August 24, 2016

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

Martin Luther King Jr. Memorial Library Rehabilitation and Modernization

Section 106 Consulting Party Meeting August 24, 2016

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

2August 24, 2016

1. Process Update2. Consulting Party Comments3. Design Update4. Memorandum of Agreement5. Project Schedule

Meeting Agenda

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

3August 24, 2016

Process Update

Meeting #110/2014

Meeting #211/2014

Meeting #307/2015

Meeting #412/2015

Meeting #508/2016

Sect

ion

106

InformationalPresentation12/2014

NCP

CCF

AH

PRB

ConceptReview01/2016

InformationalPresentation01/2015

ConceptReview07/2015

InformationalPresentation01/2015

ConceptReview072015

Response to CP Comments05/2016

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

4August 24, 2016

Consulting Party Comments

Design Approach &

Library Program

Design GuidelinesDC Archives Co-location

Building ProgramCommunity Alliances

Space Planning & Adjacencies

Building Exterior & Site

Exterior Curtain WallEast Ramp and Plaza

G Street Plaza

Building Interior

Vestibule and CoresGreat Hall

Digital CommonsUpper Floor Corridor Walls

Auditorium Accessibility and CirculationMartin Luther King, Jr. Exhibit and Memorial

New and Existing FurnitureSmall-Scale Features

Interior FinishesLighting

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

5August 24, 2016

Building Exterior & Site

1. Exterior Curtain Wall2. East Ramp and Plaza3. G Street Plaza

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

6August 24, 2016

Exterior Curtain WallBUILDING ENVELOPE - EXISTING

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

7August 24, 2016

Exterior Curtain Wall

Steel Coating Mock-ups

Glass Mock-up Locations

Steel Coating Mock-ups

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

8August 24, 2016

East Ramp and Plaza

Existing Conditions

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

9August 24, 2016

East Ramp and Plaza

1st Floor Diagram

loading dock

vestibule

cafedigital commons

meeting rooms

program space

Great Hall

digital commons staff

cafe patio

popular library

DC visitor center

0' 16' 32' 64'

N

FIRST FLOOR PLANPAGE 5

MARTIN LUTHER KING JR. MEMORIAL LIBRARY REHABILITATION AND MODERNIZATIONMEMORANDUM OF AGREEMENT DRAFT - APPENDIX A

First Floor Plan Detail

Current ProposalDecember 2015 Option #1

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

10August 24, 2016

G Street PlazaSITE WALLS AT G STREET LOGGIA

EXISTING SITUATION PROPOSED SITUATION

Design Concepts

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

11August 24, 2016

Building Interior

1. Vestibule and Cores2. Great Hall3. Digital Commons4. Upper Floor Corridor Walls5. Auditorium Accessibility and

Circulation

6. Martin Luther King, Jr. Exhibit and Memorial

7. New and Existing Furniture 8. Small-Scale Features9. Interior Finishes10. Lighting

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

12August 24, 2016

Existing Conditions

May 2014 Proposal

Vestibule and Cores

December 2015 Proposal

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

13August 24, 2016

Current Proposal

Vestibule and Cores

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

14August 24, 2016

December 2015 Options Presented

Current Proposal

Opposite Wall Shown

Vestibule and Cores

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

15August 24, 2016

Great Hall

December 2015 Proposal

Current Proposal

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

16August 24, 2016

Great Hall

Current Proposal

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

17August 24, 2016

December 2015 Proposal

Current Proposal

Digital Commons

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

18August 24, 2016

Current Proposal

Digital Commons

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

19August 24, 2016Current Proposal - Third Floor

December 2015 Proposal

Upper Floor Corridor Walls

Current Proposal - Second Floor

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

20August 24, 2016

Auditorium Accessibility & Circulation

DIGITALCOMMONS

GREAT HALL

LOADING DOCK

DC WELCOMECENTER

Public Elevators Layout and General Information

* Handling capacity is an approximation based on industry standards provided by Lerch Bates

G PLACE

G STREET

9TH

STR

EE

T

N

Not to Scale

E6 (Shared, Public & Staff)

