Just In Time

ACMA Presentation

Page 3: Just in time

Group Members

• SUBMITTED TO:• PROF Faisal Abbas

• SUBMITTED by• ZUL-NU-RAIN 0009• WAQAR SALEEM 0079• ZAFAR IQBAL 0087

Page 4: Just in time

What Is JIT

• Management philosophy (produce only what is needed when it is needed)

• A highly coordinated processing system in which goods move through the system, and services are performed, just as they are needed

• Represents Pull type system e.g kanban

Page 5: Just in time

History of JIT Manufacturing

• Evolved in Japan after World War II, as a result of their diminishing market share in the auto industry.

• Toyota Motor Company- Birthplace of the JIT Philosophy Under Taiichi Ohno.

• JIT is now on the rise in American Industries.

Page 6: Just in time

Definition

• JIT is a manufacturing philosophy involving an integrated set of procedures/activities designed to achieve a high volume of production using minimal inventories

Page 7: Just in time

More Introduction

• Raw materials, parts & sub assemblies are pulled through the manufacturing process when they are needed.

• Simply put, JIT is a philosophy of “make what is needed … when it is needed”.

Page 8: Just in time

Goal of JIT

• The ultimate goal of JIT is a balanced system.

• Achieves a smooth, rapid flow of materials through the system

• Eliminate disruptions• Make system flexible• Eliminate waste, especially excess

inventory

Page 9: Just in time

Big vs. Little JIT

• Big JIT – broad focus– Vendor relations– Human relations– Technology management– Materials and inventory management

• Little JIT – narrow focus– Scheduling materials– Scheduling services of production

Page 10: Just in time

What JIT Does

• Eliminates waste • Achieves streamlined production • Eliminate disruptions in production …

caused by poor quality, schedule changes, late deliveries.

• Makes the manufacturing delivery system flexible by allowing it to handle a variety of products and changes in the level of output

• Reduces setup and delivery times

Page 11: Just in time

SEVEN WastesTHE SEVEN TYPES OF WASTE OR MUDA

Waste Definition

Overproduction Manufacturing an item before it is needed.

3. Waiting Wasteful time incurred when product is not being moved or processed.

4. Transportation Excessive movement and material handling of product between processes.

5. Motion Unnecessary effort related to the ergonomics of bending, stretching, reaching, lifting, and walking.

Inventory Excess inventory hides problems on the shop floor, consumes space, increases lead times, and inhibits communication.

Defects Quality defects result in rework and scrap, and add wasteful costs to the system in the form of lost capacity, rescheduling effort, increased inspection, and loss of customer good will.

Underutilization of Employees

Failure of the firm to learn from and capitalize on its employees’ knowledge and creativity impedes long term efforts to eliminate waste.

Page 12: Just in time

Sources of Waste

• Overproduction

• Waiting time

• Unnecessary transportation

• Processing waste

• Inefficient work methods

• Product defects

Page 13: Just in time

Strategies For Minimizing Waste By Using JIT

• Manufacturing in smaller lot sizes reduces excess inventory

• Reducing inventory levels allows the problems to be uncovered … thus creating opportunities for manufacturing process improvement

Page 14: Just in time

Principles Of JIT Manufacturing

• Total Quality Management

• Production Management

• Supplier Management

• Inventory Management

Page 15: Just in time

1st Principle Of JIT

Total Quality Management

Page 16: Just in time

Total Quality Management

• Seek long-term commitment to quality efforts with continuous improvement

• Quality must be a higher priority than cost

• Minimizing waste

Page 17: Just in time

Total Quality Management• Eliminate Quality Inspectors

• Quality is everyone’s responsibility

• Do it right the first time

Page 18: Just in time

2nd Principle Of JIT

Production Management

Page 19: Just in time

Production Management

• Pull System vs. Push System– Pull = Made to order– Push = Made for inventory

• Flexibility of the system

• Design For Testability – In the process– Poka-Yoke= Mistake-proofing– Throughout entire process

Page 20: Just in time

Production Management

• Reduced lot sizes= Shorter cycle times

• Eliminate disruptions in the process

• Standardized Parts/ Simplicity

Page 21: Just in time

Production Management

• Communication Techniques– Completion of task-Kanban – Problem- Siren/light

• Stopping the process if something goes wrong =Jidoka

• Preventive Maintenance

Page 22: Just in time

3rd Principle Of JIT

Supplier Management

Page 23: Just in time

Supplier Management

• Establish Long Term Relationships with few suppliers.

