PROJECT FOR ONE UNIT DOUBLE-STOREY SEMI DETACHED HOUSE (TYPE A) ON LOT 1774, MUKIM KAPAR DAERAH KLANG, SELANGOR DARUL EHSAN.

Measurement Assignment

Embed Size (px)

Citation preview

Page 1: Measurement Assignment

PROJECT FOR ONE UNIT DOUBLE-STOREY SEMI DETACHED HOUSE (TYPE A) ON LOT 1774, MUKIM KAPAR DAERAH KLANG, SELANGOR DARUL EHSAN.

Page 2: Measurement Assignment

PROPOSED CONSTRUCTION AND COMPLETION OF ONE UNIT DOUBLE-STOREY SEMI-DETACHED HOUSE (TYPE A)

ON LOT 1774, MUKIM KAPAR DAERAH KLANG, SELANGOR DARUL EHSAN

FOR: EN. SHAHAR SHAM MD NOR

NO. 34A, JALAN KOTA RAYA E27/E, SEKSYEN 27, HICOM TOWN CENTRE, 40400 SHAH ALAM, SELANGOR DARUL EHSAN.

C&S ENGINEER

PERUNDING TRUSSMAJU SDN BHD

8-2B, JALAN BOEING PADANG E13/E, SEKSYEN 13, 40100 SHAH ALAM, SELANGOR DARUL EHSAN.

2

ARCHITECT

ARKITEK URBANISMA

SUITE E411, EAST WING, 4TH FLOOR, WISMA CONSPLANT 1, NO.2, JALAN SS 16/4, 47500 SUBANG JAYA, SELANGOR DARUL EHSAN.

M&E ENGINEER

SIGNTECH M&E ENGINEER

SDN BHD NO.11-B, JALAN DAYA 11, TAMAN DAYA KEPONG, WILAYAH PERSEKUTUAN, 52100 KUALA LUMPUR.

QUANTITY SURVEYOR

SHINE CONSULTANTS SDN BHD

LEVEL 2, MENARA TSR 10, JALAN PJU 7/2, MUTIARA DAMANSARA, 47810 PETALING JAYA, SELANGOR DARUL EHSAN.

Page 3: Measurement Assignment

SCOPE OF WORK

Page 4: Measurement Assignment

LOCATION

LOT 1774, MUKIM KAPAR DAERAH KLANG, SELANGOR DARUL EHSAN

Page 5: Measurement Assignment

GROUND FLOOR PLAN

Page 6: Measurement Assignment

FIRST FLOOR PLAN

Page 7: Measurement Assignment

ROOF PLAN

Page 8: Measurement Assignment

ELEVATION (FRONT)

Page 9: Measurement Assignment

ELEVATION

(RIGHT & LEFT)

Page 10: Measurement Assignment

SECTION B-B

Page 11: Measurement Assignment

SCHEDULE OF FINISHES

11

Page 12: Measurement Assignment

SCHEDULE OF FINISHES

12

Page 13: Measurement Assignment

Type of Wall Finishes (Kitchen)

Page 14: Measurement Assignment

Type of Wall Finishes (Bedroom)

● Paint-ICI dulux standard colour-internal emulsion luxury, water base, pearl glo

Page 15: Measurement Assignment

FORM OFCONTRACT

Page 16: Measurement Assignment

FORM OF CONTRACT

PAM Contract 2006 (With Quantity)

Which consist of Article of Agreement and also contain Condition of Contract

Page 17: Measurement Assignment

TENDERDOCUMENTS

Page 18: Measurement Assignment

FORM OF TENDER

Tenderer would insert his tender amount and proposed completion time & agreement to validity period.

Becomes a legal offer to the employer when signing / company seal

Page 19: Measurement Assignment

INSTRUCTION TO TENDERER

States the rules and procedures needed to be complied throughout the tendering period.

Page 20: Measurement Assignment

CONDITIONS OF TENDERING

States the conditions needed to be complied with by the tenderer for the submission of tender.

Page 21: Measurement Assignment

FINAL SUMMARY OF TENDER

Collection of all priced bills for all sections of the project.

The tenderer insert his sectional summary to arrive at a total amount which ultimately becomes the ‘tender amount’.

