, computer training room, break room, storage
• After years of problems with being in the lower level, an alternative space became available on 1st floor of our building
Considerations for move
• Is the space large enough for stacks and rooms?
• Good location for building recording booths?
• What improvements could be made to improve the quality and efficiency of our work?
• Long range considerations
Lower Level space
New 1st floor space
Initial measurements
• Total square footage of lower level: 12, 845
• Total square footage of “West Wing” 7937
• Reduction of 4908 sq. ft.
• Shelving, lower level: 1713 linear ft.
• “West Wing” space for shelving: roughly 969 linear ft
• Time for careful measurements!
More planning
Working with designer
• After initial planning by hand, architectural firm Innerspace helped with formal design
• Three part planning: demolition, construction, moving
• Remodeling narrative details detailed elements of the work
Demolition plan
Construction plan
Systems to consider
• Data and telephone wiring and jacks
• Electrical needs
• HVAC needs
• Intercom system
• Plumbing for room remodeling
• Fire alarm
• Finishes: paint, carpet
Recording studios
• Due to the unique construction needs of studios, these were almost a project within a project
• Digital recording means more postproduction, review, navigation markup, and this means new workspaces
• Working with modular booth designs a good approach for quality and cost
Preliminary design
Final layout
• space has to work around a structural pillar
• Project must go through bidding process
The process begins
• Demolition takes place in summer and fall of 2014
• Several walls are removed to create larger spaces
• A set of offices is removed for recording booths
• A shower is converted into a small break room
• Training room made out of an office and server room
Recording booths arrive
HVAC and wiring above
Work in progress
Shelving installation
Books make the move
New studio technology
The new space
The “West Wing”
Front entry
Volunteer check-in
Studios and circulation
Offices
Mail processing
Cardinal Room
Duplication and Post
Kitchenette
Narrator booths
Producer booths
Review and Markup
Finished studios
Empty basement!
1st floor signage