First look for the best position of the solar collector on the roof-as close as possible to the boiler for less piping where heat loss is possible-placed on the south side of the roof-best angle: 45°

Page 6: Installatie

Remove roof tiles and drill a hole in the isolation of the roof

Page 7: Installatie

Use a grinder to modify the roof tiles so the aluminum strip can pass

Page 8: Installatie

Bend the aluminum strip so the frame can be mounted on the roof

Page 9: Installatie
Page 10: Installatie

Connect the vertical aluminum bars with bolts

Page 11: Installatie

Mount the horizontal bars, the manifold and the tail stock with bolds

Page 12: Installatie
Page 13: Installatie

Screw the inox pipe to the manifold

Page 14: Installatie

Tube isolation of HT Armaflex through roof tile with air vent

Page 15: Installatie
Page 16: Installatie
Page 17: Installatie
Page 18: Installatie

Take off the cap and push the vacuum tube through the tail stock

Page 19: Installatie

Put heat conduction past on the copper end -for maximum heat exchange-to prevent leaks

Page 20: Installatie
Page 21: Installatie

Put the evacuated tubes in the manifold