PROJECT FOR ONE UNIT DOUBLE-STOREY SEMI DETACHED HOUSE (TYPE A) ON LOT 1774, MUKIM KAPAR DAERAH KLANG, SELANGOR DARUL EHSAN.
PROPOSED CONSTRUCTION AND COMPLETION OF ONE UNIT DOUBLE-STOREY SEMI-DETACHED HOUSE (TYPE A)
ON LOT 1774, MUKIM KAPAR DAERAH KLANG, SELANGOR DARUL EHSAN
FOR: EN. SHAHAR SHAM MD NOR
NO. 34A, JALAN KOTA RAYA E27/E, SEKSYEN 27, HICOM TOWN CENTRE, 40400 SHAH ALAM, SELANGOR DARUL EHSAN.
C&S ENGINEER
PERUNDING TRUSSMAJU SDN BHD
8-2B, JALAN BOEING PADANG E13/E, SEKSYEN 13, 40100 SHAH ALAM, SELANGOR DARUL EHSAN.
2
ARCHITECT
ARKITEK URBANISMA
SUITE E411, EAST WING, 4TH FLOOR, WISMA CONSPLANT 1, NO.2, JALAN SS 16/4, 47500 SUBANG JAYA, SELANGOR DARUL EHSAN.
M&E ENGINEER
SIGNTECH M&E ENGINEER
SDN BHD NO.11-B, JALAN DAYA 11, TAMAN DAYA KEPONG, WILAYAH PERSEKUTUAN, 52100 KUALA LUMPUR.
QUANTITY SURVEYOR
SHINE CONSULTANTS SDN BHD
LEVEL 2, MENARA TSR 10, JALAN PJU 7/2, MUTIARA DAMANSARA, 47810 PETALING JAYA, SELANGOR DARUL EHSAN.
SCOPE OF WORK
LOCATION
LOT 1774, MUKIM KAPAR DAERAH KLANG, SELANGOR DARUL EHSAN
GROUND FLOOR PLAN
FIRST FLOOR PLAN
ROOF PLAN
ELEVATION (FRONT)
ELEVATION
(RIGHT & LEFT)
SECTION B-B
SCHEDULE OF FINISHES
11
SCHEDULE OF FINISHES
12
Type of Wall Finishes (Kitchen)
Type of Wall Finishes (Bedroom)
● Paint-ICI dulux standard colour-internal emulsion luxury, water base, pearl glo
FORM OFCONTRACT
FORM OF CONTRACT
PAM Contract 2006 (With Quantity)
Which consist of Article of Agreement and also contain Condition of Contract
TENDERDOCUMENTS
FORM OF TENDER
Tenderer would insert his tender amount and proposed completion time & agreement to validity period.
Becomes a legal offer to the employer when signing / company seal
INSTRUCTION TO TENDERER
States the rules and procedures needed to be complied throughout the tendering period.
CONDITIONS OF TENDERING
States the conditions needed to be complied with by the tenderer for the submission of tender.
FINAL SUMMARY OF TENDER
Collection of all priced bills for all sections of the project.
The tenderer insert his sectional summary to arrive at a total amount which ultimately becomes the ‘tender amount’.
PREAMBLES
Contain clauses that serve to introduce and explain the provisions in the ‘Specification” & ‘Bills of Quantities’ sections & the scope of coverage of the rates in the BQ.
SPECIFICATION & WORKMANSHIP
Contain detail procedures to be followed, and also requirements and description of work to be performed
BILL OF QUANTITIES
BILL NO.1 PRELIMINARIES
BILL NO.2MAIN BUILDING WORKS
BILL NO.3PC & PROVISIONAL SUM
BILL NO.1 PRELIMINARIES
Employer’s requirements and contractor’s obligation in carrying out the works.
● Name of parties● Description of Parties● Facilities to be provided
by the contractor● Application for
necessary permit & license
● Schedule for inspections, records submissions etc
What is included in Preliminaries:
1. DEFINITION
2. SCOPE OF WORK
3. SITE (LOCATION)
4. TENDER AND DOCUMENTS
5. DRAWINGS
6. PLANT AND TEMPORARY WORKS
7. MATERIALS AND WORKMANSHIP
8. CONTRACT
9. INSURANCE
10. NOMINATED SUB-CONTRACTORS,SUPPLIERS & OTHERS
11. STATUTORY COMPLIANCE, CONTRACTUAL & WORKS OBLIGATION
12. PROTECTION, PRECAUTION & PREVENTION
13. CLEARING AND CLEANING
BILL NO.2 MAIN BUILDING WORKS List of Element
1. PILING WORKS
2. WORK BELOW LOWEST FLOOR
FINISH (PILECAP, GROUND
BEAMS, COLUMN STUMPS,
GROUND FLOOR SLAB)
3. FRAME (COLUMNS, FLOOR
BEAMS, ROOF BEAMS)
4. UPPER FLOORS
5. ROOF (ROOF SLAB & FINISHES,
ROOF TRUSSES & COVERING,
RAINWATER PLUMBING)
6. STAIRS, HAND RAILING AND
BALUSTRADING AND FINISHES
7. EXTERNAL WALL
8. INTERNAL WALLS AND
PARTITIONS
9. WINDOW
10. DOORS AND IRONMONGERY
11. INTERNAL WALL FINISHES
12. INTERNAL FLOOR FINISHES
13. INTERNAL CEILING FINISHES
14. EXTERNAL FINISHES
15. EXTERNAL WORKS WITHIN LOT
BOUNDARY
BILL NO.3PC & PROVISIONAL SUM
PC (PRIME COST)
Specialized works carried out by nominated sub- contractors or goods supplied by nominated suppliers. Prime cost sums are exclusive of profit and attendance.
BILL NO.3PC & PROVISIONAL SUM
PROVISIONAL SUM
Provisional sums are works that cannot be described and quantified in accordance with the rules of the various standard methods of measurement during tendering stage. Provisional sums should be inclusive of profit.
SCHEDULE OF DAYWORK RATES
For tenderers to fill in daywork rates for labour and machineries.
Daywork rates form the basis of payment for daywork ordered by the Architect.
Avoid protracted argument on the reasonable rates used.
FORM OF BANK GUARANTEE FOR EARNEST MONEY
A standard form with pre-determined wordings for the tenderer’s sourcing of a bank guarantee for earnest money in the event of a successful tender.
FORM OF BANK GUARANTEE FOR PERFORMANCE BOND
A standard form with pre-determined wordings for the tenderer’s sourcing of a bankguarantee for performance bond in the event of a successful tender.
LIST OF DRAWINGS
PRE-TENDER PROGRESS SCHEDULE
33
THANK YOUWONG JIA JING - 0327221
YEAP PHAY SHIAN - 0322243LEW QUO MING - 0322884
YEE JYH LIN - 0322408MUHAMMAD ROS ASYRAF - 0331376
LIEW WEI ZHEAN - 0331225SOO PING ZHENG - 0331365
VIVIAN CHIN KHA YEE - 0331228
34