E7

E1E2

E3

Elevator # Speed

Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed

E1 4000 lbs 2,500 lbs 7'-8" x 5'-5" 6'-1" x 3'-10" 42sf 23sf 15 10 Yes No 350fpm

E2 4000 lbs 2,500 lbs 7'-8" x 5'-5" 6'-1" x 3'-10" 42sf 23sf 15 10 Yes No 350fpm

E3 2,100 lbs 2,500 lbs 5'-8" x 4'-3" 6'-1" x 3'-10" 24sf 23sf 10 10 No No 350fpm

E6 5000 lbs N/A 7'-5" x 5'-8" N/A 42sf N/A 15 N/A Yes No 350fpm

E7 2,100 lbs 2,500 lbs 5'-8" x 4'-3" 6'-1" x 3'-10" 24sf 23sf 10 10 No No 350fpm

ADA CompliantCapacity Car Size Car AreaMaximum Handling

Capacity per Trip*

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

21August 24, 2016

Auditorium Accessibility & Circulation

PUBLIC ELEVATOR HANDLING CAPACITY DURING PEAK HOURS:

120 PERSONS EVERY 5 MINUTES

PUBLIC ELEVATOR HANDLING CAPACITY DURING AUDITORIUM PERFORMANCE ONLY:

325 PERSONS EVERY 5 MINUTES

NOTE: All calculations are approximations based on industry standards provided by Lerch Bates as referenced in the Vertical Transportation Analysis Report for theRenovation of the Martin Luther King Jr Library issued July 01, 2016.

Provides "Good" Level of service

Assumes intermediate stops within a single round trip

Total for all public elevators

Provides service for 100% of the Auditorium population

Assumes NO intermediate stops in a single round trip

Total for all public elevators

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

22August 24, 2016

Library Program Design Approach

PASSIVE ACTIVE

QUIET

LOUDPUBLIC

STAFF

COMMMUNITY / ASSEMBLY

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

23August 24, 2016

Design Guidelines/Historic Structure Report

MARTIN LUTHER KING JR. MEMORIAL LIBRARY

DESIGN GUIDELINES

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

24August 24, 2016

Memorandum of Agreement (MOA)1. NCPC determined that the project would cause adverse effects on the

Martin Luther King, Jr. Memorial Library and DCSHPO concurred.

2. A Memorandum of Agreement documents measures to avoid, minimize, and mitigate adverse effects.

3. Signatories:

• NCPC• DCPL • DCSHPO

4. Draft MOA distributed with Environmental Assessment on August 2, 2016.

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

25August 24, 2016

The MOA identifies topics for additional consultation:1. Building envelope and glazing2. Enclosures in west reading rooms3. Lighting4. Landscape5. Material finishes – interior public spaces6. Small scale features7. Art commissions – exterior and interior8. Signage9. Exhibit Space10. New elements for 1st floor landmarked space

Design ConsultationConsulting Party

Comments:

Martin Luther King, Jr. Exhibit and Memorial

New and Existing FurnitureSmall-Scale Features

Interior FinishesLighting

Landscape

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

26August 24, 2016

Martin Luther King, Jr./Mies van der Rohe Exhibits1. A permanent exhibit to honor King and his work in

D.C. as well as Mies van der Rohe and the building’s historical and architectural significance.

An online/web-based resource on the history of the MLK Library1. To include information on the rehabilitation design

and process.

Video Interpretation of MLK Library1. A video on the historic significance of the MLK Library within the context of the work of Mies

van der Rohe.

Mitigation

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

27August 24, 2016

Architectural Salvage and Preservation1. A plan for the salvage, reintegration, and/or

preservation of existing building elements and materials that were identified as character-defining features in the MLK Library Design Guidelines.

Historic American Building Survey (HABS) Documentation1. HABS Level 1 documentation on the MLK Library

building.

Mitigation

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

28August 24, 2016

D.C. Archaeological Collections Storage and Exhibit Space1. Collections Agreement Plan (CAP) to store all, or

a portion of, the DCSHPO-owned and managed archaeological collection (archaeological collection) within the MLK Library.

2. A portion of the MLK Library exhibit spaces will be used to create temporary exhibits utilizing a portion of the DCHPO’s archaeological collections.