Page 22: Measurement Assignment

PREAMBLES

Contain clauses that serve to introduce and explain the provisions in the ‘Specification” & ‘Bills of Quantities’ sections & the scope of coverage of the rates in the BQ.

Page 23: Measurement Assignment

SPECIFICATION & WORKMANSHIP

Contain detail procedures to be followed, and also requirements and description of work to be performed

Page 24: Measurement Assignment

BILL OF QUANTITIES

BILL NO.1 PRELIMINARIES

BILL NO.2MAIN BUILDING WORKS

BILL NO.3PC & PROVISIONAL SUM

Page 25: Measurement Assignment

BILL NO.1 PRELIMINARIES

Employer’s requirements and contractor’s obligation in carrying out the works.

● Name of parties● Description of Parties● Facilities to be provided

by the contractor● Application for

necessary permit & license

● Schedule for inspections, records submissions etc

What is included in Preliminaries:

1. DEFINITION

2. SCOPE OF WORK

3. SITE (LOCATION)

4. TENDER AND DOCUMENTS

5. DRAWINGS

6. PLANT AND TEMPORARY WORKS

7. MATERIALS AND WORKMANSHIP

8. CONTRACT

9. INSURANCE

10. NOMINATED SUB-CONTRACTORS,SUPPLIERS & OTHERS

11. STATUTORY COMPLIANCE, CONTRACTUAL & WORKS OBLIGATION

12. PROTECTION, PRECAUTION & PREVENTION

13. CLEARING AND CLEANING

Page 26: Measurement Assignment

BILL NO.2 MAIN BUILDING WORKS List of Element

1. PILING WORKS

2. WORK BELOW LOWEST FLOOR

FINISH (PILECAP, GROUND

BEAMS, COLUMN STUMPS,

GROUND FLOOR SLAB)

3. FRAME (COLUMNS, FLOOR

BEAMS, ROOF BEAMS)

4. UPPER FLOORS

5. ROOF (ROOF SLAB & FINISHES,

ROOF TRUSSES & COVERING,

RAINWATER PLUMBING)

6. STAIRS, HAND RAILING AND

BALUSTRADING AND FINISHES

7. EXTERNAL WALL

8. INTERNAL WALLS AND

PARTITIONS

9. WINDOW

10. DOORS AND IRONMONGERY

11. INTERNAL WALL FINISHES

12. INTERNAL FLOOR FINISHES

13. INTERNAL CEILING FINISHES

14. EXTERNAL FINISHES

15. EXTERNAL WORKS WITHIN LOT

BOUNDARY

Page 27: Measurement Assignment

BILL NO.3PC & PROVISIONAL SUM

PC (PRIME COST)

Specialized works carried out by nominated sub- contractors or goods supplied by nominated suppliers. Prime cost sums are exclusive of profit and attendance.

Page 28: Measurement Assignment

BILL NO.3PC & PROVISIONAL SUM

PROVISIONAL SUM

Provisional sums are works that cannot be described and quantified in accordance with the rules of the various standard methods of measurement during tendering stage. Provisional sums should be inclusive of profit.

Page 29: Measurement Assignment

SCHEDULE OF DAYWORK RATES

For tenderers to fill in daywork rates for labour and machineries.

Daywork rates form the basis of payment for daywork ordered by the Architect.

Avoid protracted argument on the reasonable rates used.

Page 30: Measurement Assignment

FORM OF BANK GUARANTEE FOR EARNEST MONEY

A standard form with pre-determined wordings for the tenderer’s sourcing of a bank guarantee for earnest money in the event of a successful tender.

Page 31: Measurement Assignment

FORM OF BANK GUARANTEE FOR PERFORMANCE BOND

A standard form with pre-determined wordings for the tenderer’s sourcing of a bankguarantee for performance bond in the event of a successful tender.

Page 32: Measurement Assignment

LIST OF DRAWINGS

Page 33: Measurement Assignment

PRE-TENDER PROGRESS SCHEDULE

33

Page 34: Measurement Assignment

THANK YOUWONG JIA JING - 0327221

YEAP PHAY SHIAN - 0322243LEW QUO MING - 0322884

YEE JYH LIN - 0322408MUHAMMAD ROS ASYRAF - 0331376

LIEW WEI ZHEAN - 0331225SOO PING ZHENG - 0331365

VIVIAN CHIN KHA YEE - 0331228

34