• Delivery of Parts = 100% Defect Free– Where they are needed– When they are needed– The exact quantity

• Work Together

Page 24: Just in time

Supplier Management

• Elimination inspection of parts

• Communicate problems to suppliers in a positive manner.

Page 25: Just in time

4th Principle Of JIT

Inventory Management

Page 26: Just in time

Inventory Management

• Eliminate Safety Stock = Zero Inventory

• JIT is not an inventory control system

• Reduction in inventory opens up space

Page 27: Just in time

• Inventory hides problems in a process.

• Water Level = Inventory• Rocks = Problems in the

system• Boat = Company Operations

Page 28: Just in time

JIT Manufacturing Building Blocks

• Product design

• Process design

• Personnel/organizationalelements

• Manufacturing planning and control

Page 29: Just in time

1. Product Design• Standard parts

• Design Simplification

• Highly capable production systems

• Concurrentengineering

Page 30: Just in time

Design Simplification

Page 31: Just in time

2. Process Design

• Small lot sizes

• Setup time reduction

• Limited work in process

• Quality improvement

• Production flexibility

• Little inventory storage

Page 32: Just in time

Quality Improvement

• Autonomation

– Automatic detection of defects during production

• Jidoka

– Japanese term for autonomation

Page 33: Just in time

Production Flexibility• Reduce downtime by reducing changeover

time

• Use preventive maintenance to reduce breakdowns

• Cross-train workers to help clear bottlenecks

• Use many small units of capacity• Reserve capacity for important customers

Page 34: Just in time

3. Personnel/Organizational Elements

• Workers as assets

• Cross-trained workers

• Continuous improvement

• Leadership

Page 35: Just in time

4. Manufacturing Planning and Control

• Pull systems

• Visual systems (kanban)

• Close vendor relationships

• Reduced transaction processing (delays in delievery)

• Preventive maintenance

Page 36: Just in time

Comparison of JIT and Traditional

Factor Traditional JIT

Inventory Much to offset forecast errors, late deliveries

Minimal necessary to operate

Deliveries Large Small

Lot sizes Large Small

Setup; runs Few, long runs Many, short runs

Vendors Long-term relationships are unusual

Partners

Workers Necessary to do the work

Assets

Page 37: Just in time

JIT in Services

The basic goal of the demand flow technology in the service organization is to provide optimum response to the customer with the highest quality service and lowest possible cost.

Page 38: Just in time

Benefits of JIT Systems

• Increased equipment utilization

• Reduced scrap and rework

• Reduced space requirements

• Pressure for good vendor relationships

• Reduced need for indirect labor

Page 39: Just in time

ADVANTAGES

• Reduced Setup time , also known as ‘Changeover’ time.

• Funds tied up in inventories can be used elsewhere.

• Storage area used up can be utilized.

• Throughput Time is reduced resulting in greater output

• Production scheduling and work hour consistency is synchronized with demand.

Page 40: Just in time

• Supplies come in regular intervals throughout the production day

• The risk of inventory breaking/expiring is reduced largely.

• Inventory flow becomes simpler and easier to manage due to smaller lot sizes.

• Cuts the risk of supply system problems.

Page 41: Just in time

Disadvantages

• Every job is a ‘High Stress’ Rush order

• Balanced systems MUST be in place

• Setup times will greatly impact throughput

• Any problem will lead to unhappy customers (either internal or external)