Mitigation

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

29August 24, 2016

EA Comment PeriodAugust 2 - September 6

Finalize MOAAugust-September 2016

NCPC Preliminary and Final ReviewOctober 6, 2016*

CFA Final ReviewOctober 20, 2016

* NCPC final review in October 2016 is dependent on completion of NEPA and Section 106 documentation.

Project Schedule

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

30August 24, 2016

This presentation will be posted to the NCPC website at:

www.ncpc.gov/project/mlklibrary

Consulting parties and the public may submit questions or comments on these materials by

Tuesday, September 6, 2016(Public comment period for the EA closes on September 6)

Comments and questions can be addressed to:Jennifer Hirsch, Federal Preservation Officer, NCPC

[email protected]

Opportunities for Comment

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

31August 24, 2016

Reference Floor Plans

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

32August 24, 2016

B LEVEL PLAN

Parking

0' 16' 32' 64'

N

B- LEVEL PLANPAGE 3

MARTIN LUTHER KING JR. MEMORIAL LIBRARY REHABILITATION AND MODERNIZATIONMEMORANDUM OF AGREEMENT DRAFT - APPENDIX AB Level Floor Plan

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

33August 24, 2016

A-Level

creative lab

back of house staff area

fabrication lab

public restrooms

back of house staff area

0' 16' 32' 64'

N

A- LEVEL PLANPAGE 4

MARTIN LUTHER KING JR. MEMORIAL LIBRARY REHABILITATION AND MODERNIZATIONMEMORANDUM OF AGREEMENT DRAFT - APPENDIX AA Level Floor Plan

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

34August 24, 2016

1st Floor Diagram

loading dock

vestibule

cafedigital commons

meeting rooms

program space

Great Hall

digital commons staff

cafe patio

popular library

DC visitor center

0' 16' 32' 64'

N

FIRST FLOOR PLANPAGE 5

MARTIN LUTHER KING JR. MEMORIAL LIBRARY REHABILITATION AND MODERNIZATIONMEMORANDUM OF AGREEMENT DRAFT - APPENDIX AFirst Floor Plan

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

35August 24, 2016

2nd Floor Diagram

public restrooms public restroomsback of house staff area

teen area

center for accessibility staff

adult literacy staff

children’s area

children’s area staff

center for accessibility

computer learning

adult literacy

community alliancescomputer learning

0' 16' 32' 64'

N

SECOND FLOOR PLANPAGE 7

MARTIN LUTHER KING JR. MEMORIAL LIBRARY REHABILITATION AND MODERNIZATIONMEMORANDUM OF AGREEMENT DRAFT - APPENDIX ASecond Floor Plan

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

36August 24, 2016

3rd Floor Diagram

public restrooms public restroomsback of house staff area

executive offices

adult collection staff

adult collection

adult collection

collaboration / co working /study spaces

0' 16' 32' 64'

N

THIRD FLOOR PLANPAGE 8

MARTIN LUTHER KING JR. MEMORIAL LIBRARY REHABILITATION AND MODERNIZATIONMEMORANDUM OF AGREEMENT DRAFT - APPENDIX AThird Floor Plan

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

37August 24, 2016

4th Floor Diagram

public restrooms public restroomsback of house staff area

special collections

void to 3rd floor

exhibition spaceexhibition space

conference center

special collections

auditorium

main entrance auditorium main entrance auditorium

0' 16' 32' 64'

N

FOURTH FLOOR PLANPAGE 9

MARTIN LUTHER KING JR. MEMORIAL LIBRARY REHABILITATION AND MODERNIZATIONMEMORANDUM OF AGREEMENT DRAFT - APPENDIX AFourth Floor Plan

Martin Luther King, Jr. Memorial LibraryWashington, D.C.

38August 24, 2016

5th Floor Diagram

mechanical catering kitchenpublic restrooms

auditorium

break-out area

staff lounge events space

public roof garden

0' 16' 32' 64'

N

FIFTH FLOOR PLANPAGE 10

MARTIN LUTHER KING JR. MEMORIAL LIBRARY REHABILITATION AND MODERNIZATIONMEMORANDUM OF AGREEMENT DRAFT - APPENDIX AFifth Floor Plan